CITY OF PUYALLUP PERMITTING PORTAL
Engineering Permit Application Status
E-20-0612
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Traffic Control Plan Review Fee | $40.00 | $40.00 | Paid | 05/25/2021 |
No
|
||||
Traffic Control Permit Fee | $50.00 | $50.00 | Paid | 05/25/2021 |
No
|
||||
Planning Landscape Review Fee | $300.00 | $300.00 | Paid | 05/25/2021 |
No
|
||||
Engineering Permit Fee | $300.00 | $300.00 | Paid | 05/25/2021 |
No
|
||||
Engineering Inspection Fee (3%) | $68,789.16 | $68,789.16 | Paid | 05/25/2021 |
No
|
||||
Civil Review Additional Fee | $5,850.00 | $5,850.00 | Paid | 05/25/2021 |
No
|
||||
Storm System Development Charge | $127,680.00 | $127,680.00 | Paid | 05/25/2021 |
No
|
||||
Civil Review Fee | $470.00 | $470.00 | Paid | 05/18/2021 |
No
|
||||
Record Drawing Review Fee | $200.00 | $200.00 | Paid | 05/18/2021 |
No
|
||||
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $203,679.16 | $203,679.16 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Engineering Final Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Erosion And Sediment Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/21/2023
install erosion control measures around the exposed soils in the ball field.
|
||||
Other/Miscellaneous
Outstanding
03/21/2023
Fix all erosion control issue throughout site.
|
||||
Other/Miscellaneous
Outstanding
03/21/2023
Provide the CESCL reports from the DOE NPDES permit
|
||||
Engineering Punchlist Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Planning Final Inspection | Pending | |||
Engineering Daily Inspection | Partial Pass | 12/13/2021 | 12/13/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/15/2021 | 12/15/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/16/2021 | 12/16/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/17/2021 | 12/17/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/20/2021 | 12/21/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/21/2021 | 12/21/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/22/2021 | 12/22/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/23/2021 | 12/23/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/29/2021 | 12/29/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/3/2022 | 01/04/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/4/2022 | 01/05/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/7/2022 | 01/07/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Passed | 1/10/2022 | 01/12/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/11/2022 | 01/12/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/12/2022 | 01/13/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/13/2022 | 01/14/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/14/2022 | 01/17/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Passed | 1/17/2022 | 01/17/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/18/2022 | 01/19/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/19/2022 | 01/19/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/21/2022 | 01/21/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/24/2022 | 01/25/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/25/2022 | 01/25/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/25/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 1/26/2022 | 01/26/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/26/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Passed | 1/27/2022 | 01/28/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/28/2022 | 01/31/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/31/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 1/31/2022 | 02/01/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/01/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 2/2/2022 | 02/03/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/03/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 2/3/2022 | 02/04/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/04/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 2/4/2022 | 02/04/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/04/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 2/7/2022 | 02/10/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/10/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 2/9/2022 | 02/10/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/10/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 2/11/2022 | 02/14/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/14/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 2/14/2022 | 02/16/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/16/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 2/23/2022 | 02/24/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/24/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 3/2/2022 | 03/03/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/03/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 3/11/2022 | 03/14/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/14/2022
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Failed | 3/14/2022 | 03/14/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/14/2022
1. Temporarily raise the CB in the existing south pond to gain proper free bored and add silt fence and rock around the CB.
2. Install check damns for silt runoff to the existing south pond.
3. Locate the existing flow control structure to insure proper functioning and maintenance.
4. Divert the silty run off from going to the ROW CB and clean the CB sock.
5. ALL pipes leading to both off site systems will need to be jetted and TV'ed for cleanliness.
6. The city needs this done ASAP.
If this is not completed in a timely manner, the city will be forced to post a stop work order on all site permits and inspections.
The site's CESCL needs to monitor discharge and report NTU's above 25.
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 3/15/2022 | 03/16/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/16/2022
1. Temporarily raise the CB in the existing south pond to gain proper free bored and add silt fence and rock around the CB.
