CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRDE20231000


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRDE20231000
Demolition
Permit(s) Issued
ASBJORNSEN JOYCE D
Demolition
Demolition of a single-family home, shed, and detached garage for future development.
07/10/2023
07/25/2023
02/10/2024

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
07/25/2023 SITE PLAN (Stamped)
07/25/2023 PSCAA Notification (Stamped)
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 07/31/2023 07/24/2023
Building Review Approved 07/31/2023 07/21/2023
Planning Review Approved 07/31/2023 07/21/2023

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Utility Capping Inspection Pending
Other/Miscellaneous
Outstanding
08/07/2023
- Need decommission cert for septic and well prior to final.

Engineering Final Inspection Pending
Demolition Final Inspection Pending
Monty Johnson ((253) 770-3326)
Erosion And Sediment Inspection Pending
Job Start Inspection Failed 8/2/2023 08/02/2023
Jason Little ((253) 435-3636)
Erosion And Sediment Inspection Partial Pass 8/14/2023 8/14/2023 08/14/2023
Michael Rosenau ((253) 841-5411)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Demolition Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard demolition conditions: ** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** 1. All inspections shall be requested through the CityView portal. The jobstart and erosion and sediment inspections shall be passed prior to starting work. 2. Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. 3. The applicant shall call the Utility Notification Center at 1-800-424-5555 before beginning any work. Call 811 before you dig, it's the law. Site-specific Conditions: - The applicant shall demolish the existing private well per Tacoma Pierce County Health Department standards or install an approved reduced pressure backflow device on the City water service. A well decommissioning certificate shall be filed with Pierce County and a copy submitted to the City of Puyallup. - The applicant is responsible to demolish the existing septic system per Tacoma Pierce County Health Department standards. A septic decommissioning certificate is required to be filed with Pierce County and a copy submitted to the City of Puyallup. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.

Related Permit & Planning Applications

Reference Number Status Type
PRDE20231001 Permit(s) Issued Demolition
PRDE20231002 Permit(s) Issued Demolition

Documents & Images

Date Uploaded File Type Name
07/25/2023 Other PSCAA Notification (Stamped)
07/10/2023 Form Freeman Logistics Demo App - 5001 Signed
07/25/2023 Plans SITE PLAN (Stamped)
07/25/2023 Permit Permit - Detailed
08/02/2023 Report Inspection Report (Job Start Inspection)
08/07/2023 Report Inspection Report (Job Start Inspection)
01/09/2024 Letter Permit Expiration Notice


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.