Summary

PRCTI20251541
Commercial - Tenant Improvement/Remodel
Returned for Correction
Alteration/Remodel
Interior Tenant Improvement, including installing shelving fixtures, interior painting, installing security camera. No MEP work involve and no exterior work. - MINISO
11/26/2025

Locations

Address
3500 S MERIDIAN, Unit: 325, PUYALLUP, WA 98373

3500 S Meridian, Suite #325, Puyallup WA 98373

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 12/24/2025 12/12/2025
Engineering Traffic Review Approved 12/24/2025 12/09/2025
Building Review Failed 12/24/2025 12/09/2025
Fire Review Approved 12/24/2025 12/08/2025
Planning Review Approved 12/24/2025 12/05/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $108.71 $108.71 Paid 12/04/2025
Outstanding Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $0.00 Not payable Not Paid
Building Permit Fee $167.25 $0.00 Not payable Not Paid
WA State Building Code Council Fee (Commercial) $25.00 $0.00 Not payable Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of Puyallup • L&I Final required prior to Fire Final • Exit lighting test required contractor to provide light meter • Separate permits required for fire alarm and fire sprinkler • RTU’S will be required to be tested for shut down. • Fire extinguishers required per code • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Ready to Issue - Need Contractor Info Open Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
12/01/2025 Letter Incomplete Submittal Notice
12/04/2025 Receipt Receipt for transaction:2025-002293
12/12/2025 Letter Permit Review Correction Letter
12/12/2025 Form SOUTH HILL MALL Application-for-Building-Permit-0 (Flattened)
12/12/2025 Plans South Hill Mall Floor Plan 12_2_25 (Flattened)
12/12/2025 Plans CONTRUCTION PLANS - CURRENT FLOOR PLAN (Flattened)