PRUSR20220749


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRUSR20220749
Utility Service Repair/PRIVATE PROPERTY ONLY
Closed
DON'S DRIVE-IN INC
Repair
Spot repair of sewer line from outside front door of business to inside front door
05/03/2022
05/11/2022
12/20/2022
06/23/2022

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
05/11/2022 dons drive in0 (Flattened)
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 05/09/2022 05/11/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Sewer Line Repair Inspection Fee (Private) $170.00 $170.00 Paid 05/03/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Engineering Div Inspection Passed w/ Conditions 5/12/2022 5/12/2022 05/12/2022
Jason Little ((253) 244-0387)
Job Start Inspection Passed w/ Conditions 5/12/2022 05/12/2022
Jason Little ((253) 244-0387)
Engineering Final Inspection Partial Pass 5/16/2022 05/16/2022
Jason Little ((253) 244-0387)
Engineering Final Inspection Failed 5/19/2022 05/19/2022
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
05/19/2022
1. C/O needs to say sewer. 2. Concrete debris needs to be cleaned up. 3. Concrete edges should have been saw cut prior to pour. 4. C/O's at the building are about an inch low. 5. Call for an on site meeting.

Engineering Final Inspection Failed 6/3/2022 06/03/2022
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/03/2022
1. C/O needs to say sewer. 2. Concrete debris needs to be cleaned up. 3. Concrete edges should have been saw cut prior to pour. 4. C/O's at the building are about an inch low. 5. Call for an on site meeting.

Engineering Final Inspection Passed 06/23/2022
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Resolved
06/23/2022
1. C/O needs to say sewer. 2. Concrete debris needs to be cleaned up. 3. Concrete edges should have been saw cut prior to pour. 4. C/O's at the building are about an inch low. 5. Call for an on site meeting.

Conditions

Condition Status Category
Right Of Way Permit Conditions Open Standard Conditions
Engineering Division
All work approved is on private property. No work is allowed within the public right-of-way.
Utility Service Repair Standard Condition Open Standard Conditions
THE APPLICANT IS RESPONSIBLE TO SCHEDULE ALL UTILITY INSPECTIONS PRIOR TO BACKFILLING Work between the hours of 9am & 3pm Call Comm Center day(s) of lane closure at 253-287-4456.Inspection time performed during a regular 8 hour day Monday - Friday 7:00 am - 5:00 pm is included in the permit fee. Inspection time performed outside of those hours are charged to the permit holder at a rate of $130 per hour with a three hour minimum.1. Applicant/contractor shall notify the City within 48 hours prior to work start date and also to close the permit when all work and restoration are complete and ready for final inspection. 2. I agree to have the approved permit on site at all times. 3. The Applicant is responsible to call the Engineering inspection line at 253-435-3650 to schedule a utility inspection prior to backfilling.4. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.5. I agree to keep the existing right of way free of debris and dirt.6. I agree to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.7. I agree to adhere to the approved Traffic Control Plan.8. I agree to perform all work in accordance with City's Standards. Any curb, gutter or sidewalk broken now or during construction shall be removed and replaced.9. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
05/03/2022 Receipt Receipt for transaction:2022-000818
05/11/2022 Form DonsUtilityConnectionPermit0 (Flattened)
05/11/2022 Plans dons drive in0 (Flattened)
05/11/2022 Permit Permit - Detailed
05/11/2022 Letter Permit Job Card
05/16/2022 Report Inspection Report (Engineering Final Inspection)
05/19/2022 Report Inspection Report (Engineering Final Inspection)
06/03/2022 Report Inspection Report (Engineering Final Inspection)