2. Install check damns for silt runoff to the existing south pond.
3. Locate the existing flow control structure to insure proper functioning and maintenance.
4. Divert the silty run off from going to the ROW CB and clean the CB sock.
5. ALL pipes leading to both off site systems will need to be jetted and TV'ed for cleanliness.
6. The city needs this done ASAP.
If this is not completed in a timely manner, the city will be forced to post a stop work order on all site permits and inspections.
The site's CESCL needs to monitor discharge and report NTU's above 25.
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Failed | 4/5/2022 | 04/05/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Resolved
04/05/2022
1. Temporarily raise the CB in the existing south pond to gain proper free bored and add silt fence and rock around the CB.
2. Install check damns for silt runoff to the existing south pond.
3. Locate the existing flow control structure to insure proper functioning and maintenance.
4. Divert the silty run off from going to the ROW CB and clean the CB sock.
5. ALL pipes leading to both off site systems will need to be jetted and TV'ed for cleanliness.
6. The city needs this done ASAP.
If this is not completed in a timely manner, the city will be forced to post a stop work order on all site permits and inspections.
The site's CESCL needs to monitor discharge and report NTU's above 25.
NO track out, keep the on site and off site pavements cleaned.
|
||||
Other/Miscellaneous
Carried Forward
04/05/2022
clean 3" water line and camera
|
||||
Engineering Daily Inspection | Passed | 04/12/2022 | ||
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Outstanding
04/05/2022
1. Temporarily raise the CB in the existing south pond to gain proper free bored and add silt fence and rock around the CB.
2. Install check damns for silt runoff to the existing south pond.
3. Locate the existing flow control structure to insure proper functioning and maintenance.
4. Divert the silty run off from going to the ROW CB and clean the CB sock.
5. ALL pipes leading to both off site systems will need to be jetted and TV'ed for cleanliness.
6. The city needs this done ASAP.
If this is not completed in a timely manner, the city will be forced to post a stop work order on all site permits and inspections.
The site's CESCL needs to monitor discharge and report NTU's above 25.
NO track out, keep the on site and off site pavements cleaned.
|
||||
Engineering Daily Inspection | Partial Pass | 4/13/2022 | 04/13/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | VOID | 04/13/2022 | ||
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Outstanding
04/05/2022
clean 3" water line and camera
|
||||
Engineering Daily Inspection | Partial Pass | 4/14/2022 | 04/14/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/21/2022 | 04/22/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 4/22/2022 | 04/25/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Failed | 4/28/2022 | 04/28/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/6/2022 | 05/09/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 05/13/2022 | ||
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/19/2022 | 05/19/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/20/2022 | 05/20/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Failed | 5/31/2022 | 05/31/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/31/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
05/31/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
05/31/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/7/2022 | 06/07/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/07/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
06/07/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
06/07/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/13/2022 | 06/14/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/14/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
06/14/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
06/14/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/14/2022 | 06/14/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/14/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
06/14/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
06/14/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/15/2022 | 06/15/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/15/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
06/15/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
06/15/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/16/2022 | 06/16/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/16/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
06/16/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
06/16/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/17/2022 | 06/17/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/17/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
06/17/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
06/17/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/23/2022 | 06/24/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/24/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
06/24/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
06/24/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/24/2022 | 06/27/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/27/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
06/27/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
06/27/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/27/2022 | 06/28/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/28/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
06/28/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
06/28/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/28/2022 | 06/29/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/29/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
06/29/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
06/29/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/29/2022 | 07/01/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/01/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
07/01/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/01/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 6/30/2022 | 07/01/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/01/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
07/01/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/01/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 7/1/2022 | 07/05/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/05/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
07/05/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/05/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 7/5/2022 | 07/06/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/06/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
07/06/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/06/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 7/6/2022 | 07/07/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/07/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
07/07/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/07/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 7/7/2022 | 07/07/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/07/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
07/07/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/07/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Partial Pass | 7/8/2022 | 07/11/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Resolved
