Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee | $4,264.50 | $4,264.50 | Paid | 10/05/2022 |
Building Plan Review Fee | $2,771.93 | $2,771.93 | Paid | 08/29/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 10/05/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 09/27/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $7,191.43 | $7,191.43 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Roof Sheathing Inspection | Passed | 10/26/2022 | 10/26/2022 | 10/26/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Comment Building Div Inspection | Partial Pass | 11/9/2022 | 11/9/2022 | 11/09/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Re-Roof Inspection | Failed | 1/25/2023 | 1/25/2023 | 01/25/2023 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/25/2023
1; provide manufacturers warranty at time of final inspection.
2 ; reconnect all electrical boxes to wall or a approved location with sealed electrical conduit.
3 ; complete all condensate drain as discussed with contractor.
4 ; repair damaged termination cap at south side of roof.
5 ; complete all downspout as discussed with contractor.
|
||||
Building Final Inspection | Not Ready | 1/31/2023 | 1/31/2023 | 01/31/2023 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/31/2023
cancel per contractor - not ready
|
||||
Building Final Inspection | Passed | 2/3/2023 | 2/3/2023 | 02/03/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
02/03/2023
cancel per contractor - not ready
|
||||
Comment Building Div Inspection | VOID | 02/03/2023 | ||
Kevin Spruell ((253) 841-5590) | ||||
Re-Roof Inspection | VOID | 02/03/2023 | ||
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
01/25/2023
1; provide manufacturers warranty at time of final inspection.
2 ; reconnect all electrical boxes to wall or a approved location with sealed electrical conduit.
3 ; complete all condensate drain as discussed with contractor.
4 ; repair damaged termination cap at south side of roof.
5 ; complete all downspout as discussed with contractor.
|
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Re-Roof Conditions | Open | Standard Conditions |
RE-ROOF
1) PROVIDE MANUFACTURES SPECIFICATIONS AND INSTALLATION DETAILS ON SITE FOR INSPECTION
2) CALL FOR REQUIRED INSPECTIONS PRIOR TO COVER; REQUIRED FOR SHEATHING REPLACEMENT, STRUCTURAL REPAIR OR INSULATION
3) PROVIDE INSPECTION ACCESS
4) PROVIDE A COPY OF THE PERMIT ON SITE
***MUST PROVIDE DRIP EDGE ON ALL ROOF EDGES***
|
||
Contaminated Site Remediation | Open | Standard Conditions |
Engineering Division
The subject property has been classified as a contaminated site by the Tacoma Pierce County Health Department (TPCHD) and must be remediated per Washington Administrative Code Title 173. It is the applicant’s responsibility to coordinate cleanup with TPCHD. Visit https://www.tpchd.org/healthy-places/contaminated-property-cleanup for more information. The applicant shall request a remediation status report from TPCHD’s Rob Olsen by emailing him at rolsen@tpchd.org. Provide a copy of the status report to the City.
|
||
Miscellaneous Condition | Open | Submit With Building Permit Application |
Development & Permitting Services
FRUITLAND W/A REQUIRED AT TIME OF SUBMITTAL. SENT EMAIL -JF 8.31.22
susan@clifford-lee.com
|
There are no related items for this permit application.
Date Uploaded | File Type | Name |
---|---|---|
08/29/2022 | Receipt | Receipt for transaction:2022-001693 |
09/27/2022 | Receipt | Receipt for transaction:2022-001911 |
10/04/2022 | Other | 2403 SUBMITTAL (Stamped) |
10/04/2022 | Other | 00 WM #2403 Puyallup, WA - (PreCon Full Summary) (Stamped) |
10/04/2022 | Plans | 04 Damaged Insulation Extents (Stamped) |
10/05/2022 | Permit | Permit - Detailed |
10/05/2022 | Letter | Permit Job Card |
10/26/2022 | Report | Inspection Report (Roof Sheathing Inspection) |
11/09/2022 | Report | Inspection Report (Comment Building Div Inspection) |
01/25/2023 | Report | Inspection Report (Re-Roof Inspection) |
01/31/2023 | Report | Inspection Report (Building Final Inspection) |
02/03/2023 | Roof system warranty page 1 | |
02/03/2023 | Roof system warranty page 2 | |
02/03/2023 | Report | Inspection Report (Building Final Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.