Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Traffic Control Plan Review Fee | $40.00 | $40.00 | Paid | 02/17/2021 |
No
|
||||
Traffic Control Permit Fee | $50.00 | $50.00 | Paid | 02/17/2021 |
No
|
||||
Planning Landscape Review Fee | $300.00 | $300.00 | Paid | 02/17/2021 |
No
|
||||
Engineering Inspection Fee (3%) | $110,050.96 | $110,050.96 | Paid | 02/17/2021 |
No
|
||||
Engineering Permit Fee | $300.00 | $300.00 | Paid | 02/17/2021 |
No
|
||||
Civil Review Additional Fee | $3,770.00 | $3,770.00 | Paid | 02/17/2021 |
No
|
||||
Storm System Development Charge | $446,880.00 | $446,880.00 | Paid | 02/17/2021 |
No
|
||||
Record Drawing Review Fee | $200.00 | $200.00 | Paid | 04/08/2020 |
No
|
||||
Civil Review Fee | $470.00 | $470.00 | Paid | 04/08/2020 |
No
|
||||
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $562,060.96 | $562,060.96 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Engineering Daily Inspection | Passed w/ Conditions | 12/13/2021 | 12/13/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/14/2021 | 12/14/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/15/2021 | 12/15/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/15/2021 | 12/15/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/16/2021 | 12/16/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/20/2021 | 12/20/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/21/2021 | 12/21/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/22/2021 | 12/22/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/23/2021 | 12/23/2021 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/4/2022 | 01/05/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/7/2022 | 01/07/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/10/2022 | 01/12/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/11/2022 | 01/12/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/12/2022 | 01/13/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/13/2022 | 01/14/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/14/2022 | 01/17/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/18/2022 | 01/19/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/21/2022 | 01/21/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/24/2022 | 01/25/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/25/2022 | 01/25/2022 | |
Jason Little ((253) 244-0387) | ||||
Other/Miscellaneous
Carried Forward
01/25/2022
replace the TWLT arrows with the proper ones and hydroblast the existing lines and arrows.
|
||||
Engineering Daily Inspection | Partial Pass | 1/26/2022 | 01/26/2022 | |
Robyn Buck ((253) 435-3617) | ||||
Other/Miscellaneous
Carried Forward
01/26/2022
replace the TWLT arrows with the proper ones and hydroblast the existing lines and arrows.
|
||||
Engineering Daily Inspection | Partial Pass | 1/27/2022 | 01/28/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Other/Miscellaneous
Carried Forward
01/28/2022
replace the TWLT arrows with the proper ones and hydroblast the existing lines and arrows.
|
||||
Engineering Daily Inspection | Partial Pass | 1/28/2022 | 01/31/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/1/2022 | 02/01/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/2/2022 | 02/03/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/3/2022 | 02/04/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/4/2022 | 02/04/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/9/2022 | 02/10/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/21/2022 | 02/21/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/22/2022 | 02/22/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | VOID | 2/22/2022 | 02/22/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/24/2022 | 02/25/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 3/2/2022 | 03/03/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 3/3/2022 | 03/04/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 3/4/2022 | 03/07/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 3/8/2022 | 03/09/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 3/9/2022 | 03/10/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Final Inspection | Not Ready | 3/10/2022 | 3/10/2022 | 03/11/2022 |
Jeff Hill ((253) 204-5633) | ||||
Other/Miscellaneous
Carried Forward
03/11/2022
|
||||
Engineering Punchlist Inspection | Failed | 03/11/2022 | ||
Jamie Carter ((253) 435-3616) | ||||
Other/Miscellaneous
Resolved
03/14/2022
SECTION A. SANITARY SEWER. Provide the City with a letter from the design engineer certifying that the installation of the grease interceptor or oil / water separator was performed in accordance with all regulations and the approved plans.
|
||||
Other/Miscellaneous
Resolved
03/14/2022
SECTION A. STORM. Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
|
||||
Other/Miscellaneous
Resolved
03/14/2022
SECTION A. MISC. Overtime inspection fees must be paid.
|
||||
Other/Miscellaneous
Resolved
03/14/2022
SECTION A. MISC. Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection. Landscape requirements to be added to the punchlist.
