Summary

B-20-0993
Commercial - Addition
Permit(s) Issued
PUYALLUP SCH DIST #3
Addition
10-CLASSRM ADDITION TO THE EXISTING JHS ~ FERRUCCI JHS *E-20-0612 CIVIL*STOP WORK ORDER removed on 03/29/2023 by username 'Jeff Hill'.
12/22/2020
06/01/2021
05/11/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Traffic Review Approved 05/27/2021
Engineering Traffic Review Approved 05/26/2021
Building Review Approved 04/05/2021
Engineering Review Approved 04/01/2021
Fire Review Approved 03/09/2021
Building Review Incomplete 03/01/2021
Building Review Incomplete 02/12/2021
Planning Review In Progress 02/11/2021

Fees

Paid Fees Amount Paid Owing Date Paid
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 05/28/2021
No
Planning Building Permit Fee $120.00 $120.00 Paid 05/28/2021
No
Plumbing Plan Review Fee $610.68 $610.68 Paid 05/28/2021
No
Sewer System Development Charge $31,575.76 $31,575.76 Paid 05/28/2021
No
Building Division Fee (Hourly) $130.00 $130.00 Paid 05/28/2021
No
Mechanical Plan Review Fee $493.58 $493.58 Paid 05/28/2021
No
Water System Development Charge $20,057.33 $20,057.33 Paid 05/28/2021
No
Plumbing Permit Fee $939.50 $939.50 Paid 05/28/2021
No
Planning Landscape Review Fee $300.00 $300.00 Paid 05/28/2021
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 05/28/2021
No
Mechanical Permit Fee $759.35 $759.35 Paid 05/28/2021
No
Traffic Impact Fee $79,155.00 $79,155.00 Paid 05/28/2021
No
Building Re-Inspection Fee $130.00 $130.00 Paid 09/16/2022
Inspection Fee - Outside Of Business Hours $390.00 $390.00 Paid 10/12/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Final Inspection Pending
Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Carbon Monoxide Detectors Inspection Pending
Shannon King ((253) 840-6684)
Planning Final Inspection Pending
Combination Frame And Rough In Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
05/17/2022
1 ; inspection of slip connection at exterior walls of commons additions only.

Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
09/01/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Outstanding
09/01/2022
5 rooms on 2nd fl - ok

Other/Miscellaneous
Outstanding
09/01/2022
1 ; complete all ceiling grid requirements as per city approved plans. - not ready

Other/Miscellaneous
Outstanding
09/01/2022
1. No corridor 2. Complete main bar tie wire at perimeter that exceeds 1and 6 3. Ok to complete cut tiles

Other/Miscellaneous
Outstanding
09/01/2022
1. Not ready

Other/Miscellaneous
Outstanding
09/01/2022
1. ok to due perimeter only basement,1st floor, 2nd floor coridor SE addition 2. complete all sealing of all fire rated penatrations 3. seal penatrations of plenum

Foundation/Rebar Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Pending
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Final Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
09/06/2022
Plumbing General life safety inspection. Final scheduled for Tuesday.

Building Final Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
11/08/2024
1 ; provide engineering final prior to building final .

Engineering Final Inspection Pending
Comment Engineering Div Inspection Pending
Mechanical Final Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
04/18/2023
Mechanical Mechanical room - Complete Sample tube - verify correct installation Duct detector - in mechanical room not working Lobby areas floor 1-3 reinspection required - will require removal of subsancial ceiling tile for inspection Provide sealed - revised plans from ERO for duct replacement in the lower level; reference emails Damper functional test completee 7 devices at the 2nd and 3rd floors

Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
09/19/2022
1. ceilings approved pending exit signage per conversation with Dennis

Building Final Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
10/14/2022
TCO will be prepared for issuance tomorrow, 30 days TCO The contractor shall provide continuous safety oversite for all remaining work. The inspection was for minimum life safety standards.

Foundation/Rebar Inspection In Progress 7/22/2021 07/22/2021
Shannon King ((253) 840-6684)
Frame Inspection Comments 8/3/2021 08/03/2021
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection In Progress 8/3/2021 08/03/2021
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection In Progress 8/10/2021 08/10/2021
Shannon King ((253) 840-6684)
Footing/Setback Inspection In Progress 8/16/2021 08/16/2021
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection In Progress 8/18/2021 08/18/2021
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection In Progress 8/23/2021 08/23/2021
Shannon King ((253) 840-6684)
Frame Inspection In Progress 8/27/2021 08/27/2021
Gary Webster ((253) 841-5590)
Plumbing Rough In Inspection In Progress 8/31/2021 08/31/2021
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection In Progress 9/7/2021 09/07/2021
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection In Progress 9/8/2021 09/08/2021
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Comments 9/13/2021 09/13/2021
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection In Progress 9/13/2021 09/13/2021
Shannon King ((253) 840-6684)
Footing/Setback Inspection In Progress 9/14/2021 09/14/2021
Gary Webster ((253) 841-5590)
Plumbing Rough In Inspection In Progress 9/22/2021 09/22/2021
Shannon King ((253) 840-6684)
Footing/Setback Inspection In Progress 9/22/2021 09/22/2021
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection In Progress 9/22/2021 09/22/2021
Shannon King ((253) 840-6684)
Comment Building Div Inspection Comments 9/23/2021 09/23/2021
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection In Progress 09/24/2021
Gary Webster ((253) 841-5590)
Mechanical Rough In Inspection Comments 9/24/2021 09/24/2021
Gary Webster ((253) 841-5590)
Frame Inspection Comments 9/24/2021 09/24/2021
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection In Progress 9/29/2021 09/29/2021
Gary Webster ((253) 841-5590)
Plumbing Rough In Inspection In Progress 10/8/2021 10/08/2021
Gary Webster ((253) 841-5590)
Frame Inspection In Progress 10/8/2021 10/08/2021
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection In Progress 10/13/2021 10/13/2021
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Not Ready 10/13/2021 10/13/2021
Shannon King ((253) 840-6684)
Frame Inspection In Progress 10/13/2021 10/13/2021
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection In Progress 10/15/2021 10/15/2021
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection In Progress 10/15/2021 10/15/2021
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection In Progress 10/21/2021 10/21/2021
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Comments 10/26/2021 10/26/2021
Shannon King ((253) 840-6684)
Comment Building Div Inspection Comments 11/10/2021 11/10/2021
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Comments 11/23/2021 11/23/2021
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection Partial Pass 1/14/2022 1/14/2022 01/14/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
01/14/2022
see grid & framing inspections for same day

Ceiling Grid/T-Bar Inspection Partial Pass 01/14/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
01/14/2022

Frame Inspection Partial Pass 01/14/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
01/14/2022

Combination Frame And Rough In Inspection Partial Pass 1/24/2022 1/24/2022 01/24/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
01/24/2022
1 ; inspection of slip connection at exterior walls of commons additions only.

Ceiling Grid/T-Bar Inspection Not Ready 1/27/2022 1/27/2022 01/27/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
01/27/2022
1 ; cancel per Dennis - not ready

Frame Inspection Not Ready 1/27/2022 1/27/2022 01/27/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
01/27/2022
1 ; talked with Dennis about pre-rock at top 4' of interior walls on 1side only.

