Summary

PRCCP20221569
Civil Construction Permit
Permit(s) Issued
COPPERBERRY CONDOMINIUMS LLC
Extend utilities from 10th street SE on a site for purposes of construction 2- 6 plexus as well as provide infiltration on site. COPPERBERRY CONDOMINIUMS
10/07/2022
08/15/2023
08/15/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Civil Review Approved 08/30/2023 08/10/2023
Engineering Traffic Review Approved 08/30/2023 08/10/2023
Fire Review Approved 08/30/2023 08/07/2023
Public Works Water Review VOID 08/30/2023 08/07/2023
Public Works Streets Review VOID 08/30/2023 08/07/2023
Public Works Collection Review VOID 08/30/2023 08/07/2023
Planning Review Approved 08/30/2023 08/04/2023
Planning Review Failed 07/18/2023 07/18/2023
Fire Review Failed 07/18/2023 07/14/2023
Engineering Civil Review Failed 07/18/2023 07/11/2023
Public Works Streets Review Approved 07/18/2023 07/05/2023
Public Works Collection Review Approved 07/18/2023 06/30/2023
Public Works Water Review Approved 07/18/2023 06/27/2023
Engineering Traffic Review Failed 07/18/2023 06/20/2023
Planning Review Failed 05/09/2023 05/17/2023
Engineering Traffic Review Failed 05/09/2023 05/17/2023
Public Works Streets Review Failed 05/09/2023 05/15/2023
Engineering Civil Review Failed 05/09/2023 05/09/2023
Fire Review Failed 05/09/2023 05/08/2023
Public Works Collection Review Failed 05/09/2023 05/05/2023
Public Works Water Review Failed 05/09/2023 04/12/2023
Engineering Traffic Review Failed 12/29/2022 01/13/2023
Planning Review Failed 12/29/2022 01/10/2023
Public Works Collection Review Failed 12/29/2022 01/09/2023
Public Works Streets Review Failed 12/29/2022 01/06/2023
Fire Review Failed 12/29/2022 01/05/2023
Engineering Civil Review Failed 12/29/2022 12/28/2022
Public Works Water Review Failed 12/29/2022 12/07/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Engineering Inspection Fee (3%) $10,546.56 $10,546.56 Paid 08/15/2023
Engineering Permit Fee $300.00 $300.00 Paid 08/15/2023
Traffic Control Permit Fee $50.00 $50.00 Paid 10/10/2022
Traffic Control Plan Review Fee $40.00 $40.00 Paid 10/10/2022
Civil Review Fee $470.00 $470.00 Paid 10/10/2022
Record Drawing Review Fee $200.00 $200.00 Paid 10/10/2022
Civil Review Additional Fee $720.00 $720.00 Paid 06/13/2023
Civil Review Additional Fee $180.00 $180.00 Paid 07/31/2023
Planning Landscape Review Fee $300.00 $300.00 Paid 08/15/2023
Miscellaneous Fee $307.50 $307.50 Paid 02/19/2025
$180.00
Miscellaneous Fee $337.50 $337.50 Paid 02/19/2025
$180.00
Outstanding Fees Amount Paid Owing Date Paid
Storm System Development Charge - Commercial $37,318.50 $0.00 $37,318.50 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$37,318.50    Add Fees to My Cart

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Final Inspection Pending
Jason Little ((253) 244-0387)
Engineering Punchlist Inspection Pending
Jason Little ((253) 244-0387)
Planning Final Inspection Pending 4/9/2025
Nabila Comstock ((253) 770-3361)
Engineering Preconstruction Inspection (Pre-Con Meeting) Passed 8/21/2023 08/18/2023
Robyn Buck ((253) 435-3617)
Engineering Daily Inspection Partial Pass 8/21/2023 08/21/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/22/2023 08/22/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/23/2023 08/23/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/24/2023 08/24/2023
Jason Little ((253) 244-0387)
Erosion And Sediment Inspection Failed 8/24/2023 08/24/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/24/2023
Silt fence along west side: - Overlap gaps on bottom need to be closed up in areas. - Overlap on back needs to be connected in areas. - Please remove wood along gutter pan when de-mobilized.

Engineering Daily Inspection Partial Pass 8/25/2023 08/25/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/28/2023 08/28/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/29/2023 08/29/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 8/30/2023 08/30/2023
Jason Little ((253) 244-0387)
Erosion And Sediment Inspection Partial Pass 8/31/2023 09/01/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
09/01/2023
- Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Maintain construction entrance. (Cleanliness, track out, etc...) - Watch run during heavy rain events.

Engineering Daily Inspection Partial Pass 8/31/2023 09/01/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/4/2023 09/05/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/6/2023 09/06/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/7/2023 09/07/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/8/2023 09/08/2023
Jason Little ((253) 244-0387)
Erosion And Sediment Inspection Partial Pass 9/11/2023 9/11/2023 09/11/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
09/11/2023
- Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Maintain construction entrance. (Cleanliness, track out, etc...) - Watch run during heavy rain events.

Engineering Daily Inspection Partial Pass 9/11/2023 09/11/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/13/2023 09/13/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/15/2023 09/15/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/18/2023 09/18/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/22/2023 09/22/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/25/2023 09/25/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/27/2023 09/27/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/28/2023 09/28/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 9/29/2023 09/29/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 10/2/2023 10/02/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 10/3/2023 10/03/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 10/4/2023 10/04/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 10/6/2023 10/06/2023
Jason Little ((253) 244-0387)
Erosion And Sediment Inspection Partial Pass 10/13/2023 10/13/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/13/2023
- Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Maintain construction entrance. (Cleanliness, track out, etc...) - Watch run during heavy rain events.