|
||||
Other/Miscellaneous
Resolved
03/16/2022
SECTION B. STORM. Change SDCO lids from irrigation to C.O. (clean out) on numbers 2,5,9,10./ 2,9,10 complete 3/15
|
||||
Other/Miscellaneous
Resolved
03/16/2022
SECTION B. STORM. Locate and install casting on SDCO numbers 1,3,4./ #1 complete 3/15
|
||||
Other/Miscellaneous
Resolved
03/16/2022
SECTION B. STORM. Clean off concrete so the clean out is accessible from SDCO numbers 8,12,15,16. castings are cleaned off ./ #16 was cut by a saw replace casting lid and lock bolts.
|
||||
Other/Miscellaneous
Resolved
03/18/2022
SECTION B. STORM. Fix MOD wetland vault lid to manufacturers recommendations.
|
||||
Other/Miscellaneous
Resolved
03/15/2022
SECTION B. STREET. Complete all required street monumentation.
|
||||
Other/Miscellaneous
Resolved
03/15/2022
SECTION B. STREET. Developer/contractor shall be responsible to secure all street-lighting j-boxes by placing an ecology block temporarily over the top of the boxes until such time as the sidewalks adjacent to the j-boxes are poured and the boxes are incorporated into the permanent concrete sidewalks. (Alternate: Developer/contractor shall be responsible to secure all street-lighting j-boxes from vandalism and theft until such time that the street lighting is accepted and under operation by the City. J-boxes shall be secured by placing an ecology block temporarily over the top of the boxes, tack welding the lids, or other means which will not permanently damage the j-boxes. Upon request of the City, temporary protection measures shall be removed and the j-boxes restored, as necessary, to their original installed condition.)
|
||||
Other/Miscellaneous
Resolved
04/26/2022
SECTION B. MISC. Provide the City with an electronic version of the record drawings in the following formats:
• AutoCAD Map 2007 or newer in State Plane South Projection
• PDF
|
||||
Other/Miscellaneous
Resolved
05/10/2022
SECTION B. MISC. Provide the City with data for all new infrastructure installed for this project. This data is to be provided by the design engineer. Form is available on the City's website or from the review engineer.
|
||||
Other/Miscellaneous
Resolved
05/10/2022
SECTION B. MISC. Submit an operation and maintenance manual that is consistent with the provisions in Volume V of the Stormwater Management Manual for Western Washington (2012) for all stormwater facilities and BMPs associated with this project. A copy of this operation and maintenance manual shall be retained onsite or within reasonable access to the site and shall be transferred with the property to the new owner.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described previously as a recorded exhibit.
|
||||
Other/Miscellaneous
Resolved
03/15/2022
SECTION B. MISC. Provide the City with the required deeds/easements, if applicable, for the infrastructure proposed to be public.
|
||||
Other/Miscellaneous
Resolved
03/16/2022
SECTION B. MISC. General site clean up.
|
||||
Other/Miscellaneous
Resolved
03/18/2022
SECTION B. MISC. Replace cracked trailer dolly pad 7 stalls in from the west.
|
||||
Engineering Punchlist Inspection | VOID | 3/9/2022 | 03/14/2022 | |
Jamie Carter ((253) 435-3616) | ||||
Other/Miscellaneous
Resolved
03/11/2022
SECTION A. SANITARY SEWER. Provide the City with a letter from the design engineer certifying that the installation of the grease interceptor or oil / water separator was performed in accordance with all regulations and the approved plans.
|
||||
Other/Miscellaneous
Resolved
03/11/2022
SECTION A. STORM. Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION A. MISC. Overtime inspection fees must be paid.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION A. MISC. Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection. Landscape requirements to be added to the punchlist.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STORM. Change SDCO lids from irrigation to C.O. (clean out) on numbers 2,5,9,10.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STORM. Locate and install casting on SDCO numbers 1,3,4.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STORM. Clean off concrete so the clean out is accessible from SDCO numbers 8,12,15,16.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STORM. Fix MOD wetland vault lid to manufacturers recommendations.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STREET. Complete all required street monumentation.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STREET. Developer/contractor shall be responsible to secure all street-lighting j-boxes by placing an ecology block temporarily over the top of the boxes until such time as the sidewalks adjacent to the j-boxes are poured and the boxes are incorporated into the permanent concrete sidewalks. (Alternate: Developer/contractor shall be responsible to secure all street-lighting j-boxes from vandalism and theft until such time that the street lighting is accepted and under operation by the City. J-boxes shall be secured by placing an ecology block temporarily over the top of the boxes, tack welding the lids, or other means which will not permanently damage the j-boxes. Upon request of the City, temporary protection measures shall be removed and the j-boxes restored, as necessary, to their original installed condition.)