Comment Building Div Inspection Partial Pass 1/27/2022 1/27/2022 01/27/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
01/27/2022
1 ; inspection of r-38 roof insulation at grid line - (13.1-6A,HA-Ea) as noted on sheet A3.10 of City approved plans

Ceiling Grid/T-Bar Inspection Partial Pass 1/28/2022 1/28/2022 01/28/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
01/28/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Carried Forward
01/28/2022
5 rooms on 2nd fl - ok

Comment Building Div Inspection Partial Pass 1/28/2022 1/28/2022 01/28/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
01/28/2022
1 ; inspection of r-38 roof insulation at grid line - (13.1-6A,HA-Ea) as noted on sheet A3.10 of City approved plans

Shear Wall Inspection Partial Pass 2/4/2022 2/4/2022 02/04/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/04/2022
area (A) - commons, 3/4" fire rated sheathing @ 6" min fastening - ok

Wallboard / Drywall Inspection Partial Pass 2/10/2022 2/10/2022 02/10/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/10/2022
inspection of firewall @ north stairs - 1" coreboard - ok

Mechanical Rough In Inspection Partial Pass 2/10/2022 2/10/2022 02/10/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/10/2022
underground domestic & supply - ok

Wallboard / Drywall Inspection Partial Pass 2/16/2022 2/16/2022 02/16/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/16/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Foundation/Rebar Inspection Partial Pass 2/16/2022 2/16/2022 02/16/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/16/2022
progressing with special inspections

Shear Wall Inspection Not Ready 2/25/2022 2/25/2022 02/25/2022
Gary Webster ((253) 841-5590)
Wallboard / Drywall Inspection Not Ready 2/28/2022 2/28/2022 02/28/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
02/28/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Shear Wall Inspection Not Ready 3/1/2022 3/1/2022 03/01/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/01/2022
1 ; cancel per Dennis - not ready

Comment Building Div Inspection Not Ready 3/1/2022 3/1/2022 03/01/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/01/2022
1 ; talked with Dennis about final requirement for remodel of existing class rooms.

Wallboard / Drywall Inspection Not Ready 3/2/2022 3/2/2022 03/02/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/02/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
03/02/2022
TEST TEST TEST

Wallboard / Drywall Inspection Not Ready 3/7/2022 3/7/2022 03/07/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/07/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Resolved
03/07/2022
TEST TEST TEST

Ceiling Grid/T-Bar Inspection Not Ready 3/7/2022 3/7/2022 03/07/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/07/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Carried Forward
03/07/2022
5 rooms on 2nd fl - ok

Other/Miscellaneous
Carried Forward
03/07/2022
1 ; complete all ceiling grid requirements as per city approved plans. - not ready

Comment Building Div Inspection Partial Pass 3/7/2022 3/7/2022 03/07/2022
Shannon King ((253) 840-6684)
Shear Wall Inspection Partial Pass 3/8/2022 3/8/2022 03/08/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
03/08/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Carried Forward
03/08/2022
south elevation & 1st fl with soffit on north elevation - ok

Wallboard / Drywall Inspection Partial Pass 03/08/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
03/08/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
03/08/2022

Ceiling Grid/T-Bar Inspection Partial Pass 03/08/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
03/08/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Carried Forward
03/08/2022
5 rooms on 2nd fl - ok

Other/Miscellaneous
Carried Forward
03/08/2022
1 ; complete all ceiling grid requirements as per city approved plans. - not ready

Other/Miscellaneous
Outstanding
03/08/2022

Comment Building Div Inspection Partial Pass 3/10/2022 3/10/2022 03/10/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/10/2022
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Frame Inspection Passed w/ Conditions 3/15/2022 3/15/2022 03/15/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
01/27/2022
1 ; talked with Dennis about pre-rock at top 4' of interior walls on 1side only.

Shear Wall Inspection Partial Pass 3/24/2022 3/24/2022 03/24/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
03/24/2022
south elevation & 1st fl with soffit on north elevation - ok

Other/Miscellaneous
Carried Forward
03/24/2022
exterior sheathing of parapet @ 13 line - ok

Wallboard / Drywall Inspection Partial Pass 3/30/2022 3/30/2022 03/30/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
03/30/2022
coreboard & beams wraps under stairs - ok

Combination Frame And Rough In Inspection Failed 3/31/2022 3/31/2022 03/31/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
03/31/2022
1 ; inspection of slip connection at exterior walls of commons additions only.

Other/Miscellaneous
Carried Forward
03/31/2022
inspection of exterior & stair walls 1 provide test on hose bib supply 2 provide accessible clean out at vert dryer duct 3 complete weather in

Comment Building Div Inspection Partial Pass 4/1/2022 4/1/2022 04/01/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
04/01/2022
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Plumbing Rough In Inspection Partial Pass 4/1/2022 4/1/2022 04/01/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
04/01/2022
complete vent through roof

Mechanical Rough In Inspection Partial Pass 4/1/2022 4/1/2022 04/01/2022
Gary Webster ((253) 841-5590)
Wallboard / Drywall Inspection Not Ready 4/6/2022 4/6/2022 04/06/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
04/06/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
04/06/2022

Comment Building Div Inspection Not Ready 4/6/2022 4/6/2022 04/06/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
04/06/2022
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Comment Building Div Inspection Partial Pass 4/8/2022 4/8/2022 04/08/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
04/08/2022
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Other/Miscellaneous
Carried Forward
04/08/2022
1 ; inspection of energy at south and east walls of commons addition only.

Wallboard / Drywall Inspection Partial Pass 4/15/2022 4/15/2022 04/15/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
04/15/2022
1: mech/common room sheetrock ok minus touch up area on beam at south wall 2:ductwork at stage area ok to insulate

Mechanical Rough In Inspection Partial Pass 4/15/2022 4/15/2022 04/15/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
04/15/2022
1:ductwork at stage area ok to insulate

Energy (Insulation) Inspection Failed 4/15/2022 4/15/2022 04/15/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
04/15/2022
insp for new classroom addition. 1:perimeter walls to have windows insulated and poly cut and sealed at boxes and penetrations.

Mechanical Rough In Inspection Partial Pass 4/18/2022 4/18/2022 04/18/2022
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Not Ready 4/18/2022 4/18/2022 04/18/2022
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 4/20/2022 4/20/2022 04/20/2022
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 4/22/2022 4/22/2022 04/22/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
04/22/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
04/22/2022
INSP FOR ENERGY FIRST FLOOR CLASSROOM ADDITION OK.

Frame Inspection Partial Pass 4/22/2022 4/22/2022 04/22/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
04/22/2022
1:OBSERVED SPECIAL INSP REPORT FOR H01 SOFFIT. FIRESTOPPING PROGRESSING WITH SPECIAL.

Mechanical Rough In Inspection Partial Pass 4/28/2022 4/28/2022 04/28/2022
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 4/28/2022 4/28/2022 04/28/2022
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 5/2/2022 5/2/2022 05/02/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
05/02/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
05/02/2022
INSP FOR ENERGY FIRST FLOOR CLASSROOM ADDITION OK.

Energy (Insulation) Inspection Partial Pass 5/2/2022 5/2/2022 05/02/2022
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 5/6/2022 5/6/2022 05/06/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/06/2022
1:shaft wall frame at top of stairs at at commons ok 2:ext walls at top of stairs s01b ok to insulate

Wallboard / Drywall Inspection Partial Pass 5/6/2022 5/6/2022 05/06/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/06/2022
1:north wall upper floor corridor 120 ok 2:second floor rock minus rm 135 ok

Mechanical Rough In Inspection Partial Pass 5/6/2022 5/6/2022 05/06/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/06/2022
1:main duct commons ceiling insulated and ok.

Combination Frame And Rough In Inspection Not Ready 5/12/2022 5/12/2022 05/12/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
05/12/2022
1 ; inspection of slip connection at exterior walls of commons additions only.

Wallboard / Drywall Inspection Partial Pass 5/12/2022 5/12/2022 05/12/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
05/12/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
05/12/2022
INSP FOR ENERGY FIRST FLOOR CLASSROOM ADDITION OK.

