CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

E-20-0137


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-20-0137
Civil Construction Permit
Closed
CH REALTY IX-JV I PUYALLUP LOGISTICS L P
Not Applicable
CIVILS ~ PUYALLUP CORPORATE CENTER
04/07/2020
02/17/2021
10/16/2023
04/19/2023

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Traffic Control Plan Review Approved 07/03/2022 08/03/2022
Engineering Review Failed 07/03/2022 06/27/2022
Engineering Civil Review Approved 04/07/2020 02/05/2021
Planning Review Approved 01/25/2021
Engineering Traffic Review Approved 01/22/2021
Public Works Water Review Approved 01/06/2021
Planning Review Approved 12/21/2020
Fire Review Approved 12/15/2020
Public Works Collection Review Approved 12/15/2020
Public Works Water Review Approved 12/02/2020
Engineering Traffic Review Approved 10/30/2020
Planning Review Approved 10/28/2020
Fire Review Approved 10/26/2020
Public Works Collection Review Approved 10/06/2020
Public Works Water Review Approved 10/02/2020
Engineering Traffic Review Approved 04/07/2020 05/28/2020
Fire Review Approved 04/07/2020 05/22/2020
Planning Review Approved 04/07/2020 05/21/2020
Public Works Water Review Approved 04/07/2020 04/21/2020
Public Works Collection Review Approved 04/07/2020 04/20/2020

Fees

Paid Fees Amount Paid Owing Date Paid
Traffic Control Plan Review Fee $40.00 $40.00 Paid 02/17/2021
No
Traffic Control Permit Fee $50.00 $50.00 Paid 02/17/2021
No
Planning Landscape Review Fee $300.00 $300.00 Paid 02/17/2021
No
Engineering Inspection Fee (3%) $110,050.96 $110,050.96 Paid 02/17/2021
No
Engineering Permit Fee $300.00 $300.00 Paid 02/17/2021
No
Civil Review Additional Fee $3,770.00 $3,770.00 Paid 02/17/2021
No
Storm System Development Charge $446,880.00 $446,880.00 Paid 02/17/2021
No
Record Drawing Review Fee $200.00 $200.00 Paid 04/08/2020
No
Civil Review Fee $470.00 $470.00 Paid 04/08/2020
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Daily Inspection Passed w/ Conditions 12/13/2021 12/13/2021
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 12/14/2021 12/14/2021
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 12/15/2021 12/15/2021
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 12/15/2021 12/15/2021
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 12/16/2021 12/16/2021
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 12/20/2021 12/20/2021
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 12/21/2021 12/21/2021
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 12/22/2021 12/22/2021
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 12/23/2021 12/23/2021
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/4/2022 01/05/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/7/2022 01/07/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/10/2022 01/12/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/11/2022 01/12/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/12/2022 01/13/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/13/2022 01/14/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/14/2022 01/17/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/18/2022 01/19/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/21/2022 01/21/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/24/2022 01/25/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/25/2022 01/25/2022
Jason Little ((253) 435-3636)
Other/Miscellaneous
Carried Forward
01/25/2022
replace the TWLT arrows with the proper ones and hydroblast the existing lines and arrows.

Engineering Daily Inspection Partial Pass 1/26/2022 01/26/2022
Robyn Buck ((253) 435-3617)
Other/Miscellaneous
Carried Forward
01/26/2022
replace the TWLT arrows with the proper ones and hydroblast the existing lines and arrows.

Engineering Daily Inspection Partial Pass 1/27/2022 01/28/2022
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
01/28/2022
replace the TWLT arrows with the proper ones and hydroblast the existing lines and arrows.

Engineering Daily Inspection Partial Pass 1/28/2022 01/31/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/1/2022 02/01/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/2/2022 02/03/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/3/2022 02/04/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/4/2022 02/04/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/9/2022 02/10/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/21/2022 02/21/2022
Jason Little ((253) 435-3636)
Engineering Daily Inspection Partial Pass 2/22/2022 02/22/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection VOID 2/22/2022 02/22/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/24/2022 02/25/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/2/2022 03/03/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/3/2022 03/04/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/4/2022 03/07/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/8/2022 03/09/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/9/2022 03/10/2022
Jeff Hill ((253) 841-5424)
Engineering Final Inspection Not Ready 3/10/2022 3/10/2022 03/11/2022
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
03/11/2022

Engineering Punchlist Inspection Failed 03/11/2022
Jamie Carter ((253) 435-3616)
Other/Miscellaneous
Resolved
03/14/2022
SECTION A. SANITARY SEWER. Provide the City with a letter from the design engineer certifying that the installation of the grease interceptor or oil / water separator was performed in accordance with all regulations and the approved plans.