07/11/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
07/11/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/11/2022
replace straw waddles along the bus loop
|
||||
Engineering Daily Inspection | Failed | 7/11/2022 | 07/11/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Resolved
07/11/2022
rebuild construction entrance per city standard
|
||||
Other/Miscellaneous
Carried Forward
07/11/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/11/2022
replace straw waddles along the bus loop
|
||||
Other/Miscellaneous
Carried Forward
07/11/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Failed | 07/15/2022 | ||
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/15/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Resolved
07/15/2022
replace straw waddles along the bus loop
|
||||
Other/Miscellaneous
Carried Forward
07/15/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 07/19/2022 | ||
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/19/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/19/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 7/19/2022 | 07/20/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/20/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/20/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 7/20/2022 | 07/21/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/21/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/21/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 7/21/2022 | 07/22/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/22/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/22/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 7/22/2022 | 07/25/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/25/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/25/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 7/25/2022 | 07/26/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/26/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/26/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 7/26/2022 | 07/29/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/29/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/29/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 7/27/2022 | 07/29/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/29/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/29/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 7/28/2022 | 07/29/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/29/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
07/29/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 7/29/2022 | 07/29/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/04/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/04/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 7/30/2022 | 07/30/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/04/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/04/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/1/2022 | 08/01/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/04/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/04/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/2/2022 | 08/02/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/04/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/04/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/3/2022 | 08/04/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/04/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/04/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/4/2022 | 08/05/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/05/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/05/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/5/2022 | 08/05/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/08/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/08/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/8/2022 | 08/09/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/09/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/09/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/9/2022 | 08/09/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/11/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/11/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/10/2022 | 08/11/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/11/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/11/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/11/2022 | 08/11/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/11/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/11/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/12/2022 | 08/12/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/12/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/12/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/13/2022 | 08/13/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/13/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/13/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/15/2022 | 08/15/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/15/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/15/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/16/2022 | 08/16/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/16/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/16/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/17/2022 | 08/18/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/18/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/18/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/18/2022 | 08/18/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/18/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/18/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/19/2022 | 08/19/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/19/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/19/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/22/2022 | 08/23/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/23/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/23/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/23/2022 | 08/24/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/24/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/24/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/25/2022 | 08/25/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Resolved
08/29/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Resolved
08/29/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/26/2022 | 08/26/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/29/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/29/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/24/2022 | 08/29/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/29/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/29/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | VOID | 08/29/2022 | ||
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/29/2022 | 08/29/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/29/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/29/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/30/2022 | 08/30/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/30/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Carried Forward
08/30/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | VOID | 8/31/2022 | 08/30/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Outstanding
08/30/2022
encircle all catch basins with silt fence that are not in paved areas
|
||||
Other/Miscellaneous
Outstanding
08/30/2022
inject chlorine into the new water main.
resample water main.
repressure test water main.