Energy (Insulation) Inspection Partial Pass 5/12/2022 5/12/2022 05/12/2022
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Passed 5/17/2022 5/17/2022 05/17/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
05/17/2022
1:DWV SW CORNER 3RD FLOOR TO GROUND AT HALLWAY 19, HALLWAY 12 AND FOYER OK.

Combination Frame And Rough In Inspection Not Ready 5/17/2022 5/17/2022 05/17/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/17/2022
1 ; inspection of slip connection at exterior walls of commons additions only.

Energy (Insulation) Inspection Partial Pass 5/17/2022 5/17/2022 05/17/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/17/2022
1:3RD FLOOR INSULATION TOP OF STAIRS EXT WALLS HALLWAY 19 OK.

Wallboard / Drywall Inspection Not Ready 5/17/2022 5/17/2022 05/17/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/17/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
05/17/2022
INSP FOR ENERGY FIRST FLOOR CLASSROOM ADDITION OK.

Frame Inspection Partial Pass 5/18/2022 5/18/2022 05/18/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/18/2022
bathroom frame at hallway 12 and 9 ok with firestop verified with 3rd party

Wallboard / Drywall Inspection Partial Pass 5/20/2022 5/20/2022 05/20/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/20/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
05/20/2022
INSP FOR ENERGY FIRST FLOOR CLASSROOM ADDITION OK.

Other/Miscellaneous
Carried Forward
05/20/2022
1:stair-1- from top to bottom ok

Wallboard / Drywall Inspection Partial Pass 5/23/2022 5/23/2022 05/23/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
05/23/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
05/23/2022
INSP FOR ENERGY FIRST FLOOR CLASSROOM ADDITION OK.

Wallboard / Drywall Inspection Partial Pass 5/18/2022 5/18/2022 06/02/2022
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Failed 6/2/2022 6/2/2022 06/02/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
06/02/2022
1 ; inspection of ceiling cover in 2nd & 3rd floor restrooms at grid line - (11.3-13,CA-C) only 2 ; complete trap primers connection to floor drains at 2nd floor restrooms and insulate hotwater lines.

Mechanical Rough In Inspection Partial Pass 6/7/2022 6/7/2022 06/07/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
06/07/2022
1 ; inspection of ceiling cover in 2nd & 3rd floor restrooms at grid line - (11.3-13,CA-C) only 2 ; complete trap primers connection to floor drains at 2nd floor restrooms and insulate hotwater lines.

Frame Inspection Partial Pass 6/22/2022 6/22/2022 06/22/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
06/22/2022
partition walls for doors 103 and h06 frame approved, no rating found.

Frame Inspection Partial Pass 7/7/2022 7/7/2022 07/07/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
07/07/2022
1:corner frame at rm 220 and curtain wall next to 220 ok.

Ceiling Grid/T-Bar Inspection Not Ready 7/7/2022 7/7/2022 07/07/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
07/07/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Carried Forward
07/07/2022
5 rooms on 2nd fl - ok

Other/Miscellaneous
Carried Forward
07/07/2022
1 ; complete all ceiling grid requirements as per city approved plans. - not ready

Ceiling Grid/T-Bar Inspection Partial Pass 7/26/2022 7/26/2022 07/26/2022
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 7/29/2022 7/29/2022 07/29/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
07/29/2022
level 1 area -c- walls only ok.

Ceiling Grid/T-Bar Inspection Partial Pass 8/2/2022 8/2/2022 08/02/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/02/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Carried Forward
08/02/2022
5 rooms on 2nd fl - ok

Other/Miscellaneous
Carried Forward
08/02/2022
1 ; complete all ceiling grid requirements as per city approved plans. - not ready

Other/Miscellaneous
Carried Forward
08/02/2022
1. No corridor 2. Complete main bar tie wire at perimeter that exceeds 1and 6 3. Ok to complete cut tiles

Frame Inspection Failed 8/2/2022 8/2/2022 08/02/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/02/2022
1.complete ceiling framing at C-A thru C at room H-14

Ceiling Grid/T-Bar Inspection Partial Pass 8/5/2022 8/5/2022 08/05/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
08/05/2022
2ND AND 3RD FLOOR CLAAS ROOMS AND CORRIDORS MINUS DAMPERS AT WEST END OF CORRIDORS OK.

Frame Inspection Partial Pass 8/5/2022 8/5/2022 08/05/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
08/05/2022
1.complete ceiling framing at C-A thru C at room H-14

Other/Miscellaneous
Carried Forward
08/05/2022
3RD FLOOR SHAFT WALL (CORE BOARD) IN CORRIDOR OK

Ceiling Grid/T-Bar Inspection Not Ready 8/9/2022 8/9/2022 08/09/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/09/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Carried Forward
08/09/2022
5 rooms on 2nd fl - ok

Other/Miscellaneous
Carried Forward
08/09/2022
1 ; complete all ceiling grid requirements as per city approved plans. - not ready

Other/Miscellaneous
Carried Forward
08/09/2022
1. No corridor 2. Complete main bar tie wire at perimeter that exceeds 1and 6 3. Ok to complete cut tiles

Other/Miscellaneous
Carried Forward
08/09/2022
1. Not ready

Comment Building Div Inspection Not Ready 8/9/2022 8/9/2022 08/09/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/09/2022
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Other/Miscellaneous
Carried Forward
08/09/2022
1 ; inspection of energy at south and east walls of commons addition only.

Other/Miscellaneous
Carried Forward
08/09/2022
1. Provide install instructions for fire dampers at time of next inspection

Fire Sprinkler Cover Inspection Failed 8/9/2022 8/9/2022 08/10/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
08/10/2022
This is the WRONG permit; call fire Sprinkler inspections under Fire Permit 3rd Floor hallway - Not Ready for inspection; sprinklers not secured in place and Electrical approval is not confirmed.

Ceiling Grid/T-Bar Inspection Partial Pass 8/12/2022 8/12/2022 08/12/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
08/12/2022
1:area -a- commons grid ok minus sloped cieling.

Frame Inspection Partial Pass 8/12/2022 8/12/2022 08/12/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
08/12/2022
1.complete ceiling framing at C-A thru C at room H-14

Other/Miscellaneous
Carried Forward
08/12/2022
hard lid under stairs area -c- ok with backing added

Comment Building Div Inspection Failed 8/16/2022 8/16/2022 08/17/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
08/17/2022
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Other/Miscellaneous
Carried Forward
08/17/2022
1 ; inspection of energy at south and east walls of commons addition only.

Other/Miscellaneous
Carried Forward
08/17/2022
1. Provide install instructions for fire dampers at time of next inspection

Fire Inspection Required
Carried Forward
08/17/2022
i. Furniture stocking. Only stock in rooms with approved and completed ceilings. Conditional on providing access for any trade or inspection; including above ceiling fire alarm. ii. Contractor and owner shall provide and direct onsite safety. iii. Inspection walkthrough will be requested from Monday for Fire Prevention. iv. Inspection review by the building inspector and engineering inspectors is required for furniture stocking.

Mechanical Rough In Inspection Failed 8/17/2022 8/17/2022 08/17/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
08/17/2022
TALKED ABOUT FLOATING AND CLEARANCES AT ALL DAMPERS PER INSTALL INSTRUCTIONS ALSO SEALING ALL PENETRATIONS IN WALLS IN CORRIDORS THAT ARE PLENUMS.

