CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

B-21-0727


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

B-21-0727
Commercial - Tenant Improvement/Remodel
Closed
CASCADE CHRISTIAN SCHOOLS
Alteration/Remodel
PHASE IIIA: SHELL FOR CLASSRMS; FINISH 1ST FL (5 CLASSRMS & ADMIN AREA) CCS BLDG - REVISION TO CONNECT WH FROM LOBBY TO CLASSROOM
09/17/2021
02/04/2022
08/20/2023
02/21/2023

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 08/26/2022 08/16/2022
Building Review Failed 08/12/2022 08/10/2022
Engineering Review VOID 08/12/2022 08/02/2022
Fire Review VOID 08/12/2022 08/02/2022
Planning Review VOID 08/12/2022 08/02/2022
Building Review Failed 06/20/2022 06/17/2022
Engineering Review Approved 01/01/2022 01/28/2022
Fire Review Approved 01/01/2022 01/03/2022
Building Review Approved 01/01/2022 12/23/2021
Building Review Approved 12/22/2021
Fire Review Approved 10/30/2021
Planning Review Approved 10/06/2021
Engineering Review Failed 09/23/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Plumbing Fixtures Fee $169.00 $169.00 Paid 02/02/2022
Plumbing Permit Fee $40.00 $40.00 Paid 02/02/2022
Plumbing Plan Review Fee $135.85 $135.85 Paid 02/02/2022
Building Permit Fee $17,288.75 $17,288.75 Paid 02/02/2022
Building Plan Review Fee $11,237.69 $11,237.69 Paid 02/02/2022
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 02/02/2022
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee $35.95 $35.95 Paid 02/02/2022
Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee $19.40 $19.40 Paid 02/02/2022
Air Handling Unit (Up to 10,000 cfm) Fee $169.20 $169.20 Paid 02/02/2022
Mechanical Duct Work Fee $24.00 $24.00 Paid 02/02/2022
Mechanical Permit Fee $40.00 $40.00 Paid 02/02/2022
Mechanical Plan Review Fee $205.89 $205.89 Paid 02/02/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 02/02/2022
Ventilation System (apart from Heating/AC) Fee $28.20 $28.20 Paid 02/02/2022
Sewer System Development Charge $10,430.56 $10,430.56 Paid 02/02/2022
$10,402.76
Water System Development Charge $4,982.79 $4,982.79 Paid 02/02/2022
$4,962.69
Building Division Fee (Hourly) $130.00 $130.00 Paid 02/02/2022
Traffic Impact Fee (Commercial) $149,040.00 $149,040.00 Paid 02/02/2022
Building Division Fee (Hourly) $130.00 $130.00 Paid 07/05/2022
Resubmittal/Revision Fee $130.00 $130.00 Paid 07/05/2022
Resubmittal/Revision Fee $130.00 $130.00 Paid 08/19/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Foundation/Rebar Inspection Not Ready 2/8/2022 2/8/2022 02/08/2022
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection Not Ready 2/10/2022 2/10/2022 02/10/2022
Gary Webster ((253) 841-5590)
Foundation/Rebar Inspection Not Ready 2/16/2022 2/16/2022 02/16/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/16/2022
footings - only

Footing/Setback Inspection Partial Pass 2/16/2022 2/16/2022 02/16/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/16/2022
received geo-tech approval & special inspection of rebar progressing with special inspection

Plumbing Below Slab Inspection Not Ready 2/22/2022 2/22/2022 02/22/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
02/22/2022
1 ; cancel per contractor due to no City approved plans for permit b-20-0306 on-site at time of inspection. ( contractor will reschedule for both inspections of below slab plumbing of permit B-21-0727 & plumbing rough-in o permit B-20-0306 for tomorrow morning as discussed with Jim)

Plumbing Below Slab Inspection Passed w/ Conditions 2/23/2022 2/23/2022 02/23/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
02/23/2022
1 ; cancel per contractor due to no City approved plans for permit b-20-0306 on-site at time of inspection. ( contractor will reschedule for both inspections of below slab plumbing of permit B-21-0727 & plumbing rough-in o permit B-20-0306 for tomorrow morning as discussed with Jim) 2 ; below slab plumbing approved pending as-built plumbing plans approved by Mechanical Engineer of record as per city approved plans.