Other/Miscellaneous
Resolved
03/14/2022
SECTION A. STORM. Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.

Other/Miscellaneous
Resolved
03/14/2022
SECTION A. MISC. Overtime inspection fees must be paid.

Other/Miscellaneous
Resolved
03/14/2022
SECTION A. MISC. Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection. Landscape requirements to be added to the punchlist.

Other/Miscellaneous
Resolved
03/16/2022
SECTION B. STORM. Change SDCO lids from irrigation to C.O. (clean out) on numbers 2,5,9,10./ 2,9,10 complete 3/15

Other/Miscellaneous
Resolved
03/16/2022
SECTION B. STORM. Locate and install casting on SDCO numbers 1,3,4./ #1 complete 3/15

Other/Miscellaneous
Resolved
03/16/2022
SECTION B. STORM. Clean off concrete so the clean out is accessible from SDCO numbers 8,12,15,16. castings are cleaned off ./ #16 was cut by a saw replace casting lid and lock bolts.

Other/Miscellaneous
Resolved
03/18/2022
SECTION B. STORM. Fix MOD wetland vault lid to manufacturers recommendations.

Other/Miscellaneous
Resolved
03/15/2022
SECTION B. STREET. Complete all required street monumentation.

Other/Miscellaneous
Resolved
03/15/2022
SECTION B. STREET. Developer/contractor shall be responsible to secure all street-lighting j-boxes by placing an ecology block temporarily over the top of the boxes until such time as the sidewalks adjacent to the j-boxes are poured and the boxes are incorporated into the permanent concrete sidewalks. (Alternate: Developer/contractor shall be responsible to secure all street-lighting j-boxes from vandalism and theft until such time that the street lighting is accepted and under operation by the City. J-boxes shall be secured by placing an ecology block temporarily over the top of the boxes, tack welding the lids, or other means which will not permanently damage the j-boxes. Upon request of the City, temporary protection measures shall be removed and the j-boxes restored, as necessary, to their original installed condition.)

Other/Miscellaneous
Resolved
04/26/2022
SECTION B. MISC. Provide the City with an electronic version of the record drawings in the following formats: • AutoCAD Map 2007 or newer in State Plane South Projection • PDF

Other/Miscellaneous
Resolved
05/10/2022
SECTION B. MISC. Provide the City with data for all new infrastructure installed for this project. This data is to be provided by the design engineer. Form is available on the City's website or from the review engineer.

Other/Miscellaneous
Resolved
05/10/2022
SECTION B. MISC. Submit an operation and maintenance manual that is consistent with the provisions in Volume V of the Stormwater Management Manual for Western Washington (2012) for all stormwater facilities and BMPs associated with this project. A copy of this operation and maintenance manual shall be retained onsite or within reasonable access to the site and shall be transferred with the property to the new owner.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described previously as a recorded exhibit.

Other/Miscellaneous
Resolved
03/15/2022
SECTION B. MISC. Provide the City with the required deeds/easements, if applicable, for the infrastructure proposed to be public.

Other/Miscellaneous
Resolved
03/16/2022
SECTION B. MISC. General site clean up.

Other/Miscellaneous
Resolved
03/18/2022
SECTION B. MISC. Replace cracked trailer dolly pad 7 stalls in from the west.

Engineering Punchlist Inspection VOID 3/9/2022 03/14/2022
Jamie Carter ((253) 435-3616)
Other/Miscellaneous
Resolved
03/11/2022
SECTION A. SANITARY SEWER. Provide the City with a letter from the design engineer certifying that the installation of the grease interceptor or oil / water separator was performed in accordance with all regulations and the approved plans.