Ceiling Grid/T-Bar Inspection Partial Pass 8/17/2022 8/17/2022 08/17/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
08/17/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Carried Forward
08/17/2022
5 rooms on 2nd fl - ok

Other/Miscellaneous
Carried Forward
08/17/2022
1 ; complete all ceiling grid requirements as per city approved plans. - not ready

Other/Miscellaneous
Carried Forward
08/17/2022
1. No corridor 2. Complete main bar tie wire at perimeter that exceeds 1and 6 3. Ok to complete cut tiles

Other/Miscellaneous
Carried Forward
08/17/2022
1. Not ready

Other/Miscellaneous
Carried Forward
08/17/2022
1:HALLWAY ADJACENT TO ROOM 126 OK 2:SLOPED CIELING IN COMMONS AREA -A- OK 3:HARD LID AND FIRST LAYER ROCK AREA -C- ABOVE STAIRS OK

Mechanical Rough In Inspection Partial Pass 8/18/2022 8/18/2022 08/18/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
08/18/2022
1:dampers in corridors new class room areas ok 2:ok to close up mech shaft in new corridor 3:ducts under bleachers ok

Ceiling Grid/T-Bar Inspection Partial Pass 8/18/2022 8/18/2022 08/18/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
08/18/2022
1:new grid in kitchen ok with old ansul removed, did not look at existing grid 2: 1st floor classrooms ok with holes in rock in exterior walls sealed. 3: seal all penetrations in walls at plenum corridors prior to grid insp to include conduit.

Fire Final Inspection Failed 8/22/2022 8/22/2022 08/22/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
08/22/2022
Walk through inspection. Checking construction progress for furnaiture. Many areas need work.

Wallboard / Drywall Inspection Not Ready 8/17/2022 8/17/2022 08/22/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/22/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
08/22/2022
INSP FOR ENERGY FIRST FLOOR CLASSROOM ADDITION OK.

Other/Miscellaneous
Carried Forward
08/22/2022
1. Called in in error. 2.Remove wood debris from ceiling 3. Not ready

Foundation/Rebar Inspection Partial Pass 8/25/2022 8/25/2022 08/25/2022
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Partial Pass 8/25/2022 8/25/2022 08/25/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/25/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Carried Forward
08/25/2022
5 rooms on 2nd fl - ok

Other/Miscellaneous
Carried Forward
08/25/2022
1 ; complete all ceiling grid requirements as per city approved plans. - not ready

Other/Miscellaneous
Carried Forward
08/25/2022
1. No corridor 2. Complete main bar tie wire at perimeter that exceeds 1and 6 3. Ok to complete cut tiles

Other/Miscellaneous
Carried Forward
08/25/2022
1. Not ready

Other/Miscellaneous
Carried Forward
08/25/2022
1. ok to due perimeter only basement,1st floor, 2nd floor coridor SE addition 2. complete all sealing of all fire rated penatrations 3. seal penatrations of plenum

Wallboard / Drywall Inspection Not Ready 8/29/2022 8/29/2022 08/29/2022
Shannon King ((253) 840-6684)
Comment Building Div Inspection Not Ready 8/29/2022 8/29/2022 08/29/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/29/2022
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Other/Miscellaneous
Carried Forward
08/29/2022
1 ; inspection of energy at south and east walls of commons addition only.

Other/Miscellaneous
Carried Forward
08/29/2022
1. Provide install instructions for fire dampers at time of next inspection

Fire Inspection Required
Carried Forward
08/29/2022
i. Furniture stocking. Only stock in rooms with approved and completed ceilings. Conditional on providing access for any trade or inspection; including above ceiling fire alarm. ii. Contractor and owner shall provide and direct onsite safety. iii. Inspection walkthrough will be requested from Monday for Fire Prevention. iv. Inspection review by the building inspector and engineering inspectors is required for furniture stocking.

Fire Sprinkler Cover Inspection VOID 8/30/2022 8/30/2022 08/30/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Outstanding
08/10/2022
This is the WRONG permit; call fire Sprinkler inspections under Fire Permit

Ceiling Grid/T-Bar Inspection Not Ready 8/31/2022 8/31/2022 08/31/2022
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Not Ready 8/31/2022 8/31/2022 08/31/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/31/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
08/31/2022
INSP FOR ENERGY FIRST FLOOR CLASSROOM ADDITION OK.

Other/Miscellaneous
Carried Forward
08/31/2022
1. Called in in error. 2.Remove wood debris from ceiling 3. Not ready

Frame Inspection Partial Pass 9/1/2022 9/1/2022 09/01/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
09/01/2022
1.complete ceiling framing at C-A thru C at room H-14

Other/Miscellaneous
Carried Forward
09/01/2022
hard lid 1st floor above stairs frame ok with 5 sided light boxes

Ceiling Grid/T-Bar Inspection Partial Pass 9/1/2022 9/1/2022 09/01/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
09/01/2022
1 ; cancel per Dennis - not ready

Other/Miscellaneous
Carried Forward
09/01/2022
5 rooms on 2nd fl - ok

Other/Miscellaneous
Carried Forward
09/01/2022
1 ; complete all ceiling grid requirements as per city approved plans. - not ready

Other/Miscellaneous
Carried Forward
09/01/2022
1. No corridor 2. Complete main bar tie wire at perimeter that exceeds 1and 6 3. Ok to complete cut tiles

Other/Miscellaneous
Carried Forward
09/01/2022
1. Not ready

Other/Miscellaneous
Carried Forward
09/01/2022
1. ok to due perimeter only basement,1st floor, 2nd floor coridor SE addition 2. complete all sealing of all fire rated penatrations 3. seal penatrations of plenum

Plumbing Final Inspection Failed 9/2/2022 9/2/2022 09/02/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
09/04/2022
Plumbing General life safety inspection. Final scheduled for Tuesday.

Ceiling Grid/T-Bar Inspection Failed 9/2/2022 9/2/2022 09/02/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Outstanding
09/06/2022
TCO inspection only. All ceilings in addition will need to be opened for inspection prior to final.

Exit Lighting Test Inspection Failed 09/02/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
09/04/2022
Exit Lighting test ( functional test complete, provided witnessed test for lumen levels in high ceiling common areas) Exit Signs Exit Light - Add exit light at the new exit discharge from administration area.

Mechanical Final Inspection Failed 9/2/2022 9/2/2022 09/04/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
09/04/2022
Mechanical Mechanical room - Complete Sample tube - verify correct installation Duct detector - in mechanical room not working Lobby areas floor 1-3 reinspection required - will require removal of subsancial ceiling tile for inspection Provide sealed - revised plans from ERO for duct replacement in the lower level; reference emails Damper functional test completee 7 devices at the 2nd and 3rd floors

Wallboard / Drywall Inspection Failed 9/2/2022 9/2/2022 09/06/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Outstanding
09/06/2022
Progress inspection, above ceiling at addition area at stair case. Area will be opened for final inspection.

Plumbing Final Inspection Not Ready 9/6/2022 09/06/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
09/06/2022
Plumbing General life safety inspection. Final scheduled for Tuesday.

Mechanical Final Inspection Not Ready 9/6/2022 09/06/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
09/06/2022
Mechanical Mechanical room - Complete Sample tube - verify correct installation Duct detector - in mechanical room not working Lobby areas floor 1-3 reinspection required - will require removal of subsancial ceiling tile for inspection Provide sealed - revised plans from ERO for duct replacement in the lower level; reference emails Damper functional test completee 7 devices at the 2nd and 3rd floors

Building Final Inspection Partial Pass 9/6/2022 9/6/2022 09/06/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
09/09/2022
TCO will be prepared for issuance tomorrow, 30 days TCO The contractor shall provide continuous safety oversite for all remaining work. The inspection was for minimum life safety standards.

Fire Final Inspection Partial Pass 9/6/2022 09/07/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Resolved
08/30/2022
Walk through inspection. Checking construction progress for furniture. Many areas need work.

