CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

PRCCP20220092


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCCP20220092
Civil Construction Permit
Closed
LARSON FAMILY PARTNERSHIP
Addition
Construct underground utilities, storm drainage, replacements of concrete curb, gutter, sidewalk, re-align driveway, replace driveways. Remove & replace asphalt paving.
01/21/2022
07/29/2022
07/29/2024
04/30/2024

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Civil Review Approved 07/25/2022 07/25/2022
Fire Review Approved 07/25/2022 07/25/2022
Public Works Water Review Approved 07/25/2022 07/25/2022
Engineering Traffic Review Approved 08/10/2022 07/21/2022
Planning Review VOID 08/10/2022 07/21/2022
Public Works Streets Review VOID 08/10/2022 07/21/2022
Public Works Collection Review VOID 08/10/2022 07/21/2022
Engineering Traffic Review Failed 07/11/2022 07/18/2022
Engineering Civil Review Approved 07/11/2022 07/13/2022
Fire Review Approved 07/11/2022 07/08/2022
Public Works Collection Review Approved 07/11/2022 06/30/2022
Public Works Streets Review VOID 07/11/2022 06/24/2022
Planning Review Approved 07/11/2022 06/23/2022
Public Works Water Review Failed 07/11/2022 06/23/2022
Engineering Traffic Review Failed 05/25/2022 06/10/2022
Engineering Civil Review Failed 05/25/2022 06/10/2022
Public Works Collection Review Failed 05/25/2022 06/03/2022
Public Works Streets Review VOID 05/25/2022 05/24/2022
Planning Review Failed 05/25/2022 05/20/2022
Fire Review Failed 05/25/2022 05/17/2022
Public Works Water Review Failed 05/25/2022 05/17/2022
Engineering Civil Review Failed 03/19/2022 03/31/2022
Public Works Streets Review Failed 03/19/2022 03/31/2022
Engineering Traffic Review Failed 03/19/2022 03/31/2022
Public Works Water Review Failed 03/19/2022 03/17/2022
Public Works Collection Review Failed 03/19/2022 03/17/2022
Fire Review Failed 03/19/2022 03/14/2022
Planning Review Failed 03/19/2022 02/17/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Engineering Inspection Fee (3%) $13,702.93 $13,702.93 Paid 07/29/2022
Civil Review Fee (Oil/Water, Grease Interceptor, or Water-Sewer-Storm) $360.00 $360.00 Paid 02/02/2022
Engineering Permit Fee $300.00 $300.00 Paid 07/29/2022
Traffic Control Permit Fee $50.00 $50.00 Paid 02/02/2022
Traffic Control Plan Review Fee $40.00 $40.00 Paid 02/02/2022
Civil Review Fee $470.00 $470.00 Paid 02/02/2022
Record Drawing Review Fee $200.00 $200.00 Paid 02/02/2022
Civil Review Additional Fee $650.00 $650.00 Paid 07/29/2022
Miscellaneous Fee $229.50 $229.50 Paid 06/28/2023
$180.00
Miscellaneous Fee $207.50 $207.50 Paid 04/26/2024
$180.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Daily Inspection Partial Pass 8/3/2022 08/04/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 8/4/2022 08/04/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 8/5/2022 08/05/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 8/12/2022 08/12/2022
Michael Rosenau ((253) 841-5411)
Engineering Daily Inspection Partial Pass 9/1/2022 09/01/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 9/8/2022 09/08/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 10/10/2022 10/10/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 10/13/2022 10/13/2022
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 1/17/2023 01/17/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/13/2023 02/13/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/14/2023 02/14/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/15/2023 02/15/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/16/2023 02/16/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 2/17/2023 02/17/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/1/2023 03/01/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/21/2023 03/21/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/22/2023 03/22/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/27/2023 03/27/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/28/2023 03/28/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/30/2023 03/31/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 3/31/2023 03/31/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 4/3/2023 04/03/2023
Michael Rosenau ((253) 841-5411)
Engineering Daily Inspection Partial Pass 4/4/2023 04/05/2023
Michael Rosenau ((253) 841-5411)
Engineering Daily Inspection Partial Pass 4/5/2023 04/05/2023
Michael Rosenau ((253) 841-5411)
Engineering Daily Inspection Partial Pass 4/6/2023 04/06/2023
Michael Rosenau ((253) 841-5411)
Engineering Daily Inspection Partial Pass 4/7/2023 04/07/2023
Michael Rosenau ((253) 841-5411)
Engineering Daily Inspection Partial Pass 4/12/2023 04/12/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Failed 4/14/2023 04/14/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
04/14/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Failed 4/17/2023 04/17/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
04/17/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 4/18/2023 04/18/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
04/18/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 4/20/2023 04/20/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
04/20/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/1/2023 05/01/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/01/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/2/2023 05/02/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/08/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/3/2023 05/03/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/08/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/4/2023 05/04/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/08/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/9/2023 05/09/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/09/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/15/2023 05/15/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/15/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/16/2023 05/16/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/16/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/17/2023 05/18/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/18/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/18/2023 05/19/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/19/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/19/2023 05/19/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/19/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/22/2023 05/24/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/24/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 05/30/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
05/30/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 5/31/2023 06/01/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
06/01/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 6/1/2023 06/02/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
06/02/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 6/5/2023 06/05/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
06/05/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 6/6/2023 06/06/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
06/06/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 6/7/2023 06/07/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
06/07/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 6/12/2023 06/12/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
06/12/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 6/14/2023 06/15/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
06/15/2023
foundation concrete must come from a certified batch plant.