Underfloor Inspection Partial Pass 3/2/2022 3/2/2022 03/02/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/02/2022
1 ; complete all rebar as per City Approved plans & install of holdowns with min. embed depth as per engineers correction approval letter as at grid line - (1-2,C.5-E) (A,2-5) (5,A-E) exterior walls only. 2 ;approved with special inspection approval.

Foundation/Rebar Inspection Partial Pass 3/9/2022 3/9/2022 03/09/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
03/09/2022
1 ; approved footings only at grid line - (1-2,a-d)

Energy (Insulation) Inspection Partial Pass 3/11/2022 3/11/2022 03/11/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
03/11/2022
RIDID INSULATION FROM TOP OF FOOTING TO TOP OF FOUNDATION WALL - OK - MINUS SMALL SECTION FORMED FOR POUR ON SOUTH END

Footing/Setback Inspection Partial Pass 3/11/2022 3/11/2022 03/11/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
03/11/2022
received geo-tech approval & special inspection of rebar progressing with special inspection

Foundation/Rebar Inspection Passed 3/21/2022 3/21/2022 03/21/2022
Gary Webster ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
03/09/2022
1 ; approved footings only at grid line - (1-2,a-d)

Energy (Insulation) Inspection Partial Pass 3/22/2022 3/22/2022 03/22/2022
Gary Webster ((253) 841-5590)
Underfloor Inspection Not Ready 5/2/2022 5/2/2022 05/02/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
05/02/2022
1 ; complete all rebar as per City Approved plans & install of holdowns with min. embed depth as per engineers correction approval letter as at grid line - (1-2,C.5-E) (A,2-5) (5,A-E) exterior walls only. 2 ;approved with special inspection approval.

Underfloor Inspection Not Ready 6/3/2022 6/3/2022 06/03/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
06/03/2022
1 ; complete all rebar as per City Approved plans & install of holdowns with min. embed depth as per engineers correction approval letter as at grid line - (1-2,C.5-E) (A,2-5) (5,A-E) exterior walls only. 2 ;approved with special inspection approval.

Other/Miscellaneous
Carried Forward
06/03/2022
CALLED FOR ROOF SHEATHING INSP, SEE FRAME ON THIS DATE.

Re-Roof Inspection Not Ready 6/6/2022 6/6/2022 06/06/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
06/06/2022
1 ; complete nailing of straps as per City approved plans and provide special inspection approval.

Underfloor Inspection Partial Pass 6/7/2022 6/7/2022 06/07/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
06/07/2022
1 ; complete all rebar as per City Approved plans & install of holdowns with min. embed depth as per engineers correction approval letter as at grid line - (1-2,C.5-E) (A,2-5) (5,A-E) exterior walls only. 2 ;approved with special inspection approval.

Firewall/Firestop Inspection Partial Pass 6/8/2022 6/8/2022 06/08/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
06/08/2022
1:blocking at roof line per rfi and a-35 clips at dbl studs at parapet per rfi in place no nailing inspected at this time

Energy (Insulation) Inspection Not Ready 6/10/2022 6/10/2022 06/10/2022
Shannon King ((253) 840-6684)
Shear Wall Inspection Failed 6/10/2022 6/10/2022 06/10/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
06/10/2022
1 ; complete shear wall nailing as per City approved plans and renail overdriven nails at grid line -( 7,c1-e)

Shear Wall Inspection Partial Pass 6/13/2022 6/13/2022 06/13/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
06/13/2022
1 ; complete shear wall nailing as per City approved plans and renail overdriven nails at grid line -( 7,c1-e)

Energy (Insulation) Inspection Partial Pass 6/15/2022 6/15/2022 06/15/2022
Shannon King ((253) 840-6684)
Shear Wall Inspection Partial Pass 6/17/2022 6/17/2022 06/17/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
06/17/2022
nailing at west wall ground up ok, received special insp report

Gas Test Inspection Not Ready 7/13/2022 7/13/2022 07/13/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
07/13/2022
1 ; provide city approved gas piping plans at time on inspection,.

Mechanical Rough In Inspection Not Ready 7/26/2022 7/26/2022 07/26/2022
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Partial Pass 7/29/2022 7/29/2022 07/29/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
07/29/2022
INSP FOR 1ST LEVEL, 1 TO 5 LINE (CLASSROOMS) 1:dwv ok up to second floor 2:provide test on supply at 3 classrooms on south side of corridor.