|
||||
Engineering Daily Inspection | Partial Pass | 8/31/2022 | 09/01/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/2/2022 | 09/02/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/6/2022 | 09/06/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 09/07/2022 | ||
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/8/2022 | 09/08/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/9/2022 | 09/09/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/12/2022 | 09/12/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/13/2022 | 09/13/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/14/2022 | 09/14/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/15/2022 | 09/15/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/16/2022 | 09/16/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/19/2022 | 09/19/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/20/2022 | 09/20/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/21/2022 | 09/21/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/10/2022 | 10/10/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/11/2022 | 10/12/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/12/2022 | 10/13/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/13/2022 | 10/14/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/14/2022 | 10/14/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/15/2022 | 10/16/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 10/17/2022 | 10/18/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/21/2022 | 10/21/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/24/2022 | 10/24/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 10/25/2022 | 10/25/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 10/26/2022 | 10/27/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/27/2022 | 10/31/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/29/2022 | 10/31/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/31/2022 | 10/31/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 11/1/2022 | 11/02/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 11/10/2022 | 11/11/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Failed | 12/5/2022 | 12/05/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/05/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/05/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/05/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/05/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/05/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
12/05/2022
update TESC's ( socks in CB's and silt fence around working areas )
|
||||
Other/Miscellaneous
Carried Forward
12/05/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/05/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/05/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Partial Pass | 12/7/2022 | 12/09/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/09/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
update TESC's ( socks in CB's and silt fence around working areas )
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Partial Pass | 12/8/2022 | 12/09/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/09/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
update TESC's ( socks in CB's and silt fence around working areas )
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/09/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Partial Pass | 12/9/2022 | 12/12/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/12/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/12/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/12/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/12/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/12/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Resolved
12/12/2022
update TESC's ( socks in CB's and silt fence around working areas )
|
||||
Other/Miscellaneous
Carried Forward
12/12/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/12/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/12/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Partial Pass | 12/14/2022 | 12/15/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/15/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Partial Pass | 12/15/2022 | 12/15/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/15/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/15/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Partial Pass | 12/16/2022 | 12/19/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/19/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Partial Pass | 12/19/2022 | 12/19/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/19/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/19/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Partial Pass | 12/21/2022 | 12/21/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/21/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/21/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/21/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/21/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/21/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
12/21/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/21/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/21/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Partial Pass | 12/22/2022 | 12/22/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/22/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/22/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/22/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/22/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/22/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
12/22/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/22/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/22/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Partial Pass | 12/23/2022 | 12/23/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/23/2022
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
12/23/2022
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
12/23/2022
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
12/23/2022
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
12/23/2022
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
12/23/2022
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
12/23/2022
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
12/23/2022
replace all cracked and broken curb and sidewalk
|
||||
Engineering Daily Inspection | Failed | 1/5/2023 | 01/05/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/05/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
01/05/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
01/05/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
01/05/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
01/05/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
01/05/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
01/05/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
01/05/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
01/05/2023
delineate around work and staging areas. At all times keep a well-marked path for students and staff.
|
||||
Erosion And Sediment Inspection | Failed | 1/5/2023 | 01/05/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/05/2023
install BMP's in all catch basins.
stabilize soils or install erosion control throughout the site.
|
||||
Engineering Daily Inspection | Partial Pass | 1/11/2023 | 01/12/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/12/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
01/12/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
01/12/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
01/12/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
01/12/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
01/12/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
01/12/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
01/12/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
01/12/2023
delineate around work and staging areas. At all times keep a well-marked path for students and staff.
|
||||
Engineering Daily Inspection | Partial Pass | 1/12/2023 | 01/13/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/13/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
01/13/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
01/13/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
01/13/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
01/13/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
01/13/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
01/13/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
01/13/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
01/13/2023
delineate around work and staging areas. At all times keep a well-marked path for students and staff.
|
||||
Engineering Daily Inspection | Partial Pass | 1/16/2023 | 01/16/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/16/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
01/16/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
01/16/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
01/16/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
01/16/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
01/16/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
01/16/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
01/16/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
01/16/2023
delineate around work and staging areas. At all times keep a well-marked path for students and staff.
|
||||
Engineering Daily Inspection | Partial Pass | 1/24/2023 | 01/24/2023 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/24/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
01/24/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
01/24/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
01/24/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
01/24/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
01/24/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
01/24/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
01/24/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
01/24/2023
delineate around work and staging areas. At all times keep a well-marked path for students and staff.
|
||||
Engineering Daily Inspection | Partial Pass | 1/30/2023 | 01/31/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/31/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
01/31/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
01/31/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
01/31/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
01/31/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
01/31/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
01/31/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
01/31/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
01/31/2023
delineate around work and staging areas. At all times keep a well-marked path for students and staff.
|
||||
Engineering Daily Inspection | Partial Pass | 2/3/2023 | 02/03/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/03/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
02/03/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
02/03/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
02/03/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
02/03/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
02/03/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
02/03/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
02/03/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
02/03/2023
delineate around work and staging areas. At all times keep a well-marked path for students and staff.
|
||||
Engineering Daily Inspection | Partial Pass | 2/6/2023 | 02/06/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/06/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
delineate around work and staging areas. At all times keep a well-marked path for students and staff.
|
||||
Erosion And Sediment Inspection | Failed | 02/06/2023 | ||
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Resolved
02/06/2023
install BMP's in all catch basins.
stabilize soils or install erosion control throughout the site.