Engineering Daily Inspection Partial Pass 6/16/2023 06/20/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
06/20/2023
foundation concrete must come from a certified batch plant.

Engineering Punchlist Inspection Not Ready 6/21/2023 6/21/2023 06/21/2023
Jeff Hill ((253) 841-5424)
Engineering Final Inspection Not Ready 6/22/2023 6/22/2023 06/22/2023
Jeff Hill ((253) 841-5424)
Engineering Daily Inspection Partial Pass 6/23/2023 06/23/2023
Jeff Hill ((253) 841-5424)
Other/Miscellaneous
Carried Forward
06/23/2023
foundation concrete must come from a certified batch plant.

Engineering Punchlist Inspection Partial Pass 11/7/2023 11/07/2023
Jeff Hill ((253) 841-5424)

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Resolved Standard Conditions
: 1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. 2. Construction permitted as per approved civil plans. 3. Construction permit shall expire by limitation and be declared void if: * Work is not started within 180 days of obtaining the permit * Work is abandoned for 180 days or more after beginning work * After two years from the date of permit issuance, regardless of whether work is finished 4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority. 8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval. 9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits. 10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Certificate of Insurance/CG2012 Resolved Engineering Division Prior to Issuance
: Certificate or Insurance/CG2012 must be received prior to issuance
Engineering Cost Breakdown Fee Calculation Resolved Engineering Division Prior to Issuance
: Engineering Cost Breakdown Fee Calculation must be received for Reviewer to verify valuation for fee calculations
Letter of Authorization to Apply Permit Resolved Engineering Division Prior to Issuance
: Letter of Authorization to Apply for Permit must be received prior to issuance
Right-of-Way Occupation Bond Resolved Engineering Division Prior to Issuance
: Street Obstruction Bond must be received prior to issuance
Fire Review Conditions Resolved Development & Permitting Services Standard Conditions
: Item #2 still does not meet section 312. This item will be looked at along with vegetation at time of Final. This may or may not be a requirement. Any questions refer to engineering standards for a fire hydrant page 17. Bollards will be needed around the existing fire hydrant. Item moved to B list on the punchlist.
Pre-Construction Meeting Resolved Engineering Division Standard Conditions 07/27/2022
: Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
Overtime Inspection and Watermain Shutdown Fee Resolved Engineering Division Prior to Issuance
: This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
Punchlist: Developer/Contractor to secure all street-lighting J-boxes Resolved Development & Permitting Services Street Punchlist Section B
: Developer/contractor shall be responsible to secure all street-lighting j-boxes by placing an ecology block temporarily over the top of the boxes until such time as the sidewalks adjacent to the j-boxes are poured and the boxes are incorporated into the permanent concrete sidewalks. (Alternate: Developer/contractor shall be responsible to secure all street-lighting j-boxes from vandalism and theft until such time that the street lighting is accepted and under operation by the City. J-boxes shall be secured by placing an ecology block temporarily over the top of the boxes, tack welding the lids, or other means which will not permanently damage the j-boxes. Upon request of the City, temporary protection measures shall be removed and the j-boxes restored, as necessary, to their original installed condition.)
Punchlist: Provide DCVA Test Results Resolved Development & Permitting Services Water Punchlist Section A
: Provide the City with the test results for the irrigation Double Check Valve Assembly (DCVA).
Punchlist: Provide RPBA Test Results Resolved Development & Permitting Services Water Punchlist Section A
: Provide the City with the test results for the Reduced Pressure Backflow Assembly (RPBA).
Punchlist: Miscellaneous A Item Resolved Development & Permitting Services Misc. Punchlist Section A
: Install a locking storks fitting on the FDC
Punchlist: Miscellaneous A Item Resolved Development & Permitting Services Misc. Punchlist Section A
: Tamper switch test
Punchlist: Miscellaneous B Item Resolved Development & Permitting Services Misc. Punchlist Section B
: Raise the existing fire hydrant at the 4th st entrance. Install bollards on the north side of hydrant per city standard 03.05.01 This is due to a possible strike hazard. see condition #6
Punchlist: Miscellaneous Stormwater A Item Resolved Development & Permitting Services Storm Punchlist Section A
: final cleaning of 4th st nw, River road, and the parking lot. Then remove all BMP's and clean out the catch basins.
Punchlist: Miscellaneous Stormwater A Item Resolved Development & Permitting Services Storm Punchlist Section A
: replace cobbles at all penetrations through the extruded curb. see note 11 on page C4.0
Punchlist: Miscellaneous B Item Resolved Engineering Division Misc. Punchlist Section B
: paint bollards around the power transformer.
Punchlist: Miscellaneous Streets A Item Resolved Engineering Division Street Punchlist Section A
: once the power has been connected and meter installed for the street lights call for a final inspection of the street lights.
Miscellaneous Condition Resolved Development & Permitting Services Prior to Occupancy
: MUST PAY PIERCE COUNTY RECORDING FEE PRIOR TO OCCUPANCY
Miscellaneous Condition Resolved Development & Permitting Services Prior to Completion
: MUST PAY PC RECORDING FEE FOR THE EASEMENT

