Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Plan Review Fee | $254.31 | $254.31 | Paid | 10/21/2022 |
Building Permit Fee (Demolition) | $136.94 | $136.94 | Paid | 11/22/2022 |
$391.25
|
||||
Resubmittal Fee | $130.00 | $130.00 | Paid | 11/10/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $521.25 | $521.25 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Demolition Final Inspection | Failed | 3/2/2023 | 3/2/2023 | 03/02/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/02/2023
1. cap plumbing as discussed with contractor
|
||||
Utility Capping Inspection | VOID | 3/3/2023 | 3/3/2023 | 03/03/2023 |
Jeff Hill ((253) 204-5633) | ||||
Demolition Final Inspection | Passed | 3/3/2023 | 03/03/2023 | |
Kevin Spruell ((253) 841-5590) | ||||
Erosion And Sediment Inspection | VOID | 03/03/2023 | ||
Kevin Spruell ((253) 841-5590) | ||||
Job Start Inspection | VOID | 03/03/2023 | ||
Kevin Spruell ((253) 841-5590) | ||||
Demolition Final Inspection | VOID | 03/03/2023 | ||
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/02/2023
1. cap plumbing as discussed with contractor
|
||||
Engineering Final Inspection | VOID | 03/03/2023 | ||
Kevin Spruell ((253) 841-5590) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
There are two sets of conditions for this project. The first set is for Demo and the second set is for construction. The construction set should be reviewed asap.
Demo
• Fire extinguishers are required during construction.
• Fire Sprinkler system required to be monitored throughout construction. System may only be put in test for 8hrs. Approval from Fire Code Official required for periods longer than 8hrs.
• Fire Alarm Control Panel required to be fully functional throughout construction. System may only be put in test for 8hrs. Approval from Fire Code Official required for periods longer than 8hrs.
• Separate permits required for Fire Alarm and Fire Sprinkler.
• A Knox box is required at the front entry on the exterior of the building.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box.
• All above items to be completed prior to fire final. Fire final required before building final.
Construction
• Comply with 2018 IFC and 2018 IBC.
• Building address are required. Comply with municipal code.
• Total coverage required in the city of puyallup.
• L&I Final required prior to Fire Final.
• Exit lighting test required, contractor to provide light meter.
• Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results.
• Fire Sprinkler system will be required to have all maintenance and inspections completed prior to Final.
• Separate permits required for Fire Alarm and Fire Sprinkler.
• RTU’S will be required to be tested for shut down.
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code.
• Elevators – L&I Final required prior to inspection; Fire Alarm contractor required for inspection. All maintenance and inspections are required prior to Final.
• A Knox box is required at the front entry on the exterior of the building.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box.
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box.
• All above items to be completed prior to fire final. Fire final required before building final.
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Development & Permitting Services
NEED CONTRACTOR & COP BUS LIC ALONG W/FEES PAID PRIOR TO ISSUANCE, EMAILED APPLICANT THIS DATE ~ JJ
REC'D THIS DATE, ADDED AND PERMIT WAS ISSUED ~ JJ
|
There are no related items for this permit application.
Date Uploaded | File Type | Name |
---|---|---|
10/21/2022 | Receipt | Receipt for transaction:2022-002120 |
11/10/2022 | Receipt | Receipt for transaction:2022-002250 |
11/22/2022 | Plans | 201 W. Main - Demo App Drawings (Stamped) |
11/22/2022 | Form | Plumbing fixture worksheet_202012021825172385 (Stamped) |
11/22/2022 | Receipt | Receipt for transaction:2022-002334 |
01/26/2023 | Permit | Permit - Detailed |
03/02/2023 | Report | Inspection Report (Demolition Final Inspection) |
03/03/2023 | Report | Inspection Report (Demolition Final Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.