Plumbing Rough In Inspection Not Ready 8/2/2022 8/2/2022 08/02/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/02/2022
1. Rooms 112’ 113 will be caped in the wall for future use permits required Room 111 provide permits for eye washing station that is not on current city approved plans

Frame Inspection Not Ready 8/24/2022 8/24/2022 08/24/2022
Shannon King ((253) 840-6684)
Frame Inspection Not Ready 8/25/2022 8/25/2022 08/25/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/25/2022
1.tighten all anchor bolts 2.complete all draft stops horizontally and vertically 3. at 6 classrooms as discussed with contractor in SW corner of building

Plumbing Rough In Inspection Partial Pass 8/31/2022 8/31/2022 08/31/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/31/2022
1. Rooms 112’ 113 will be caped in the wall for future use permits required Room 111 provide permits for eye washing station that is not on current city approved plans

Frame Inspection Partial Pass 8/31/2022 8/31/2022 08/31/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
08/31/2022
1. room 113 provide nail plates at DWV 2. Room 110 add anchor bolts where missing 3.Room 112 provide nail plates at DWV 4. Room 112 complete shear nailing at top of wall [east wall] 5. room 109 provide nail plate at DWV 6.Provide anchor bolts at end of hallway on each side of door 7.room 108 provide positive connection at sill plate 8. complete SDS screws in rim at hallway 9. OK TO INSULATE

Frame Inspection Partial Pass 9/6/2022 9/6/2022 09/06/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
09/06/2022
1.tighten all anchor bolts 2.complete all draft stops horizontally and vertically 3. at 6 classrooms as discussed with contractor in SW corner of building

Energy (Insulation) Inspection Partial Pass 9/7/2022 9/7/2022 09/07/2022
Shannon King ((253) 840-6684)
Gas Test Inspection Passed 9/8/2022 9/8/2022 09/08/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
07/13/2022
1 ; provide city approved gas piping plans at time on inspection,.

Wallboard / Drywall Inspection Partial Pass 9/16/2022 9/16/2022 09/16/2022
Shannon King ((253) 840-6684)
Frame Inspection Not Ready 9/22/2022 9/22/2022 09/22/2022
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/22/2022
1. room 113 provide nail plates at DWV 2. Room 110 add anchor bolts where missing 3.Room 112 provide nail plates at DWV 4. Room 112 complete shear nailing at top of wall [east wall] 5. room 109 provide nail plate at DWV 6.Provide anchor bolts at end of hallway on each side of door 7.room 108 provide positive connection at sill plate 8. complete SDS screws in rim at hallway 9. OK TO INSULATE

Other/Miscellaneous
Carried Forward
09/22/2022
1.provide positive connection at stair stringers 2. complete poly seal at all penetration's as discussed with contractor

Frame Inspection Partial Pass 9/23/2022 9/23/2022 09/23/2022
Kevin Spruell ((253) 841-5590)
Energy (Insulation) Inspection Failed 9/29/2022 9/29/2022 09/29/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
09/29/2022
1. complete insulation as discussed with contractor 2. provide nail plate at wall by stairs 3. seal penetration's at top plate next to stairs

Frame Inspection Not Ready 10/3/2022 10/3/2022 10/03/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
10/03/2022
1. provide anchor bolts at wall between stairs

Energy (Insulation) Inspection Partial Pass 10/3/2022 10/3/2022 10/03/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
10/03/2022
1. complete insulation as discussed with contractor 2. provide nail plate at wall by stairs 3. seal penetration's at top plate next to stairs

Frame Inspection Partial Pass 10/4/2022 10/4/2022 10/04/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
09/22/2022
1. room 113 provide nail plates at DWV 2. Room 110 add anchor bolts where missing 3.Room 112 provide nail plates at DWV 4. Room 112 complete shear nailing at top of wall [east wall] 5. room 109 provide nail plate at DWV 6.Provide anchor bolts at end of hallway on each side of door 7.room 108 provide positive connection at sill plate 8. complete SDS screws in rim at hallway 9. OK TO INSULATE

Other/Miscellaneous
Outstanding
09/22/2022
1.provide positive connection at stair stringers 2. complete poly seal at all penetration's as discussed with contractor