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
install erosion control measures around the exposed soils in the ball field.
|
||||
Engineering Daily Inspection | Failed | 02/06/2023 | ||
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/06/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
02/06/2023
remove contaminated rock from the French drain. From CB 111 to CB 105.
inspector must visually inspect rock and fabric before it can be backfilled
|
||||
Engineering Daily Inspection | Partial Pass | 2/7/2023 | 02/07/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/07/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
02/07/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
02/07/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
02/07/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
02/07/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
02/07/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
02/07/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
02/07/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
02/07/2023
remove contaminated rock from the French drain. From CB 111 to CB 105.
inspector must visually inspect rock and fabric before it can be backfilled
|
||||
Engineering Daily Inspection | Partial Pass | 2/17/2023 | 02/17/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/17/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
02/17/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
02/17/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
02/17/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
02/17/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
02/17/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
02/17/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
02/17/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
02/17/2023
remove contaminated rock from the French drain. From CB 111 to CB 105.
inspector must visually inspect rock and fabric before it can be backfilled
|
||||
Engineering Daily Inspection | Partial Pass | 3/6/2023 | 03/06/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/06/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Carried Forward
03/06/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Carried Forward
03/06/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Carried Forward
03/06/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
|
||||
Other/Miscellaneous
Carried Forward
03/06/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Carried Forward
03/06/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Carried Forward
03/06/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Carried Forward
03/06/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Carried Forward
03/06/2023
remove contaminated rock from the French drain. From CB 111 to CB 105.
inspector must visually inspect rock and fabric before it can be backfilled
|
||||
Engineering Daily Inspection | Stop Work | 3/8/2023 | 03/08/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/06/2023
finish testing and tv'ing storm lines. fix all bellies and failed storm lines. retest and camera. Once passed finish grout all CB's and MH's and install ladders
|
||||
Other/Miscellaneous
Outstanding
03/06/2023
raise all castings from paving
|
||||
Other/Miscellaneous
Outstanding
03/06/2023
fix grade bust on the curb at the exit of the parent drop off and Wildwood DR.
|
||||
Other/Miscellaneous
Outstanding
03/06/2023
all the wheelchair ramps are out of ada compliance. Remove ramps and install per current ADA standards.
two ramps remaining.
|
||||
Other/Miscellaneous
Resolved
03/08/2023
rotate hydrant in the bus loop. install all Storz fittings on all hydrants.
|
||||
Other/Miscellaneous
Outstanding
03/06/2023
grind and overlay damaged areas in Wildwood Park Drive from equipment.
|
||||
Other/Miscellaneous
Outstanding
03/06/2023
once final paved remove temp striping and repaint
|
||||
Other/Miscellaneous
Outstanding
03/06/2023
replace all cracked and broken curb and sidewalk
|
||||
Other/Miscellaneous
Resolved
04/25/2023
remove contaminated rock from the French drain. From CB 111 to CB 105.
inspector must visually inspect rock and fabric before it can be backfilled
|
||||
Erosion And Sediment Inspection | Failed | 3/8/2023 | 03/08/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/08/2023
install erosion control measures around the exposed soils in the ball field.
|
||||
Other/Miscellaneous
Carried Forward
03/08/2023
Fix all erosion control issue throughout site.
|
||||
Other/Miscellaneous
Carried Forward
03/08/2023
Provide the CESCL reports from the DOE NPDES permit
|
||||
Erosion And Sediment Inspection | Partial Pass | 3/17/2023 | 03/17/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/17/2023
install erosion control measures around the exposed soils in the ball field.
