Summary

PRFUP20240492
Franchise Utility Permit
Permit(s) Issued
MULTICARE HEALTH SYSTEM
Utility
PERMIT EXT TO 02/02/2025 Lumen to overlash/place new fiber across 7 poles, and access existing MHJob# N.9815000
03/22/2024
05/08/2024
02/02/2025

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
05/08/2024 SITE PLAN (Stamped)
05/08/2024 TCP (Stamped)
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 05/08/2024 05/07/2024
Engineering Review Failed 04/24/2024 04/11/2024

Fees

Paid Fees Amount Paid Owing Date Paid
E Franchise ROW Inspection Fee $180.00 $180.00 Paid 03/27/2024
Franchise Traffic Control Fee $90.00 $90.00 Paid 03/27/2024
ROW Permit Fee $80.00 $80.00 Paid 03/27/2024
Franchise Utility Review Fee $110.00 $110.00 Paid 03/27/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Close All Restoration Complete Inspection Pending
Job Start Inspection Pending
Comment Engineering Div Inspection Pending
Closeout All Work Complete (No Restoration) Inspection Pending
Engineering Final Inspection Pending
Job Start Inspection Partial Pass 8/19/2024 08/20/2024
Jason Little ((253) 244-0387)
Job Start Inspection Not Ready 8/21/2024 8/21/2024 08/21/2024
Cheryl Trimble ((253) 290-9834)
Job Start Inspection Not Ready 8/22/2024 8/23/2024 08/22/2024
Cheryl Trimble ((253) 290-9834)
Comment Engineering Div Inspection Not Ready 08/23/2024
Cheryl Trimble ((253) 290-9834)
Comment Engineering Div Inspection Not Ready 8/26/2024 08/26/2024
Cheryl Trimble ((253) 290-9834)
Comment Engineering Div Inspection Partial Pass 8/27/2024 08/28/2024
Jeff Hill ((253) 204-5633)
Comment Engineering Div Inspection Partial Pass 9/17/2024 9/17/2024 09/17/2024
Cheryl Trimble ((253) 290-9834)
Comment Engineering Div Inspection Partial Pass 09/24/2024
Cheryl Trimble ((253) 290-9834)