Energy (Insulation) Inspection Partial Pass 10/4/2022 10/4/2022 10/04/2022
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 10/5/2022 10/5/2022 10/05/2022
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 10/20/2022 10/20/2022 10/20/2022
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 12/5/2022 12/5/2022 12/05/2022
Kevin Spruell ((253) 841-5590)
Ceiling Grid/T-Bar Inspection Partial Pass 12/8/2022 12/8/2022 12/08/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
12/08/2022
1 ; complete all ceiling grid requirements as per City approved plans as discussed with contractor. 2 ; ok to cover ceiling grid at west stairs only. not ready

Exit Lighting Test Inspection Passed 12/12/2022 12/12/2022 12/12/2022
David Drake ((253) 864-4171)
Ceiling Grid/T-Bar Inspection Partial Pass 12/12/2022 12/12/2022 12/12/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
12/12/2022
1 ; complete all ceiling grid requirements as per City approved plans as discussed with contractor. 2 ; ok to cover ceiling grid at west stairs only. not ready

Ceiling Grid/T-Bar Inspection Passed 12/19/2022 12/19/2022 12/19/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
12/12/2022
1 ; complete all ceiling grid requirements as per City approved plans as discussed with contractor. 2 ; ok to cover ceiling grid at west stairs only. not ready

Engineering Final Inspection Not Ready 12/20/2022 12/20/2022 12/20/2022
Michael Rosenau ((253) 344-6753)
Mechanical Final Inspection Failed 12/20/2022 12/20/2022 12/20/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
12/20/2022
1. ; provide balance report as discussed with contractor. 2 ; paint gas pipe on roof. 3 ; protect insulation on refrigeration line set from u.v. rays. 4 ; seal penetration in exterior of building at refrigeration line set. 5 ; complete install of ladder for roof to access.

Fire Final Inspection Not Ready 12/22/2022 12/22/2022 12/22/2022
David Drake ((253) 864-4171)
Mechanical Final Inspection Not Ready 12/27/2022 12/27/2022 12/27/2022
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
01/03/2023
1. ; provide balance report as discussed with contractor. 2 ; paint gas pipe on roof. 3 ; protect insulation on refrigeration line set from u.v. rays. 4 ; seal penetration in exterior of building at refrigeration line set. 5 ; complete install of ladder for roof to access.

Engineering Final Inspection Not Ready 1/6/2023 1/6/2023 01/06/2023
Michael Rosenau ((253) 344-6753)
Corrections:


Other/Miscellaneous
Carried Forward
01/06/2023
-Connect downspouts on north side of BLDG to underground downspout drain line. -Cut down cleanout, install threaded cap & adaptor, and Carson Box on the C.O. on the north side of the building at the west end.

Planning Final Inspection Passed 1/6/2023 01/09/2023
Chris Beale ((253) 841-5418)
Engineering Final Inspection Passed 1/11/2023 1/11/2023 01/11/2023
Michael Rosenau ((253) 344-6753)
Corrections:


Other/Miscellaneous
Resolved
01/11/2023
-Connect downspouts on north side of BLDG to underground downspout drain line. -Cut down cleanout, install threaded cap & adaptor, and Carson Box on the C.O. on the north side of the building at the west end.

Building Final Inspection Failed 1/12/2023 1/12/2023 01/12/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
01/12/2023
1 ; complete accessible route from pubic sidewalk to building as per code. 2 ; complete #2 accessible parking spaces & signage as required per city approved plans. 3 ; complete access to inspect ceiling in room 102 covered with-out inspection approval. (access hatch required per fire inspector.) 4 ; caulk mop sink in room 102. 5 ; provide trap primmer at floor drain of eye wash station. 6 ; complete threshold and door sweep at west exterior exit door. 7 ; complete self closing access doors at stairwells. 8 ; complete fire rated door at 2nd floor stairwell. (gap at bottom of door exceeds maximum gap of 3/4'' as per NFPA) 9 ; complete handrail extension minimum 12'' past stair nosing with returns as discussed with contractor. 10 ; provide minimum 1 1/2'' clearance from wall to interior of handrail at east stairs. 11 ; complete handrails at exterior steps 34''-38'' above stair hosing with 12'' extensions at top and bottom of steps on both sides of steps. 12 ; complete exterior grade to drain away from building as per code as discussed with contractor. 13 ; seal penetrations in exterior of building