|
||||
Other/Miscellaneous
Carried Forward
03/17/2023
Fix all erosion control issue throughout site.
|
||||
Other/Miscellaneous
Carried Forward
03/17/2023
Provide the CESCL reports from the DOE NPDES permit
|
||||
Erosion And Sediment Inspection | Partial Pass | 3/21/2023 | 03/21/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/21/2023
install erosion control measures around the exposed soils in the ball field.
|
||||
Other/Miscellaneous
Carried Forward
03/21/2023
Fix all erosion control issue throughout site.
|
||||
Other/Miscellaneous
Carried Forward
03/21/2023
Provide the CESCL reports from the DOE NPDES permit
|
||||
Engineering Daily Inspection | Partial Pass | 4/3/2023 | 04/03/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/5/2023 | 04/05/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/7/2023 | 04/07/2023 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/12/2023 | 04/12/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 4/26/2023 | 04/26/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 4/27/2023 | 04/27/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 4/28/2023 | 04/28/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/19/2023 | 05/19/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/22/2023 | 05/24/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/31/2023 | 06/01/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/12/2023 | 06/12/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/26/2023 | 06/27/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/27/2023 | 06/28/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/28/2023 | 06/29/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/29/2023 | 06/30/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 06/30/2023 | ||
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/5/2023 | 07/05/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/6/2023 | 07/07/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Passed w/ Conditions | 7/10/2023 | 07/10/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 07/11/2023 | ||
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/13/2023 | 07/13/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/12/2023 | 07/13/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/15/2023 | 07/17/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/17/2023 | 07/17/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/18/2023 | 07/18/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/19/2023 | 07/19/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/20/2023 | 07/21/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/21/2023 | 07/21/2023 | |
Michael Rosenau ((253) 344-6753) | ||||
Engineering Daily Inspection | Partial Pass | 7/22/2023 | 07/24/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/24/2023 | 07/26/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/25/2023 | 07/26/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/26/2023 | 07/27/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/27/2023 | 08/01/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/28/2023 | 08/01/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/31/2023 | 08/01/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/2/2023 | 08/02/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/1/2023 | 08/02/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/4/2023 | 08/07/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/7/2023 | 08/10/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/8/2023 | 08/10/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/9/2023 | 08/10/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/11/2023 | 08/11/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/17/2023 | 08/18/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/18/2023 | 08/21/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/21/2023 | 08/23/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/23/2023 | 08/25/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/25/2023 | 08/28/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/28/2023 | 08/28/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/1/2023 | 09/01/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/5/2023 | 09/05/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 9/13/2023 | 09/13/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Punchlist Inspection | Partial Pass | 9/13/2023 | 09/13/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Planning Final Inspection | Not Ready | 9/13/2023 | 09/14/2023 | |
Chris Beale ((253) 841-5418) | ||||
Planning Landscape Inspection | Passed | 9/25/2023 | 09/25/2023 | |
Chris Beale ((253) 841-5418) | ||||
Engineering Punchlist Inspection | Partial Pass | 9/25/2023 | 9/26/2023 | 09/26/2023 |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/2/2023 | 10/02/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/5/2023 | 10/05/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/6/2023 | 10/06/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/10/2023 | 10/11/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/11/2023 | 10/12/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 10/12/2023 | 10/12/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 11/2/2023 | 11/02/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Not Ready | 12/26/2023 | 12/26/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/29/2023 | 12/29/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/7/2025 | 01/07/2025 | |
Jeff Hill ((253) 204-5633) |
Condition | Status | Category |
---|---|---|
Civil Standard Conditions | Open | Standard Conditions |
Engineering Division
1. Construction permitted as per approved civil plans.
2. Construction permit shall expire by limitation and be declared void if:
* Work is not started within 180 days of obtaining the permit
* Work is abondoned for 180 days or more after beginning work
* After two years from the date of permit issuance, regardless of whether work is finished
3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review.