Frame Inspection Partial Pass 9/19/2022 9/19/2022 09/19/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
09/19/2022
1.complete ceiling framing at C-A thru C at room H-14

Ceiling Grid/T-Bar Inspection Partial Pass 9/19/2022 9/19/2022 09/19/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
09/19/2022
1. ceilings approved pending exit signage per conversation with Dennis

Building Final Inspection Not Ready 10/6/2022 10/6/2022 10/06/2022
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/06/2022
TCO will be prepared for issuance tomorrow, 30 days TCO The contractor shall provide continuous safety oversite for all remaining work. The inspection was for minimum life safety standards.

Emergency Radio Test Review Inspection Passed 9/28/2022 10/10/2022
David Drake ((253) 864-4171)
Building Final Inspection Not Ready 10/10/2022 10/10/2022 10/10/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
10/10/2022
TCO will be prepared for issuance tomorrow, 30 days TCO The contractor shall provide continuous safety oversite for all remaining work. The inspection was for minimum life safety standards.

Exit Lighting Test Inspection Failed 10/11/2022 10/12/2022
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Carried Forward
10/12/2022
Functional inspection complete. Provide light meter and inspection with limited daylight.

Other/Miscellaneous
Carried Forward
10/12/2022
No emergency lighting in kitchen.

Fire Final Inspection Failed 10/11/2022 10/12/2022
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Carried Forward
10/12/2022
Fire extinguishers to be installed every 75' of travel.

Other/Miscellaneous
Carried Forward
10/12/2022
Exit sign in existing lower SE classrooms hallway not illuminating.

Other/Miscellaneous
Carried Forward
10/12/2022
Northside Exit door no longer has a landing outside. Cover Exit sign or disconnect. Door needs to be locked with a sign stating Exit out of service. Redirect to approved Exit.

Other/Miscellaneous
Carried Forward
10/12/2022
Exit door on Westside of building has been changed by architect not to be an Exit anymore. Remove Exit sign.

Other/Miscellaneous
Carried Forward
10/12/2022
Install emergency lighting in Kitchen. Exit sign installed and tested.

Other/Miscellaneous
Carried Forward
10/12/2022
Contact permit counter to pay 390$ afterhours inspection fee prior to Final.

Building Final Inspection Partial Pass 10/13/2022 10/13/2022 10/13/2022
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
10/14/2022
30 days TCO The contractor shall provide continuous safety oversite for all remaining work. The inspection was for minimum life safety standards. Reinspection required by

Comment Building Div Inspection Not Ready 10/18/2022 10/18/2022 10/18/2022
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/18/2022
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Other/Miscellaneous
Carried Forward
10/18/2022
1 ; inspection of energy at south and east walls of commons addition only.

Other/Miscellaneous
Carried Forward
10/18/2022
1. Provide install instructions for fire dampers at time of next inspection

Fire Inspection Required
Carried Forward
10/18/2022
i. Furniture stocking. Only stock in rooms with approved and completed ceilings. Conditional on providing access for any trade or inspection; including above ceiling fire alarm. ii. Contractor and owner shall provide and direct onsite safety. iii. Inspection walkthrough will be requested from Monday for Fire Prevention. iv. Inspection review by the building inspector and engineering inspectors is required for furniture stocking.

Foundation/Rebar Inspection Partial Pass 10/26/2022 10/26/2022 10/26/2022
Kevin Spruell ((253) 841-5590)
Frame Inspection Partial Pass 11/7/2022 11/7/2022 11/07/2022
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 11/8/2022 11/8/2022 11/08/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
11/08/2022
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
11/08/2022
INSP FOR ENERGY FIRST FLOOR CLASSROOM ADDITION OK.

Other/Miscellaneous
Carried Forward
11/08/2022
1. Called in in error. 2.Remove wood debris from ceiling 3. Not ready

Foundation/Rebar Inspection Partial Pass 11/8/2022 11/8/2022 11/08/2022
Shannon King ((253) 840-6684)
Frame Inspection Not Ready 11/16/2022 11/16/2022 11/16/2022
Kevin Spruell ((253) 841-5590)
Foundation/Rebar Inspection Partial Pass 11/16/2022 11/16/2022 11/16/2022
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Not Ready 12/13/2022 12/13/2022 12/13/2022
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
12/13/2022
1. cancelled on site by contractor

Frame Inspection Not Ready 12/13/2022 12/13/2022 12/13/2022
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
12/13/2022
1. complete framing as discussed with contractor

Exit Lighting Test Inspection Passed 12/13/2022
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Outstanding
10/12/2022
Functional inspection complete. Provide light meter and inspection with limited daylight.

Other/Miscellaneous
Outstanding
10/12/2022
No emergency lighting in kitchen.

Fire Final Inspection Passed 12/13/2022
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Outstanding
10/12/2022
Fire extinguishers to be installed every 75' of travel.

Other/Miscellaneous
Outstanding
10/12/2022
Exit sign in existing lower SE classrooms hallway not illuminating.

Other/Miscellaneous
Outstanding
10/12/2022
Northside Exit door no longer has a landing outside. Cover Exit sign or disconnect. Door needs to be locked with a sign stating Exit out of service. Redirect to approved Exit.

Other/Miscellaneous
Outstanding
10/12/2022
Exit door on Westside of building has been changed by architect not to be an Exit anymore. Remove Exit sign.

Other/Miscellaneous
Outstanding
10/12/2022
Install emergency lighting in Kitchen. Exit sign installed and tested.

Other/Miscellaneous
Outstanding
10/12/2022
Contact permit counter to pay 390$ afterhours inspection fee prior to Final.

Frame Inspection Partial Pass 12/16/2022 12/16/2022 12/16/2022
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
09/19/2022
1.complete ceiling framing at C-A thru C at room H-14

Energy (Insulation) Inspection Partial Pass 12/16/2022 12/16/2022 12/16/2022
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
12/16/2022
1. cancelled on site by contractor

Energy (Insulation) Inspection Passed 12/21/2022 12/21/2022 12/21/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
12/21/2022
1. cancelled on site by contractor

Wallboard / Drywall Inspection Partial Pass 12/28/2022 12/28/2022 12/28/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
12/28/2022
dense glass at new rear entrance ok

Frame Inspection Passed 1/26/2023 1/26/2023 01/26/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
01/26/2023
1. complete framing as discussed with contractor

Comment Building Div Inspection Not Ready 1/31/2023 1/31/2023 01/31/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
01/31/2023
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Other/Miscellaneous
Carried Forward
01/31/2023
1 ; inspection of energy at south and east walls of commons addition only.

Other/Miscellaneous
Carried Forward
01/31/2023
1. Provide install instructions for fire dampers at time of next inspection

Fire Inspection Required
Carried Forward
01/31/2023
i. Furniture stocking. Only stock in rooms with approved and completed ceilings. Conditional on providing access for any trade or inspection; including above ceiling fire alarm. ii. Contractor and owner shall provide and direct onsite safety. iii. Inspection walkthrough will be requested from Monday for Fire Prevention. iv. Inspection review by the building inspector and engineering inspectors is required for furniture stocking.

Other/Miscellaneous
Carried Forward
01/31/2023
1 ; provide fire final approval prior to building final inspection for T.C.O. of entry B.

Building Final Inspection Partial Pass 2/2/2023 2/2/2023 02/02/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/02/2023
TCO will be prepared for issuance tomorrow, 30 days TCO The contractor shall provide continuous safety oversite for all remaining work. The inspection was for minimum life safety standards.

Comment Building Div Inspection Partial Pass 2/2/2023 2/2/2023 02/02/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/02/2023
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Other/Miscellaneous
Carried Forward
02/02/2023
1 ; inspection of energy at south and east walls of commons addition only.