Building Final Inspection Partial Pass 1/17/2023 1/17/2023 01/17/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
02/08/2023
1 ; complete accessible route from pubic sidewalk to building as per code. 2 ; complete #2 accessible parking spaces & signage as required per city approved plans. 3 ; complete access to inspect ceiling in room 102 covered with-out inspection approval. (access hatch required per fire inspector.) 4 ; caulk mop sink in room 102. 5 ; provide trap primmer at floor drain of eye wash station. 6 ; complete threshold and door sweep at west exterior exit door. 7 ; complete self closing access doors at stairwells. 8 ; complete fire rated door at 2nd floor stairwell. (gap at bottom of door exceeds maximum gap of 3/4'' as per NFPA) 9 ; complete handrail extension minimum 12'' past stair nosing with returns as discussed with contractor. 10 ; provide minimum 1 1/2'' clearance from wall to interior of handrail at east stairs. 11 ; complete handrails at exterior steps 34''-38'' above stair hosing with 12'' extensions at top and bottom of steps on both sides of steps. 12 ; complete exterior grade to drain away from building as per code as discussed with contractor. 13 ; seal penetrations in exterior of building. 14 ; T.C.O. approved for 30 days from 1/17/2023 at 1st floor only.

Building Final Inspection Failed 2/16/2023 2/16/2023 02/16/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
02/16/2023
1 ; complete accessible route from pubic sidewalk to building as per code. 2 ; complete #2 accessible parking spaces & signage as required per city approved plans. 3 ; complete access to inspect ceiling in room 102 covered with-out inspection approval. (access hatch required per fire inspector.) 4 ; caulk mop sink in room 102. 5 ; provide trap primmer at floor drain of eye wash station. 6 ; complete threshold and door sweep at west exterior exit door. 7 ; complete self closing access doors at stairwells. 8 ; complete fire rated door at 2nd floor stairwell. (gap at bottom of door exceeds maximum gap of 3/4'' as per NFPA) 9 ; complete handrail extension minimum 12'' past stair nosing with returns as discussed with contractor. 10 ; provide minimum 1 1/2'' clearance from wall to interior of handrail at east stairs. 11 ; complete handrails at exterior steps 34''-38'' above stair hosing with 12'' extensions at top and bottom of steps on both sides of steps. 12 ; complete exterior grade to drain away from building as per code as discussed with contractor. 13 ; seal penetrations in exterior of building. 14 ; T.C.O. approved for 30 days from 1/17/2023 at 1st floor only.

Other/Miscellaneous
Carried Forward
02/16/2023
1 ; complete accessible parking signage min. 60'' above parking surface at accessible parking stalls. 2 ; complete accessible path not to exceed 2% side slope as discussed with contractor.

Building Final Inspection Passed 2/21/2023 2/21/2023 02/21/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
02/21/2023
1 ; complete accessible route from pubic sidewalk to building as per code. 2 ; complete #2 accessible parking spaces & signage as required per city approved plans. 3 ; complete access to inspect ceiling in room 102 covered with-out inspection approval. (access hatch required per fire inspector.) 4 ; caulk mop sink in room 102. 5 ; provide trap primmer at floor drain of eye wash station. 6 ; complete threshold and door sweep at west exterior exit door. 7 ; complete self closing access doors at stairwells. 8 ; complete fire rated door at 2nd floor stairwell. (gap at bottom of door exceeds maximum gap of 3/4'' as per NFPA) 9 ; complete handrail extension minimum 12'' past stair nosing with returns as discussed with contractor. 10 ; provide minimum 1 1/2'' clearance from wall to interior of handrail at east stairs. 11 ; complete handrails at exterior steps 34''-38'' above stair hosing with 12'' extensions at top and bottom of steps on both sides of steps. 12 ; complete exterior grade to drain away from building as per code as discussed with contractor. 13 ; seal penetrations in exterior of building. 14 ; T.C.O. approved for 30 days from 1/17/2023 at 1st floor only.

Other/Miscellaneous
Resolved
02/21/2023
1 ; complete accessible parking signage min. 60'' above parking surface at accessible parking stalls. 2 ; complete accessible path not to exceed 2% side slope as discussed with contractor.

Comment Building Div Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Plumbing Final Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Cover Inspection/Thrust Blocks Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Hydrostatic Test 200Lbs 2Hrs VOID 02/21/2023
Shannon King ((253) 840-6684)
Emergency Radio Test Review Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
03/11/2022
received geo-tech approval & special inspection of rebar progressing with special inspection

Re-Roof Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
06/06/2022
1 ; complete nailing of straps as per City approved plans and provide special inspection approval.