Related Permit & Planning Applications

Reference Number Status Type
PRCA20220091 Finaled Commercial - Addition
PRDE20220927 Closed Demolition
PRFA20220979 Closed Fire Alarms
PRFS20221051 Closed Fire Sprinklers
PRSG20221792 Closed Sign/Awning

Documents & Images

Date Uploaded File Type Name
04/01/2022 Report 2021-11-18 CSWPPP (Flattened)
04/01/2022 Report 2022-01-19 Drainage Report - Larson Automotive (Flattened)
04/01/2022 Report LarsonAutomotive_LarsonJeep_RG_final (Flattened)
04/01/2022 Plans Larson Jeep River Road Landscape and Irrigation Plans (Flattened)
04/01/2022 Plans LARSON JEEP 300 BLDG RENOV 22-0120 Site Plan (Flattened)
04/01/2022 Form Civil Const App UPDATED (Flattened)
01/27/2022 Letter Incomplete Application Notice
04/01/2022 Plans 2022-01-19 Civil Plans 300 Building - C2_1 TESCP (Flattened)
04/01/2022 Plans Larson Jeep - Puyallup Scoping 5-20-21 (Flattened)
02/02/2022 Receipt Receipt for transaction:2022-000188
04/01/2022 Letter Permit Review Comment Notice
06/10/2022 Other 2022-05-02 Comment Response Memo Revision 3 (Flattened)
06/10/2022 Report 2022-05-02 Drainage Report - Larson Automotive1 (Flattened)
06/10/2022 Letter Permit Review Comment Notice
07/18/2022 Other Larson Jeep Comment Response 2022-06-19 (Flattened)
07/18/2022 Form Larson-Resubmittal Form-civil1 (Flattened)
07/18/2022 Letter Permit Review Comment Notice
07/25/2022 Plans 2022-07-19 Revision 4 Civil-LA-ES Plans 300 River Road-Larson (Stamped)
07/29/2022 Letter Permit - Detailed
07/29/2022 Receipt Receipt for transaction:2022-001463
08/01/2022 Pre-con for 20220092 Larson-20220727_083748-Meeting Recording
08/08/2022 Plans APPROVED TCP Larson Jeep
10/13/2022 Report Inspection Report (Engineering Daily Inspection)
02/17/2023 Report Inspection Report (Engineering Daily Inspection)
03/21/2023 Report Inspection Report (Engineering Daily Inspection)
03/21/2023 Report Inspection Report (Engineering Daily Inspection)
03/21/2023 Report Inspection Report (Engineering Daily Inspection)
03/22/2023 Report Inspection Report (Engineering Daily Inspection)
03/27/2023 Report Inspection Report (Engineering Daily Inspection)
03/28/2023 Report Inspection Report (Engineering Daily Inspection)
04/14/2023 Report Inspection Report (Engineering Daily Inspection)
06/22/2023 Letter Inspection Punchlist
06/27/2023 Report Inspection Report (Engineering Daily Inspection)
06/27/2023 Letter Inspection Punchlist
06/27/2023 Plans 2023-06-20 Civil Record Dwgs - 300 River Road-Larson-flattened
06/28/2023 Receipt Receipt for transaction:2023-001222
07/06/2023 Agreement PRCCP20220092 LARSON SWA RECORDED
08/02/2023 Easement PRCCP20220092_LARSON_EASEMENT RECORDED
04/26/2024 Receipt Receipt for transaction:2024-000856


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.