Other/Miscellaneous
Carried Forward
02/02/2023
1. Provide install instructions for fire dampers at time of next inspection

Fire Inspection Required
Carried Forward
02/02/2023
i. Furniture stocking. Only stock in rooms with approved and completed ceilings. Conditional on providing access for any trade or inspection; including above ceiling fire alarm. ii. Contractor and owner shall provide and direct onsite safety. iii. Inspection walkthrough will be requested from Monday for Fire Prevention. iv. Inspection review by the building inspector and engineering inspectors is required for furniture stocking.

Other/Miscellaneous
Carried Forward
02/02/2023
1 ; provide fire final approval prior to building final inspection for T.C.O. of entry B.

Comment Building Div Inspection Failed 3/2/2023 3/2/2023 03/02/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/02/2023
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Other/Miscellaneous
Carried Forward
03/02/2023
1 ; inspection of energy at south and east walls of commons addition only.

Other/Miscellaneous
Carried Forward
03/02/2023
1. Provide install instructions for fire dampers at time of next inspection

Fire Inspection Required
Carried Forward
03/02/2023
i. Furniture stocking. Only stock in rooms with approved and completed ceilings. Conditional on providing access for any trade or inspection; including above ceiling fire alarm. ii. Contractor and owner shall provide and direct onsite safety. iii. Inspection walkthrough will be requested from Monday for Fire Prevention. iv. Inspection review by the building inspector and engineering inspectors is required for furniture stocking.

Other/Miscellaneous
Carried Forward
03/02/2023
1 ; provide fire final approval prior to building final inspection for T.C.O. of entry B.

Other/Miscellaneous
Carried Forward
03/02/2023
1 ; at time of comment inspection with contractor to discuss handrail extensions at stairs, witnessed fire rated won-door at east exit closed, fire rated doors at gym room 001 wedged open and gate installed around 2nd exits at exterior doors at rooms 117 &117b at time of inspection. talked to principal, vice principal,& security guard about won-door would need remain open at east exit, fire rated doors not to be wedged open at gym, and fence wound need to be relocated not to block exit path, or provide accessible gate with panic hardware. ( gate will need to remain open while school is occupied as discussed with security guard until correction is completed)

Comment Engineering Div Inspection Stop Work 03/08/2023
Jeff Hill ((253) 204-5633)
Building Final Inspection Failed 4/17/2023 4/17/2023 04/18/2023
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Carried Forward
04/18/2023
TCO will be prepared for issuance tomorrow, 30 days TCO The contractor shall provide continuous safety oversite for all remaining work. The inspection was for minimum life safety standards.

Other/Miscellaneous
Carried Forward
04/18/2023
1) Won Door is not functioning to code standards; please provide report from qualified technician of the programing and testing per code. The report must include under FIRE ALARM conditions. 2) Roof - Seal conduit and doghouses at electrical. 3) Roof - Anchor Roof Access stairs per manufacture requirements at the pads. 4) Roof - drainage at exterior vestibule 5) Rm 131B Fire Rated (FR) penetrations and door 6) Fire door sweep. - provide cut sheet and installation (typical) Address large gap sweeps. 7) RM 134 Mirrors Max 40 inches 8) Rm 013 FR penetrations 9) Mechanical room - under seating, complete FR penetrations 10) Mechanical - final letter 11) Air Barrier test - noted as required on plans 12) Storage Shed - separate permit - Subject to Feild inspection - Submittal must include site plans, plans and engineering. 13) Address Flooring - @ atrium stop of stairs. 14) Exterior exit light at office exit; please review and address per IEBC as applicable. 15) RM 208 sink boots Note: interior inspection only.

Mechanical Final Inspection Failed 4/17/2023 04/18/2023
Ray Cockerham ((253) 841-5585)
Corrections:


Other/Miscellaneous
Resolved
04/17/2023
Mechanical Mechanical room - Complete Sample tube - verify correct installation Duct detector - in mechanical room not working Lobby areas floor 1-3 reinspection required - will require removal of subsancial ceiling tile for inspection Provide sealed - revised plans from ERO for duct replacement in the lower level; reference emails Damper functional test completee 7 devices at the 2nd and 3rd floors

Other/Miscellaneous
Outstanding
04/17/2023
See Building Final Same DATE

Frame Inspection Passed 8/17/2023 8/17/2023 08/17/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 8/17/2023 8/17/2023 08/17/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/17/2023
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Resolved
08/17/2023
INSP FOR ENERGY FIRST FLOOR CLASSROOM ADDITION OK.

Other/Miscellaneous
Resolved
08/17/2023
1. Called in in error. 2.Remove wood debris from ceiling 3. Not ready

Shear Wall Inspection Partial Pass 8/21/2023 8/21/2023 08/21/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
08/21/2023
south elevation & 1st fl with soffit on north elevation - ok

Wallboard / Drywall Inspection Not Ready 8/22/2023 8/22/2023 08/22/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
08/22/2023
pre rock areas for mech rough in at top of wall - 3rd fl - ok 2nd & 1st progressing - calling in another inspection as discussed

Other/Miscellaneous
Carried Forward
08/22/2023
1 ; cancel per Dennis

Comment Building Div Inspection Partial Pass 8/23/2023 8/23/2023 08/23/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/23/2023
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Other/Miscellaneous
Carried Forward
08/23/2023
1 ; inspection of energy at south and east walls of commons addition only.

Other/Miscellaneous
Carried Forward
08/23/2023
1. Provide install instructions for fire dampers at time of next inspection

Fire Inspection Required
Carried Forward
08/23/2023
i. Furniture stocking. Only stock in rooms with approved and completed ceilings. Conditional on providing access for any trade or inspection; including above ceiling fire alarm. ii. Contractor and owner shall provide and direct onsite safety. iii. Inspection walkthrough will be requested from Monday for Fire Prevention. iv. Inspection review by the building inspector and engineering inspectors is required for furniture stocking.

Other/Miscellaneous
Carried Forward
08/23/2023
1 ; provide fire final approval prior to building final inspection for T.C.O. of entry B.

Other/Miscellaneous
Carried Forward
08/23/2023
1 ; at time of comment inspection with contractor to discuss handrail extensions at stairs, witnessed fire rated won-door at east exit closed, fire rated doors at gym room 001 wedged open and gate installed around 2nd exits at exterior doors at rooms 117 &117b at time of inspection. talked to principal, vice principal,& security guard about won-door would need remain open at east exit, fire rated doors not to be wedged open at gym, and fence wound need to be relocated not to block exit path, or provide accessible gate with panic hardware. ( gate will need to remain open while school is occupied as discussed with security guard until correction is completed)

Building Final Inspection Not Ready 10/3/2023 10/3/2023 10/04/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/04/2023
TCO will be prepared for issuance tomorrow, 30 days TCO The contractor shall provide continuous safety oversite for all remaining work. The inspection was for minimum life safety standards.

Other/Miscellaneous
Carried Forward
10/04/2023
1) Won Door is not functioning to code standards; please provide report from qualified technician of the programing and testing per code. The report must include under FIRE ALARM conditions. 2) Roof - Seal conduit and doghouses at electrical. 3) Roof - Anchor Roof Access stairs per manufacture requirements at the pads. 4) Roof - drainage at exterior vestibule 5) Rm 131B Fire Rated (FR) penetrations and door 6) Fire door sweep. - provide cut sheet and installation (typical) Address large gap sweeps. 7) RM 134 Mirrors Max 40 inches 8) Rm 013 FR penetrations 9) Mechanical room - under seating, complete FR penetrations 10) Mechanical - final letter 11) Air Barrier test - noted as required on plans 12) Storage Shed - separate permit - Subject to Feild inspection - Submittal must include site plans, plans and engineering. 13) Address Flooring - @ atrium stop of stairs. 14) Exterior exit light at office exit; please review and address per IEBC as applicable. 15) RM 208 sink boots Note: interior inspection only.