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Provide the City with an electronic version of the record drawings in the following formats:
• AutoCAD Map 2007 or newer in State Plane South Projection
• PDF
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Provide the City with data for all new infrastructure installed for this project. This data is to be provided by the design engineer. Form is available on the City's website or from the review engineer.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Submit an operation and maintenance manual that is consistent with the provisions in Volume V of the Stormwater Management Manual for Western Washington (2012) for all stormwater facilities and BMPs associated with this project. A copy of this operation and maintenance manual shall be retained onsite or within reasonable access to the site and shall be transferred with the property to the new owner.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described previously as a recorded exhibit.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Provide the City with the required deeds/easements, if applicable, for the infrastructure proposed to be public.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. General site clean up.
|
||||
Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Replace cracked trailer dolly pad 7 stalls in from the east.
|
||||
Engineering Daily Inspection | Partial Pass | 1/12/2023 | 01/12/2023 | |
Jeff Hill ((253) 204-5633) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Civil Standard Conditions | Resolved | Engineering Division | Standard Conditions | ||
:
1. Construction permitted as per approved civil plans.
2. Construction permit shall expire by limitation and be declared void if:
* Work is not started within 180 days of obtaining the permit
* Work is abondoned for 180 days or more after beginning work
* After two years from the date of permit issuance, regardless of whether work is finished
3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review.
5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
|
|||||
Pipeline Notfication Rcw 19.122.033 | Resolved | Engineering Division | Standard Conditions | ||
:
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
|
|||||
Miscellaneous Condition | Resolved | Development & Permitting Services | Sewer Punchlist Section A | ||
:
|
|||||
Stormwater Maintenance Agreement (SWA) | Resolved | Engineering Division | Storm Punchlist Section B | ||
:
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
|
|||||
Punchlist: Provide a Construction Completion Report [if project extends a water main] | Resolved | Development & Permitting Services | Water Punchlist Section A | ||
:
[If the project included a water main extension in Puyallup’s service area]: Construction Completion Report for Distribution Main Projects signed and sealed by a licensed engineer per WAC 246-290-120(5).
|
|||||
Punchlist: Developer/Contractor to secure all street-lighting J-boxes | Resolved | Development & Permitting Services | Street Punchlist Section B | ||
:
Developer/contractor shall be responsible to secure all street-lighting j-boxes by placing an ecology block temporarily over the top of the boxes until such time as the sidewalks adjacent to the j-boxes are poured and the boxes are incorporated into the permanent concrete sidewalks. (Alternate: Developer/contractor shall be responsible to secure all street-lighting j-boxes from vandalism and theft until such time that the street lighting is accepted and under operation by the City. J-boxes shall be secured by placing an ecology block temporarily over the top of the boxes, tack welding the lids, or other means which will not permanently damage the j-boxes. Upon request of the City, temporary protection measures shall be removed and the j-boxes restored, as necessary, to their original installed condition.)
|
|||||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Engineering Division | Storm Punchlist Section A | ||
:
clean parking lot and remove all BMP's.
|
|||||
Punchlist: Miscellaneous Streets A Item | Resolved | Engineering Division | Street Punchlist Section A | ||
:
paint fire lane curb on the east side of the building
|
|||||
Punchlist: Provide the City with an electronic version of the record drawings | Resolved | Engineering Division | Misc. Punchlist Section B | ||
:
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
|
There are no related items for this engineering permit application.
Date Uploaded | File Type | Name |
---|---|---|
03/17/2022 | Agreement | E-20-0137 AoF Record Drawings |
05/05/2022 | Report | 20705-M-New Infrastructure Calculation-2022-04-07 |
05/10/2022 | Plans | E-20-0137 RECORD DRAWINGS |
08/03/2022 | Plans | e=20-0137 pcr 007- Stairs and parking lot_not approved(Flattened) |
08/03/2022 | Letter | Permit Review Comment Notice |
10/11/2022 | Agreement | E-20-0137 SWA RECORDED |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.