Conditions

Condition Status Department Category Expiration Date Due Date
Private Utility Permit Conditions Open Engineering Division Standard Conditions
: Development Engineering standard franchise utility conditions: Site-specific Conditions: CLOSURE ALLOWED: Monday - Thursday 9AM - 2PM Call communications center at 253-287-4456 on day of closure. Request a job start inspection through the CityView portal. Public notification shall comply with PMC Chapter 11.05.110. The City-issued permit packet shall be posted at the job site and available to inspectors at all times. The permit holder shall notify MultiCare Good Samaritan Hospital by contacting Aaron Piche, Manager of Engineering Services, at aaron.piche@multicare.org and Heidi Rock at heidi.rock@multicare.org with the proposed impacts and closure hours at least 48 hours in advance of job start. No emergency service vehicle travel routes shall be blocked or rerouted. In a safe manner, flaggers shall prioritize travel for emergency service vehicles. Puyallup construction restriction zones and routes shall be in effect during special events in downtown Puyallup or at the Washington State Fair. No work is allowed in the public right-of-way as defined by the Puyallup "Construction Restriction Zone & Routes Map." A 10" diameter core drill is allowed for potholing. For pothole windows larger than 10" in diameter or trenching completed in existing roadway, the contractor shall restore the pavement by installing the trench patch and then grinding/overlaying. All roadway restoration and street patches shall comply with City Standard Detail 01.01.20. Restoration limits and requirements shall be at the discretion of the City. All proposed franchise utilities shall be located within a recorded utility easement or in the public right-of-way as determined by the City of Puyallup. The City of Puyallup does not authorize or permit utility work on private property. 5TH ST SE north of 15TH AVE SE and 14TH AVE SE east of 5TH ST SE are private roadways and not public right-of-way. The City of Puyallup does not authorize or permit work on private property. The permit holder shall be responsible to obtain the necessary permissions or permits from all property owners or jurisdictional agencies prior to starting work. Applicant/Contractor Responsibility: 1. The issued permit and traffic control plan(s) are always required to be available at the job site and readily available to all City inspectors. The applicant shall be subject to a triple permit fee for failing to have a valid permit on site. 2. The applicant/contractor shall notify the City 24-48 business hours prior to starting work by requesting an inspection through the CityView portal. Inspections performed during a City of Puyallup business day (Monday - Friday 7:00 am – 3:30 pm) are included in the permit fee. Inspections performed outside of the regular hours are charged to the permit holder at the current City of Puyallup Fee Schedule inspection rate with a three-hour minimum. Prior to scheduling weekend and night work, coordinate with a City Inspector by calling 253-435-3650 at least 48 business hours in advance of work. 3. Public notification shall comply with PMC Chapter 11.05.110. The applicant/contractor shall notify property owners of blocked driveways at least 24 hours in advance. Additionally, the applicant/contractor shall notify public transportation agencies whose routes or stops are affected by the traffic control plan 24 hours in advance of job start (Pierce County Transit Construction Coordinator: 253-581-8000). 4. The applicant/contractor shall notify the City prior to site restoration, immediately after all work and restoration are complete, and when the site is ready for final inspection. The applicant/contractor shall request a final inspection through the CityView portal prior to the permit expiration date. General Conditions: 1. Comply with all permit conditions and the Traffic Control Plans (TCP) issued by the City. 2. Follow the allowed work hours as listed on the issued permit or on each page of the TCP. 3. If a travel lane will be closed, the applicant/contractor shall call the Communications Center at 253-287-4456 prior to starting work on day of closure and again once the lane is reopened. 4. Spotter must be available to assist with pedestrians if needed. 5. Request all inspections through the CityView portal on the City website. Prior to scheduling weekend and night work, coordinate with a City Inspector by calling 253-435-3650 at least 48 business hours in advance of work. 6. Please utilize the traffic control standards below in addition to the conditions listed on the TCP: - Traffic control devices shall be 28-inch retro-reflective cones. - Taper length equals width of offset times speed limit squared divided by 60. - Sign spacing shall be 100 feet when speed limit is 30 mph or less. - Sign spacing shall be 350 feet when speed limit is greater than 30 mph. - Distance between cones equals speed limit in unit-feet. - Distance between signs is mandatory unless field conditions determine otherwise. - Travel lane width must be a minimum of 11 feet at all times. - Any and all flaggers and spotters shall remain in radio contact at all times. - All aerial crossings at an intersection shall be a maximum of 3 minutes. - When shifting traffic into a turn lane, use of double cones is required. Traffic device spacing shall be half distance for opposing traffic devices. 7. Open cut is not permitted without prior approval from the City. STEEL PLATE AHEAD and MOTORCYCLISTS USE EXTREME CAUTION advanced warning signs are required for steel plates installed in the public right-of-way. 8. Do not park vehicles on City sidewalk. Any public curb, gutter, or sidewalk broken now or during construction shall be removed and replaced per City Standards. 9. All vehicles, equipment, and personnel are prohibited at all times from occupying any portion of a railroad crossing. Railroad crossing signs and striping shall be visible at all times. Vehicle and pedestrian traffic shall not be queued on any railroad crossing. 10. No disruption of signal timing allowed at signalized intersection unless the traffic control plan depicts a uniformed police officer at the intersection. If a uniformed police officer is depicted, the applicant/contractor shall contact Meghan Genge, Puyallup Police Department Support Specialist, at 253-841-5436 or mgenge@puyallupwa.gov to coordinate traffic support with a Puyallup uniformed police officer at least 24 hours of job start. 11. Puyallup construction restriction zones and routes shall be in effect during special events in downtown Puyallup or at the Washington State Fair. During these events, no work is allowed in the public right-of-way as defined by the Puyallup "Construction Restriction Zone & Routes Map." 12. The applicant shall comply with Puyallup Municipal Code Chapter 11.05 while working in the public right-of-way. 13. Work and traffic control at each permitted location shall be asynchronous with other issued permits held by this permit holder, even if the work is related. Advanced inspection scheduling with the City Inspector is required for multiple permits and locations to ensure adequate inspections. Inspection scheduling shall be at the discretion of the City Inspector. Working without advanced notice to the City is strictly prohibited and may result in penalties or stop work orders.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
03/27/2024 Receipt Receipt for transaction:2024-000601
04/11/2024 Form APPLICATION - 615 14TH AVE SE (Flattened)
04/11/2024 Letter Permit Review Correction Letter
05/08/2024 Permit Permit - Detailed
05/08/2024 Letter Permit Job Card
05/08/2024 Plans SITE PLAN (Stamped)
05/08/2024 Plans TCP (Stamped)
07/05/2024 Letter Permit Expiration Notice
09/24/2024 Report Inspection Report (Comment Engineering Div Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.