Building Final Inspection Failed 11/27/2023 11/27/2023 11/27/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
11/27/2023
TCO will be prepared for issuance tomorrow, 30 days TCO The contractor shall provide continuous safety oversite for all remaining work. The inspection was for minimum life safety standards.

Other/Miscellaneous
Carried Forward
11/27/2023
1) Won Door is not functioning to code standards; please provide report from qualified technician of the programing and testing per code. The report must include under FIRE ALARM conditions. 2) Roof - Seal conduit and doghouses at electrical. 3) Roof - Anchor Roof Access stairs per manufacture requirements at the pads. 4) Roof - drainage at exterior vestibule 5) Rm 131B Fire Rated (FR) penetrations and door 6) Fire door sweep. - provide cut sheet and installation (typical) Address large gap sweeps. 7) RM 134 Mirrors Max 40 inches 8) Rm 013 FR penetrations 9) Mechanical room - under seating, complete FR penetrations 10) Mechanical - final letter 11) Air Barrier test - noted as required on plans 12) Storage Shed - separate permit - Subject to Feild inspection - Submittal must include site plans, plans and engineering. 13) Address Flooring - @ atrium stop of stairs. 14) Exterior exit light at office exit; please review and address per IEBC as applicable. 15) RM 208 sink boots Note: interior inspection only.

Other/Miscellaneous
Carried Forward
11/27/2023
1 ; complete accessible route at west side of Building as discussed with contractor. 2 ; complete exterior light at landing at west exit door. 3 ; provide 2% max slope at the top 3 landings of south accessible ramp.with handrail 34''-38'' above walking surface of ramp by final. 4 ; complete fire caulk at d.a.s. room 013 5 ; complete install of mirror 40'' a.f.f. to reflective bottom edge of mirror as discussed with contractor. 6 ; provide hammer arrestor at dishwasher water supply line .( room 208) 7 ; provide air barrier approval test report prior to final 8 ; provide engineering final prior to building final .

Building Final Inspection Failed 10/8/2024 (11:00 to 12:00) 11/8/2024 11/08/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
11/08/2024
1) Won Door is not functioning to code standards; please provide report from qualified technician of the programing and testing per code. The report must include under FIRE ALARM conditions. 2) Roof - Seal conduit and doghouses at electrical. 3) Roof - Anchor Roof Access stairs per manufacture requirements at the pads. 4) Roof - drainage at exterior vestibule 5) Rm 131B Fire Rated (FR) penetrations and door 6) Fire door sweep. - provide cut sheet and installation (typical) Address large gap sweeps. 7) RM 134 Mirrors Max 40 inches 8) Rm 013 FR penetrations 9) Mechanical room - under seating, complete FR penetrations 10) Mechanical - final letter 11) Air Barrier test - noted as required on plans 12) Storage Shed - separate permit - Subject to Feild inspection - Submittal must include site plans, plans and engineering. 13) Address Flooring - @ atrium stop of stairs. 14) Exterior exit light at office exit; please review and address per IEBC as applicable. 15) RM 208 sink boots Note: interior inspection only.

Other/Miscellaneous
Resolved
11/08/2024
1 ; complete accessible route at west side of Building as discussed with contractor. 2 ; complete exterior light at landing at west exit door. 3 ; provide 2% max slope at the top 3 landings of south accessible ramp.with handrail 34''-38'' above walking surface of ramp by final. 4 ; complete fire caulk at d.a.s. room 013 5 ; complete install of mirror 40'' a.f.f.to reflective bottom edge of mirror as discussed with contractor. 6 ; provide hammer arrestor at dishwasher water supply line .( room 208) 7 ; provide air barrier approval test report prior to final 8 ; provide engineering final prior to building final .

Other/Miscellaneous
Carried Forward
11/08/2024
1 ; provide engineering final prior to building final .

Shear Wall Inspection VOID 11/12/2024
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection VOID 11/12/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
08/22/2023
1 ; cancel per Dennis

Comment Building Div Inspection VOID 11/12/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
08/23/2023
1 ; approved as t.c.o. in rooms- 207 except sink and doors,208 except sink, range exhaust, and hammer arrestor for refrigerator,101k,101j complete office door with door hardware,101i complete office door with door hardware,101h complete office door with door hardware,101g complete office door with door hardware, 101g complete office door with door hardware, 101b ,complete office door with door hardware, 101a,105d complete office door with door hardware, 105a complete install of sink, approved for 30 days from 3/10/2022

Other/Miscellaneous
Outstanding
08/23/2023
1 ; inspection of energy at south and east walls of commons addition only.

Other/Miscellaneous
Outstanding
08/23/2023
1. Provide install instructions for fire dampers at time of next inspection

Fire Inspection Required
Outstanding
08/23/2023
i. Furniture stocking. Only stock in rooms with approved and completed ceilings. Conditional on providing access for any trade or inspection; including above ceiling fire alarm. ii. Contractor and owner shall provide and direct onsite safety. iii. Inspection walkthrough will be requested from Monday for Fire Prevention. iv. Inspection review by the building inspector and engineering inspectors is required for furniture stocking.

Other/Miscellaneous
Outstanding
08/23/2023
1 ; provide fire final approval prior to building final inspection for T.C.O. of entry B.

Other/Miscellaneous
Outstanding
08/23/2023
1 ; at time of comment inspection with contractor to discuss handrail extensions at stairs, witnessed fire rated won-door at east exit closed, fire rated doors at gym room 001 wedged open and gate installed around 2nd exits at exterior doors at rooms 117 &117b at time of inspection. talked to principal, vice principal,& security guard about won-door would need remain open at east exit, fire rated doors not to be wedged open at gym, and fence wound need to be relocated not to block exit path, or provide accessible gate with panic hardware. ( gate will need to remain open while school is occupied as discussed with security guard until correction is completed)

Conditions

Condition Status Category
General Permit Conditions Resolved Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
* Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456 ** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-20-0612 IS COMPLETED AND APPROVAL HAS BEEN PROVIDED ** * THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. PLEASE FOLLOW THE APPROVED STORMWATER SITE PLAN ASSOCIATED WITH CIVIL PERMIT E-20-0612 ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. PLEASE FOLLOW THE APPROVED STORMWATER SITE PLAN ASSOCIATED WITH CIVIL PERMIT E-20-0612 * Curb, gutter, sidewalk and approach must be poured per City Standards. * Driveway approach must be a minimum of 30' wide. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03.
Building Permit Standard Conditions Resolved Standard Conditions
Building Division
PERMIT CONDITIONS: 1- COMPLY WITH 2015 IFC AND 2015 IBC 2- TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP 3- EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 4- EMERGENCY RADIO TEST REQUIRED COMPLY WITH IFC SECTION 510. FIRE FINAL APPROVAL APON COMPLETED TEST RESULTS 5- SEPERATE PERMITS REQUIRED FOR FIRE ALARM AND FIRE SPRINKLER 6- RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN. 7- FIRE EXTINGUISHERS REQUIRED PER CODE 8- A KNOX BOX IS REQUIRED AT THE FRONT ENTRY ON THE EXTERIOR OF THE BUILDING 9- PIV MUST HAVE A KNOX LOCK OR APPROVED LOCK WITH AN EXTRA KEY PROVIDED IN KNOX BOX 10- EXISTING BUILDINGS WILL NEED TO CONTACT CENTRAL PIERCE FIRE & RESCUE AND UPDATE THE KEY IN THE KNOX BOX 11- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL NOTES THAT WERE ADDRESSED BY EMAILS FOR FIRE ALARM AND VOICE: A- New system must be capable of voice control. Based on code and the representation of fire area percentage in your, letter the City concurs that the installation would not be required at this time. Voice/Alarm system will be required for the whole school in accordance with current or future fire code provisions. Please provide the narrative, floor areas, and fire area percentage calculations referenced in 907 within the building and fire alarm permits. B- Any remodel in the existing portion will be required to meet total coverage along with voice control, we will not consider the 35% for a future fire alarm update. INSPECTION REQUEST CODES: 2252 EXIT LIGHT TEST 5610 EMERGENCY RADIO TEST 9200 FIRE BUILDING FINAL SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8AM TO SET UP A TIME. INSPECTIONS ARE MONDAY - THURSDAY THERE WILL BE NO INSPECTIONS ON FRIDAYS. HTTPS://SECURE.CITYOFPUYALLUP.ORG/ INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE) DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585
Pipeline Notfication Rcw 19.122.033 Resolved Standard Conditions
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