Underfloor Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
06/07/2022
1 ; complete all rebar as per City Approved plans & install of holdowns with min. embed depth as per engineers correction approval letter as at grid line - (1-2,C.5-E) (A,2-5) (5,A-E) exterior walls only. 2 ;approved with special inspection approval.

Firewall/Firestop Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Shear Wall Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
08/31/2022
1. Rooms 112’ 113 will be caped in the wall for future use permits required Room 111 provide permits for eye washing station that is not on current city approved plans

Frame Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
10/03/2022
1. provide anchor bolts at wall between stairs

Energy (Insulation) Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
10/03/2022
1. complete insulation as discussed with contractor 2. provide nail plate at wall by stairs 3. seal penetration's at top plate next to stairs

Energy (Insulation) Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Frame Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Mechanical Final Inspection VOID 02/21/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
01/03/2023
1. ; provide balance report as discussed with contractor. 2 ; paint gas pipe on roof. 3 ; protect insulation on refrigeration line set from u.v. rays. 4 ; seal penetration in exterior of building at refrigeration line set. 5 ; complete install of ladder for roof to access.

Conditions

Condition Status Category
General Permit Conditions Open Standard Conditions
Development & Permitting Services
PERMIT CONDITIONS:
Engineering Commercial Standard Conditions Open Standard Conditions
Development & Permitting Services
* Prior to STARTING site work; request inspection for Erosion and Sediment ** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH E-XX-XXXX IS COMPLETED AND APPROVAL HAS BEEN PROVIDED ** * THE APPLICANT IS RESPONSIBLE TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. ATTACHED TO THE SITE PLAN IS A TYPICAL INFILTRATION SYSTEM YOU MAY CHOOSE TO FOLLOW. ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * Curb, gutter, sidewalk and approach must be poured per City Standards. * Driveway approach must be a minimum of 30' wide. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03. * All commercial developments, irrigation systems and multi family water service connections shall be protected by at reduced pressure backflow assembly (RPBA), as directed by the City, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District conforming to City Standard Details 03.04.02-1, 03.04.02-2 and 03.04.03. * A separate Right of Way Permit is required by a licensed and bonded contractor to make the sanitary sewer main tap. * Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. * Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per City Standards. * Property owner must install a private pump system per city standards to tie into existing force main. * All new or existing multi use and commercial facilities are required to install, at the service connection an approved reduced pressure backflow prevention assembly (RPBA), per City Standards. This property lies within a regulated Flood Zone. Both residential and non-residential must meet the following requirements in accordance with PMC 21.07: (For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums. (For A0 Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade). Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of openings shall be no higher than 1 foot above grade. (PMC 21.07.060(2)) If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. No fill shall be placed unless specifically shown on the approved site plan. After site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f) Steps shall be taken to prevent drainage onto adjacent lots. No occupancy permit shall be issued until such time as a Federal Emergency Management Agency Flood Elevation Certificate is completed based on "Finished Construction" and reviewed and accepted by the City of Puyallup. PERMIT CONDITIONS: 1 COMPLY WITH 2018 IFC AND 2018 IBC 2 TOTAL COVERAGE REQUIRED IN THE CITY OF PUYALLUP 3 EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 4 A SEPARATE PERMIT MAY BE REQUIRED IF FIRE ALARM OR SRPINKLER SYSTEM IS ALTERED 5 RTU'S WILL BE REQUIRED TO BE TESTED FOR SHUT DOWN. 6 FIRE EXTINGUISHERS REQUIRED PER CODE 7 ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right of way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on site prior to excavation.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