Other/Miscellaneous
Resolved
03/11/2022
SECTION A. STORM. Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION A. MISC. Overtime inspection fees must be paid.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION A. MISC. Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection. Landscape requirements to be added to the punchlist.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STORM. Change SDCO lids from irrigation to C.O. (clean out) on numbers 2,5,9,10.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STORM. Locate and install casting on SDCO numbers 1,3,4.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STORM. Clean off concrete so the clean out is accessible from SDCO numbers 8,12,15,16.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STORM. Fix MOD wetland vault lid to manufacturers recommendations.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STREET. Complete all required street monumentation.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. STREET. Developer/contractor shall be responsible to secure all street-lighting j-boxes by placing an ecology block temporarily over the top of the boxes until such time as the sidewalks adjacent to the j-boxes are poured and the boxes are incorporated into the permanent concrete sidewalks. (Alternate: Developer/contractor shall be responsible to secure all street-lighting j-boxes from vandalism and theft until such time that the street lighting is accepted and under operation by the City. J-boxes shall be secured by placing an ecology block temporarily over the top of the boxes, tack welding the lids, or other means which will not permanently damage the j-boxes. Upon request of the City, temporary protection measures shall be removed and the j-boxes restored, as necessary, to their original installed condition.)

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Provide the City with an electronic version of the record drawings in the following formats: • AutoCAD Map 2007 or newer in State Plane South Projection • PDF

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Provide the City with data for all new infrastructure installed for this project. This data is to be provided by the design engineer. Form is available on the City's website or from the review engineer.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Submit an operation and maintenance manual that is consistent with the provisions in Volume V of the Stormwater Management Manual for Western Washington (2012) for all stormwater facilities and BMPs associated with this project. A copy of this operation and maintenance manual shall be retained onsite or within reasonable access to the site and shall be transferred with the property to the new owner.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described previously as a recorded exhibit.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Provide the City with the required deeds/easements, if applicable, for the infrastructure proposed to be public.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. General site clean up.

Other/Miscellaneous
Carried Forward
03/11/2022
SECTION B. MISC. Replace cracked trailer dolly pad 7 stalls in from the east.

Engineering Daily Inspection Partial Pass 1/12/2023 01/12/2023
Jeff Hill ((253) 841-5424)

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Resolved Engineering Division Standard Conditions
: 1. Construction permitted as per approved civil plans. 2. Construction permit shall expire by limitation and be declared void if: * Work is not started within 180 days of obtaining the permit * Work is abondoned for 180 days or more after beginning work * After two years from the date of permit issuance, regardless of whether work is finished 3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Miscellaneous Condition Resolved Development & Permitting Services Sewer Punchlist Section A
:
Stormwater Maintenance Agreement (SWA) Resolved Engineering Division Storm Punchlist Section B
: The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
Punchlist: Provide a Construction Completion Report [if project extends a water main] Resolved Development & Permitting Services Water Punchlist Section A
: [If the project included a water main extension in Puyallup’s service area]: Construction Completion Report for Distribution Main Projects signed and sealed by a licensed engineer per WAC 246-290-120(5).
Punchlist: Developer/Contractor to secure all street-lighting J-boxes Resolved Development & Permitting Services Street Punchlist Section B
: Developer/contractor shall be responsible to secure all street-lighting j-boxes by placing an ecology block temporarily over the top of the boxes until such time as the sidewalks adjacent to the j-boxes are poured and the boxes are incorporated into the permanent concrete sidewalks. (Alternate: Developer/contractor shall be responsible to secure all street-lighting j-boxes from vandalism and theft until such time that the street lighting is accepted and under operation by the City. J-boxes shall be secured by placing an ecology block temporarily over the top of the boxes, tack welding the lids, or other means which will not permanently damage the j-boxes. Upon request of the City, temporary protection measures shall be removed and the j-boxes restored, as necessary, to their original installed condition.)
Punchlist: Miscellaneous Stormwater A Item Resolved Engineering Division Storm Punchlist Section A
: clean parking lot and remove all BMP's.
Punchlist: Miscellaneous Streets A Item Resolved Engineering Division Street Punchlist Section A
: paint fire lane curb on the east side of the building
Punchlist: Provide the City with an electronic version of the record drawings Resolved Engineering Division Misc. Punchlist Section B
: Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
03/17/2022 Agreement E-20-0137 AoF Record Drawings
05/05/2022 Report 20705-M-New Infrastructure Calculation-2022-04-07
05/10/2022 Plans E-20-0137 RECORD DRAWINGS
08/03/2022 Plans e=20-0137 pcr 007- Stairs and parking lot_not approved(Flattened)
08/03/2022 Letter Permit Review Comment Notice
10/11/2022 Agreement E-20-0137 SWA RECORDED


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.