5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
||
Pipeline Notfication Rcw 19.122.033 | Resolved | Standard Conditions |
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
|
||
Punchlist: Developer/Contractor to secure all street-lighting J-boxes | Resolved | Street Punchlist Section B |
Development & Permitting Services
Developer/contractor shall be responsible to secure all street-lighting j-boxes by placing an ecology block temporarily over the top of the boxes until such time as the sidewalks adjacent to the j-boxes are poured and the boxes are incorporated into the permanent concrete sidewalks. (Alternate: Developer/contractor shall be responsible to secure all street-lighting j-boxes from vandalism and theft until such time that the street lighting is accepted and under operation by the City. J-boxes shall be secured by placing an ecology block temporarily over the top of the boxes, tack welding the lids, or other means which will not permanently damage the j-boxes. Upon request of the City, temporary protection measures shall be removed and the j-boxes restored, as necessary, to their original installed condition.)
|
||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
Development & Permitting Services
install rip rap pad on over flow pipe from PS 401 and the out fall from CB 114
per detail 6 on page C3.04
|
||
Punchlist: Miscellaneous Stormwater A Item | Open | Storm Punchlist Section A |
Development & Permitting Services
fix leaks in the storm lines:
CB109 to 103
CB 201 to 202
CB 202 to 203
CB 206 to SF 03
|
||
Punchlist: Miscellaneous A Item | Open | Misc. Punchlist Section A |
Development & Permitting Services
Replace all damaged and cracked new curb through out the site.
|
||
Punchlist: Miscellaneous Stormwater A Item | Open | Storm Punchlist Section A |
Development & Permitting Services
fix bellies in the following storm lines:
CB 110 to pond
CB 116 to PS 401
CB 114 to CB 115
CB 107 to CB 113
CB 104 to CB 115
CB 104 to SF 04
CB 112 to SF 04
CB 109 to SF 04
CB 109 to CB 103 ( deformed pipe)
CB 102 to CB 103
CB 101 to CB 102
CB 202 to CB 207
CB 201 to CB 202
CB 202 to CB 203
CB 203 to CB 204
CB 206 to SF 03
CB 205 to CB 206
|
||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
Development & Permitting Services
Provide the city with a copy of the television inspection for all the storm lines.
|
||
Punchlist: Miscellaneous Stormwater A Item | Open | Storm Punchlist Section A |
Development & Permitting Services
CB 104- the inlet is 0.20 lower than the outfall. Reinstall pipe at proper elevation.
|
||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
Development & Permitting Services
perform a final cleaning of the storm system.
|
||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
Development & Permitting Services
CB 113- The flat top has large chunks of concrete missing and the rebar is exposed. replace flat top.
|
||
Punchlist: Miscellaneous Sewer A Item | Resolved | Sewer Punchlist Section A |
Development & Permitting Services
finish grout SSMH 01
|
||
Punchlist: Miscellaneous Sewer A Item | Resolved | Sewer Punchlist Section A |
Development & Permitting Services
Pour a collar around SSMH 01
|
||
Punchlist: Miscellaneous Water A Item | Resolved | Water Punchlist Section A |
Development & Permitting Services
paint all HYD's & FDC
|
||
Punchlist: Miscellaneous Water A Item | Open | Water Punchlist Section A |
Development & Permitting Services
repair side port and bonnet on the
lower lot northern most hydrant
|
||
Punchlist: Miscellaneous Water A Item | Resolved | Water Punchlist Section A |
Development & Permitting Services
install guard posts at all hydrants
|
||
Punchlist: Miscellaneous Water B Item | Resolved | Water Punchlist Section B |
Development & Permitting Services
paint all hydrants and the FDC
|
||
Punchlist: Miscellaneous A Item | Open | Misc. Punchlist Section A |
Development & Permitting Services
ADA pathway from the doors in front of the lower roundabout is over 2%
All ADA pathways are to be under 2%
|
||
Punchlist: Miscellaneous Streets A Item | Resolved | Street Punchlist Section A |
Development & Permitting Services
remove lane shift in wildwood dr. and repaint
|
||
Punchlist: Miscellaneous Streets A Item | Open | Street Punchlist Section A |
Development & Permitting Services
finish channelization on and off site.