01/13/2022 B-21-0747 Stormwater Management PM. LLian 01/13/2022
01/28/2022 Plans b-21-0727 swr wtr wrksheet (Flattened)
01/28/2022 Plans b-21-0727 msb load calcs (Flattened)
01/28/2022 Plans b-21-0727 site plan (Flattened)
01/28/2022 Plans Site Plan-CCSPhaseIIIA-Rev01_Drawing-Site (Flattened)
01/28/2022 Plans b-21-0727 structural calcs (Flattened)
01/28/2022 Report Structural Calc-CCSPhaseIIIA-Rev01_Doc-StructuralCalc (Flattened)
01/28/2022 Report StructuralNote-CCSPhaseIIIA-Rev01_Doc-StructuralNote (Flattened)
01/28/2022 Other CCSPhaseIIIA-Rev01_Doc-Response Letter (Flattened)
01/28/2022 Form Energy Code Worksheets-CCSPhaseIIIARev01_Energy-Lighting (Flattened)
01/28/2022 Form Resbumittal Form-CCSPhaseIIIA-Rev01 (Flattened)
02/04/2022 Plans Construction Plan Set-CCS-PhaseIIIA_Drawing (Stamped)
02/04/2022 Plans Structural Plan-CCSPhaseIIIA-Rev01_Drawing (Stamped)
02/04/2022 Permit Permit - Detailed
02/04/2022 Letter Permit Job Card
02/10/2022 Report Inspection Report (Footing/Setback Inspection)
02/16/2022 Report Inspection Report (Foundation/Rebar Inspection)
02/16/2022 Report Inspection Report (Footing/Setback Inspection)
02/22/2022 Report Inspection Report (Plumbing Below Slab Inspection)
02/23/2022 Report Inspection Report (Plumbing Below Slab Inspection)
03/02/2022 Report Inspection Report (Underfloor Inspection)
03/09/2022 Report Inspection Report (Foundation/Rebar Inspection)
03/11/2022 Report Inspection Report (Energy (Insulation) Inspection)
03/11/2022 Report Inspection Report (Footing/Setback Inspection)
03/21/2022 Report Inspection Report (Foundation/Rebar Inspection)
03/22/2022 Report Inspection Report (Energy (Insulation) Inspection)
05/02/2022 Report Inspection Report (Underfloor Inspection)
06/06/2022 Report Inspection Report (Re-Roof Inspection)
06/07/2022 Report Inspection Report (Underfloor Inspection)
06/10/2022 Report Inspection Report (Energy (Insulation) Inspection)
06/10/2022 Report Inspection Report (Shear Wall Inspection)
06/13/2022 Report Inspection Report (Shear Wall Inspection)
06/15/2022 Report Inspection Report (Energy (Insulation) Inspection)
06/17/2022 Letter Permit Review Comment Notice
07/05/2022 Receipt Receipt for transaction:2022-001262
07/13/2022 Report Inspection Report (Gas Test Inspection)
07/26/2022 Report Inspection Report (Mechanical Rough In Inspection)
08/02/2022 Report Inspection Report (Plumbing Rough In Inspection)
08/10/2022 Letter Permit Review Comment Notice
08/19/2022 Receipt Receipt for transaction:2022-001639
08/22/2022 Form CCS Classrooms-Rev04_Doc-Application (Flattened)
08/22/2022 Form CCS Classrooms-Rev04_Doc-Response Letter (Flattened)
08/22/2022 Plans CCS Classrooms-Rev04_Drawing-Mech (Stamped)
08/22/2022 Plans CCS Classrooms-Rev04_Doc_TrussSealed (Stamped)
08/22/2022 Plans CCS Classrooms-Rev04_Drawing-Plumb (Stamped)
08/24/2022 Report Inspection Report (Frame Inspection)
08/25/2022 Report Inspection Report (Frame Inspection)
08/31/2022 Report Inspection Report (Frame Inspection)
09/06/2022 Report Inspection Report (Frame Inspection)
09/07/2022 Report Inspection Report (Energy (Insulation) Inspection)
09/08/2022 Report Inspection Report (Gas Test Inspection)
09/16/2022 Report Inspection Report (Wallboard / Drywall Inspection)
09/22/2022 Report Inspection Report (Frame Inspection)
09/23/2022 Report Inspection Report (Frame Inspection)
09/29/2022 Report Inspection Report (Energy (Insulation) Inspection)
10/03/2022 Report Inspection Report (Energy (Insulation) Inspection)
10/03/2022 Report Inspection Report (Frame Inspection)
10/04/2022 Report Inspection Report (Frame Inspection)
10/04/2022 Report Inspection Report (Energy (Insulation) Inspection)
10/05/2022 Report Inspection Report (Frame Inspection)
10/20/2022 Report Inspection Report (Wallboard / Drywall Inspection)
12/08/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
12/12/2022 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
12/20/2022 Report Inspection Report (Engineering Final Inspection)
12/20/2022 Report Inspection Report (Mechanical Final Inspection)
01/06/2023 Report Inspection Report (Engineering Final Inspection)
01/11/2023 Report Inspection Report (Engineering Final Inspection)
02/21/2023 Report Inspection Report (Building Final Inspection)
06/09/2023 Other Certificate of Occupancy


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.