CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

PRFUP20221747


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRFUP20221747
Franchise Utility Permit
Canceled
NORTHWEST PIPELINE CORP
Utility
JB0001185145 Phase 4 - Comcast proposes to overlash 86CT Fiber to existing strand ~6895' - PER SEFNCO PROJECT WAS CANCELLED CT
11/14/2022
11/29/2022
09/20/2023

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
11/29/2022 1185145_The Rock WFK_PH-3 & 4_Design (Stamped)
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 12/05/2022 11/28/2022

Fees

Paid Fees Amount Paid Owing Date Paid
E Franchise ROW Inspection Fee $130.00 $130.00 Paid 11/14/2022
Franchise Traffic Control Fee $90.00 $90.00 Paid 11/14/2022
ROW Permit Fee $80.00 $80.00 Paid 11/14/2022
Franchise Utility Review Fee $110.00 $110.00 Paid 11/14/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Engineering Div Inspection VOID 03/24/2023
Cheryl Trimble ((253) 841-5464)
Job Start Inspection VOID 03/24/2023
Cheryl Trimble ((253) 841-5464)
Engineering Final Inspection VOID 03/24/2023
Cheryl Trimble ((253) 841-5464)
Closeout All Work Complete (No Restoration) Inspection VOID 03/24/2023
Cheryl Trimble ((253) 841-5464)
Close All Restoration Complete Inspection VOID 03/24/2023
Cheryl Trimble ((253) 841-5464)

Conditions

Condition Status Department Category Expiration Date Due Date
Private Utility Permit Conditions Open Standard Conditions
: Development Engineering standard franchise utility conditions: Site-specific Conditions: NIGHT WORK REQUIRED. CLOSURE ALLOWED AS SEEN ON EACH PAGE OF THE TCP. Call communications center at 253-287-4456 on night of closure. Request a job start inspection through the CityView portal and leave a message for the inspectors by calling 253-435-3650 at least 48 hours in advance of job start. The applicant shall notify all residents and businesses within 300 feet of the work area 48 hours in advance of start date by distributing informational door hangers, displaying work on message boards, or on signs posted visibly along the right-of-way. The City-issued permit packet shall be posted at the job site and available to inspectors at all times. The applicant shall contact Tamara Ferrin, Puyallup Police Department Support Specialist, at 253-841-5436 or tame@puyallupwa.gov to coordinate traffic support with a uniformed police officer at least 24 hours of job start. When shifting traffic into a turn lane, use of double cones is required. Traffic device spacing shall be half distance for opposing traffic devices. All aerial crossings at an intersection shall be a maximum of 3 minutes. The applicant shall coordinate redundant traffic control devices with other traffic control plans authorized near this site. All vehicles, equipment, and personnel are prohibited at all times from occupying any portion of the railroad crossing. Railroad crossing signs and striping shall be visible at all times. Vehicle and pedestrian traffic shall not be queued on the railroad crossing. The City does not authorize or permit work outside Puyallup City Limits. It is the applicant's responsibility to obtain the necessary permits from the jurisdictional agency where the work is to be performed prior to starting. Applicant/Contractor Responsibility: 1. The issued permit and traffic control plan(s) are always required to be available at the job site and readily available to all City inspectors. The applicant shall be subject to a triple permit fee for failing to have a valid permit on site. 2. The applicant/contractor shall notify the City 24-48 hours prior to starting work by requesting an inspection through the CityView portal. Weekend and night work require a minimum of 48 business hours’ advanced coordination with a City inspector. 3. The applicant/contractor shall notify residents within 300 feet of the work area 48 hours prior to starting work by distributing door hangers, displaying message boards, or posting signs visibly along the right-of-way. 4. The applicant/contractor shall notify the City prior to site restoration, immediately after all work and restoration are complete, and when the site is ready for final inspection. The applicant/contractor shall request a final inspection through the CityView portal prior to the permit expiration date. General Conditions: 1. Comply with all permit conditions and the Traffic Control Plans (TCP) issued by the City. 2. Follow the allowed work hours as listed on the issued permit or on each page of the TCP. 3. If a travel lane will be closed, the applicant/contractor shall call the Communications Center at 253-287-4456 prior to starting work on day of closure and again once the lane is reopened. 4. Spotter must be available to assist with pedestrians if needed. 5. Request all inspections through the CityView portal on the City website. 6. Please utilize the traffic control standards below in addition to the TCP: - Traffic control devices shall be 28-inch retro-reflective cones. - Taper length equals width of offset times speed limit squared divided by 60. - Sign spacing shall be 100 feet when speed limit is 30 mph or less. - Sign spacing shall be 350 feet when speed limit is greater than 30 mph. - Distance between cones equals speed limit in unit-feet. - Distance between signs is mandatory unless field conditions determine otherwise. - Travel lane width must be a minimum of 11 feet at all times. - Any and all flaggers and spotters shall remain in radio contact at all times. 7. Open cut is not permitted without prior approval from the City. 8. Do not park vehicles on City sidewalk. Any public curb, gutter, or sidewalk broken now or during construction shall be removed and replaced per City Standards. 9. The applicant shall notify property owners of blocked driveways at least 24 hours in advance. 10. Inspections performed during a regular 8-hour day Monday through Friday 7:00 am - 5:00 pm is included in the permit fee. Inspection time performed outside of these hours are charged to the permit holder at a rate of $130.00 per hour with a three-hour minimum. 11. The applicant shall comply with Puyallup Municipal Code Chapter 11.05 while working in the public right-of-way. Indemnification / Hold Harmless: The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
11/29/2022 Plans 1185145_The Rock WFK_PH-3 & 4_Design (Stamped)
11/14/2022 Form 1185145 ROW Private Utility Permit
11/14/2022 Receipt Receipt for transaction:2022-002257
11/17/2022 Night Traffic Control_9.11.20
11/29/2022 Permit Permit - Detailed


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.