see pages C2.01 through C2.03
|
||
Punchlist: Miscellaneous Streets A Item | Resolved | Street Punchlist Section A |
Development & Permitting Services
repair damaged asphalt in Wildwood DR from excavator tracks.
entrance to the parent drop off.
|
||
Punchlist: Miscellaneous Streets B Item | Resolved | Street Punchlist Section B |
Development & Permitting Services
Seal asphalt at the entry to the bus loop
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Development & Permitting Services
repair all damaged asphalt in the upper parking lot.
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Development & Permitting Services
remove all stockpiled materials
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Development & Permitting Services
stabilize soils throughout the site.
|
||
Punchlist: Miscellaneous B Item | Resolved | Misc. Punchlist Section B |
Development & Permitting Services
once soils have been stabilized and a final cleaning of the storm system is complete remove all BMP's
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Development & Permitting Services
Finish paving disturbed areas in the lower lot.
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Development & Permitting Services
clean up and restore the area around pole 6.
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Development & Permitting Services
Remove pedestrian bypass and restore at the entrance to the lower lot.
|
||
Punchlist: Provide RPBA Test Results | Resolved | Water Punchlist Section A |
Engineering Division
Provide the City with the test results for the Reduced Pressure Backflow Assembly (RPBA).
|
||
Punchlist: Provide the City a letter from the Design Engineer for the proper install of the stormwater BMP’s | Open | Storm Punchlist Section A |
Engineering Division
Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan. This letter may refer to the limited storm work that is to be completed at a later date. In other words, only certify the portions that are finished.
|
||
Punchlist: Provide DCVA Test Results | Resolved | Water Punchlist Section A |
Engineering Division
Provide the City with the test results for the irrigation Double Check Valve Assembly (DCVA).
|
||
Punchlist: This project owes overtime inspection fees | Open | Misc. Punchlist Section A |
Engineering Division
This project owes $1,185 in overtime inspection fees. [Robyn Buck @ 08/16/2023 4:33 PM]
|
||
Punchlist: Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection | Open | Misc. Punchlist Section A |
Engineering Division
Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection. Landscape requirements to be added to the punchlist.
|
||
Punchlist: Complete all required street monumentation | Resolved | Street Punchlist Section B |
Engineering Division
Complete all required street monumentation.
|
||
Punchlist: Provide the City with an electronic version of the record drawings | Open | Misc. Punchlist Section B |
Engineering Division
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
|
||
Punchlist: Provide the City with data for all new infrastructure installed for this project | Open | Misc. Punchlist Section B |
Engineering Division
Provide the City with data for all new infrastructure installed for this project. This data is to be provided by the design engineer, see attached form.
|
||
Punchlist: Provide an O&M Manual for the project | Open | Storm Punchlist Section B |
Engineering Division
Please submit an operation and maintenance manual that is consistent with the provisions in Volume V of the Stormwater Management Manual for Western Washington (2012) for all stormwater facilities and BMP’s associated with this project. A copy of this operation and maintenance manual shall be retained onsite or within reasonable access to the site and shall be transferred with the property to the new owner.
|
||
Punchlist: Provide the City with a signed stormwater agreement | Open | Storm Punchlist Section B |
Engineering Division
Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described in item 3 as a recorded exhibit.
|
Reference Number | Status | Type |
---|---|---|
B-20-0993 | Permit(s) Issued | Commercial - Addition |
F-21-0083 | Closed | Fire Alarms |
PRFS20221060 | Closed | Fire Sprinklers |
PRSG20230064 | Closed | Sign/Awning |
PRPF20230822 | Expired | Pre-Fabricated Building |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.