Reference Number Status Type
E-20-0612 Permit(s) Issued Civil Construction Permit
F-21-0083 Closed Fire Alarms
PRFS20221060 Closed Fire Sprinklers
PRSG20230064 Closed Sign/Awning
PRPF20230822 Expired Pre-Fabricated Building

Documents & Images

Date Uploaded File Type Name
01/14/2022 Report Inspection Report (Comment Building Div Inspection)
01/24/2022 Report Inspection Report (Combination Frame And Rough In Inspection)
01/27/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
01/27/2022 Report Inspection Report (Frame Inspection)
01/27/2022 Report Inspection Report (Comment Building Div Inspection)
01/28/2022 Report Inspection Report (Frame Inspection)
01/28/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
01/28/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
01/28/2022 Report Inspection Report (Comment Building Div Inspection)
02/04/2022 Report Inspection Report (Shear Wall Inspection)
02/10/2022 Report Inspection Report (Wallboard / Drywall Inspection)
02/10/2022 Report Inspection Report (Mechanical Rough In Inspection)
02/16/2022 Report Inspection Report (Wallboard / Drywall Inspection)
02/16/2022 Report Inspection Report (Foundation/Rebar Inspection)
02/25/2022 Report Inspection Report (Shear Wall Inspection)
02/28/2022 Report Inspection Report (Wallboard / Drywall Inspection)
03/01/2022 Report Inspection Report (Shear Wall Inspection)
03/01/2022 Report Inspection Report (Comment Building Div Inspection)
03/02/2022 Report Inspection Report (Wallboard / Drywall Inspection)
03/07/2022 Report Inspection Report (Wallboard / Drywall Inspection)
03/07/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
03/07/2022 Report Inspection Report (Comment Building Div Inspection)
03/08/2022 Report Inspection Report (Shear Wall Inspection)
03/10/2022 Report Inspection Report (Comment Building Div Inspection)
03/15/2022 Report Inspection Report (Frame Inspection)
03/15/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
03/15/2022 Report Inspection Report (Wallboard / Drywall Inspection)
03/24/2022 Report Inspection Report (Shear Wall Inspection)
03/30/2022 Report Inspection Report (Wallboard / Drywall Inspection)
03/31/2022 Report Inspection Report (Combination Frame And Rough In Inspection)
04/01/2022 Report Inspection Report (Comment Building Div Inspection)
04/01/2022 Report Inspection Report (Plumbing Rough In Inspection)
04/01/2022 Report Inspection Report (Mechanical Rough In Inspection)
04/06/2022 Report Inspection Report (Comment Building Div Inspection)
04/18/2022 Report Inspection Report (Mechanical Rough In Inspection)
04/18/2022 Report Inspection Report (Energy (Insulation) Inspection)
04/20/2022 Report Inspection Report (Energy (Insulation) Inspection)
04/28/2022 Report Inspection Report (Mechanical Rough In Inspection)
04/28/2022 Report Inspection Report (Wallboard / Drywall Inspection)
05/02/2022 Report Inspection Report (Energy (Insulation) Inspection)
05/02/2022 Report Inspection Report (Wallboard / Drywall Inspection)
05/12/2022 Report Inspection Report (Wallboard / Drywall Inspection)
05/12/2022 Report Inspection Report (Combination Frame And Rough In Inspection)
05/12/2022 Report Inspection Report (Energy (Insulation) Inspection)
05/19/2022 B-20-0993 StageLift Ferrucci Jr High2 (2)-
05/19/2022 B-20-0993 StageLift Ferrucci Jr High2 (1)
06/02/2022 Report Inspection Report (Wallboard / Drywall Inspection)
06/02/2022 Report Inspection Report (Wallboard / Drywall Inspection)
06/07/2022 Report Inspection Report (Mechanical Rough In Inspection)
06/07/2022 Report Inspection Report (Mechanical Rough In Inspection)
07/26/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/02/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/02/2022 Report Inspection Report (Frame Inspection)
08/09/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/09/2022 Report Inspection Report (Comment Building Div Inspection)
08/22/2022 Report Inspection Report (Wallboard / Drywall Inspection)
08/25/2022 Report Inspection Report (Foundation/Rebar Inspection)
08/25/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/29/2022 Report Inspection Report (Wallboard / Drywall Inspection)
08/29/2022 Report Inspection Report (Comment Building Div Inspection)
08/31/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
08/31/2022 Report Inspection Report (Wallboard / Drywall Inspection)
09/06/2022 Report Inspection Report (Plumbing Final Inspection)
09/06/2022 Report Inspection Report (Mechanical Final Inspection)
09/16/2022 Receipt Receipt for transaction:2022-001820
09/19/2022 Report Inspection Report (Frame Inspection)
09/19/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
10/06/2022 Report Inspection Report (Building Final Inspection)
10/12/2022 Receipt Receipt for transaction:2022-002029
10/18/2022 Report Inspection Report (Comment Building Div Inspection)
10/26/2022 Report Inspection Report (Foundation/Rebar Inspection)
11/07/2022 Report Inspection Report (Frame Inspection)
11/07/2022 Report Inspection Report (Building Final Inspection)
11/08/2022 Report Inspection Report (Wallboard / Drywall Inspection)
11/08/2022 Report Inspection Report (Foundation/Rebar Inspection)
11/16/2022 Report Inspection Report (Frame Inspection)
11/16/2022 Report Inspection Report (Foundation/Rebar Inspection)
12/13/2022 Report Inspection Report (Energy (Insulation) Inspection)
12/13/2022 Report Inspection Report (Frame Inspection)
12/16/2022 Report Inspection Report (Frame Inspection)
12/16/2022 Report Inspection Report (Energy (Insulation) Inspection)
12/21/2022 Report Inspection Report (Energy (Insulation) Inspection)
01/26/2023 Report Inspection Report (Frame Inspection)
01/31/2023 Report Inspection Report (Comment Building Div Inspection)
02/02/2023 Report Inspection Report (Building Final Inspection)
02/02/2023 Report Inspection Report (Comment Building Div Inspection)
03/02/2023 Report Inspection Report (Comment Building Div Inspection)
03/08/2023 Report Inspection Report (Comment Engineering Div Inspection)
08/17/2023 Report Inspection Report (Frame Inspection)
08/21/2023 Report Inspection Report (Wallboard / Drywall Inspection)
08/22/2023 Report Inspection Report (Wallboard / Drywall Inspection)
08/23/2023 Report Inspection Report (Comment Building Div Inspection)
10/04/2023 Report Inspection Report (Building Final Inspection)
11/27/2023 Report Inspection Report (Building Final Inspection)
11/08/2024 Report Inspection Report (Building Final Inspection)