Summary

B-21-0480
Commercial - Tenant Improvement/Remodel
Closed
GOOD SAMARITIAN HOSPITAL
Alteration/Remodel
RENOVATION OF EXSTNG GARAGE ~ MHS GOOD SAMLoading Dock Area -
06/25/2021
07/08/2022
04/23/2023
10/25/2022

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 10/18/2022 10/24/2022
Building Review Approved 07/01/2022 06/30/2022
Building Review Failed 07/19/2021 06/08/2022
Fire Review Approved 08/02/2021
Engineering Review Approved 07/20/2021
Planning Review In Progress 07/12/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $853.75 $853.75 Paid 07/08/2022
Mechanical Permit Fee $93.20 $93.20 Paid 07/08/2022
$40.00
Building Plan Review Fee $554.94 $554.94 Paid 07/08/2022
Mechanical Plan Review Fee $60.58 $60.58 Paid 07/08/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 07/08/2022
Plumbing Fixtures Fee $65.00 $65.00 Paid 07/08/2022
Plumbing Permit Fee $40.00 $40.00 Paid 07/08/2022
Plumbing Plan Review Fee $68.25 $68.25 Paid 07/08/2022
Fire Plan Review Fee $265.00 $265.00 Paid 07/08/2022
Water System Development ChargeFee - Tenant Improvment/Addition $713.55 $713.55 Paid 07/08/2022
Sewer System Development ChargeFee - Tenant Improvment/Addition $3,946.30 $3,946.30 Paid 07/08/2022
Resubmittal Fee $130.00 $130.00 Paid 07/08/2022
Resubmittal Fee $260.00 $260.00 Paid 09/23/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Not Ready 7/18/2022 7/18/2022 07/18/2022
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Partial Pass 7/28/2022 7/28/2022 07/28/2022
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 8/9/2022 8/9/2022 08/09/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
08/09/2022
1. Do not cover west wall

Energy (Insulation) Inspection Failed 8/15/2022 8/15/2022 08/15/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
08/15/2022
TAPE SEAMS OF R-10 AS PER PLAN

Energy (Insulation) Inspection Partial Pass 8/17/2022 8/17/2022 08/17/2022
Kevin Spruell ((253) 841-5590)
Mechanical Rough In Inspection Partial Pass 9/30/2022 9/30/2022 09/30/2022
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Failed 9/30/2022 9/30/2022 09/30/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
09/30/2022
1. complete tie wire at perimeter 2. provide spreader bars or berc clips 3.provide positive connection of wires at side walls to studs 4. ceiling to be riveted on 2 sides and float on 2 sides 5. complete mono coat on beams 6.complete electrical 7.insulate water pips

Ceiling Grid/T-Bar Inspection Failed 10/12/2022 10/12/2022 10/12/2022
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
10/12/2022
1. complete tie wire at perimeter 2. provide spreader bars or berc clips 3.provide positive connection of wires at side walls to studs 4. ceiling to be riveted on 2 sides and float on 2 sides 5. complete mono coat on beams 6.complete electrical 7.insulate water pips

Other/Miscellaneous
Carried Forward
10/12/2022
1.complete perimeter wire as discussed with contractor 2. complete positive attachment to light fixture 3.complete positive attachment of diffuser at main bar

Hydrostatic Test 200Lbs 2Hrs VOID 10/24/2022
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection VOID 10/24/2022
David Drake ((253) 864-4171)
Erosion And Sediment Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Roof Sheathing Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Underfloor Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Comment Building Div Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Frame Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
08/09/2022
1. Do not cover west wall

Exhaust/Vent Fans Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Cover Inspection/Thrust Blocks Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Planning Final Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Planning Critical Area Mitigation Installation Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Engineering Final Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Re-Roof Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)
Gas Test Inspection VOID 10/25/2022
Shannon King ((253) 840-6684)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Building Permit Standard Conditions Open Building Division Standard Conditions
: PERMIT CONDITIONS: 1- COMPLY WITH 2018 IFC AND 2018 IBC 2- EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 3- EMERGENCY RADIO TEST REQUIRED COMPLY WITH IFC SECTION 510. FIRE FINAL APPROVAL APON COMPLETED TEST RESULTS 4- SEPARATE PERMITS REQUIRED FOR FIRE ALARM AND FIRE SRPINKLER 5- RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN. 6- FIRE EXTINGUISHERS REQUIRED PER CODE 7- ALL FIRE LANE STRIPPING AND SIGNAGE NEEDS TO BE UPDATED IN THIS AREA. 8- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL INSPECTION REQUEST CODES: 2252 EXIT LIGHT TEST 5610 EMERGENCY RADIO TEST 9200 FIRE BUILDING FINAL SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8AM TO SET UP A TIME. INSPECTIONS ARE MONDAY - THURSDAY THERE WILL BE NO INSPECTIONS ON FRIDAYS. HTTPS://SECURE.CITYOFPUYALLUP.ORG/ INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE) DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585
Pipeline Notfication Rcw 19.122.033 Open Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
06/17/2022 Plans b-21-0480 app3 (Flattened)
06/17/2022 Plans b-21-0480 plumb fixture worksheet3 (Flattened)
07/01/2022 Other 011418 Multicare Good Samaritan_0X6 (Flattened)
07/01/2022 Plans B21-0480_220617 Good Sam Hosp Body Holding remodel (Stamped)
07/01/2022 Other E022254 - Good Samaritan Hospital 100% Redundancy (3) (1)0 (Flattened)
07/08/2022 Letter Permit - Detailed
07/08/2022 Receipt Receipt for transaction:2022-001304
07/18/2022 Report Inspection Report (Comment Building Div Inspection)
07/28/2022 Report Inspection Report (Plumbing Below Slab Inspection)
08/09/2022 Report Inspection Report (Frame Inspection)
08/09/2022 Report Inspection Report (Slab/Insulation Inspection)
09/23/2022 Receipt Receipt for transaction:2022-001887
09/30/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
09/30/2022 Report Inspection Report (Mechanical Rough In Inspection)
10/12/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
10/13/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
10/17/2022 Report Inspection Report (Refrigeration Line Test Inspection)
10/24/2022 Report Inspection Report (Building Final Inspection)
10/24/2022 Report Inspection Report (Mechanical Final Inspection)
10/24/2022 Report Inspection Report (Plumbing Final Inspection)