Engineering Daily Inspection VOID 10/17/2023 10/16/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 10/17/2023 10/17/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 10/18/2023 10/18/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 10/19/2023 10/19/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 10/20/2023 10/20/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 10/23/2023 10/23/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 10/24/2023 10/24/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 10/25/2023 10/26/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 10/26/2023 10/27/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 10/27/2023 10/27/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 10/30/2023 10/30/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/1/2023 11/01/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/2/2023 11/02/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/3/2023 11/03/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/6/2023 11/06/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/7/2023 11/07/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/8/2023 11/08/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/9/2023 11/09/2023
Jason Little ((253) 244-0387)
Erosion And Sediment Inspection Failed 11/9/2023 11/09/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/09/2023
- Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Maintain construction entrance. (Cleanliness, track out, etc...) - Watch run during heavy rain events.

Engineering Daily Inspection Partial Pass 11/10/2023 11/10/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/13/2023 11/13/2023
Jason Little ((253) 244-0387)
Erosion And Sediment Inspection Partial Pass 11/13/2023 11/13/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/13/2023
- Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Maintain construction entrance. (Cleanliness, track out, etc...) - Watch runoff during heavy rain events.

Engineering Daily Inspection Partial Pass 11/14/2023 11/14/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/15/2023 11/15/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/15/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Job Start Inspection Passed 11/16/2023 11/16/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 11/16/2023 11/16/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/16/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 11/17/2023 11/17/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/17/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 11/20/2023 11/20/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/20/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Erosion And Sediment Inspection Partial Pass 11/20/2023 11/20/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/20/2023
- Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Maintain construction entrance. (Cleanliness, track out, etc...) - Watch runoff during heavy rain events.

Engineering Daily Inspection Partial Pass 11/21/2023 11/21/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/21/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 11/22/2023 11/22/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/22/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 11/27/2023 11/27/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/27/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 11/29/2023 11/29/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/29/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 11/30/2023 11/30/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/30/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 12/1/2023 12/01/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/01/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 12/4/2023 12/04/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/04/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Erosion And Sediment Inspection Failed 12/4/2023 12/04/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/04/2023
- Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Maintain construction entrance. (Cleanliness, track out, etc...) - Watch runoff during heavy rain events.

Engineering Daily Inspection Partial Pass 12/5/2023 12/05/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/05/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Erosion And Sediment Inspection Partial Pass 12/5/2023 12/05/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/05/2023
- Delineate west side of north building. This area is soft. No fork lift and minimal foot traffic. - Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Maintain construction entrance. (Cleanliness, track out, etc...) - Watch runoff during heavy rain events.

Engineering Daily Inspection Partial Pass 12/6/2023 12/07/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/07/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 12/7/2023 12/07/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/07/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 12/8/2023 12/08/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/11/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 12/11/2023 12/11/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/11/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 12/12/2023 12/12/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/13/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 12/14/2023 12/14/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/14/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 12/15/2023 12/15/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/15/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 12/18/2023 12/18/2023
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Resolved
12/15/2023
ALL side sewers need a plug installed in the c/o y during building construction process. Once building is ready for a final the plugs can be removed.

Engineering Daily Inspection Partial Pass 12/20/2023 12/20/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 12/22/2023 12/22/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 12/26/2023 12/26/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 12/27/2023 12/27/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 12/28/2023 12/28/2023
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/2/2024 01/02/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/3/2024 01/03/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/4/2024 01/04/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/5/2024 01/05/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/8/2024 01/08/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/9/2024 01/09/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/11/2024 01/11/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/12/2024 01/12/2024
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 1/16/2024 01/16/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/17/2024 01/17/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/18/2024 01/18/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/19/2024 01/19/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/22/2024 01/22/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/24/2024 01/24/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/25/2024 01/25/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/29/2024 01/29/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/30/2024 01/30/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 1/31/2024 01/31/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/2/2024 02/02/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/5/2024 02/05/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/6/2024 02/06/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/7/2024 02/07/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/8/2024 02/08/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/9/2024 02/09/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/13/2024 02/13/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/15/2024 02/15/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/21/2024 02/21/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/22/2024 02/22/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/23/2024 02/23/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/26/2024 02/26/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 2/28/2024 02/28/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/1/2024 03/01/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/4/2024 03/04/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/6/2024 03/06/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/7/2024 03/07/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/8/2024 03/08/2024
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 3/11/2024 03/11/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/12/2024 03/12/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/13/2024 03/13/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/14/2024 03/14/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/15/2024 03/15/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/18/2024 03/18/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/19/2024 03/19/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/20/2024 03/20/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/21/2024 03/22/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/25/2024 03/25/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/27/2024 03/27/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/1/2024 04/01/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/2/2024 04/02/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/3/2024 04/03/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/4/2024 04/04/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/5/2024 04/05/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/8/2024 04/08/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/9/2024 04/09/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/12/2024 04/12/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/15/2024 04/15/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/16/2024 04/16/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/17/2024 04/17/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/18/2024 04/18/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/19/2024 04/19/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Failed 4/22/2024 04/22/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/24/2024 04/24/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/26/2024 04/26/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/29/2024 04/29/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/1/2024 05/01/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/2/2024 05/02/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/3/2024 05/03/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/6/2024 05/06/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/7/2024 05/07/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/8/2024 05/08/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/10/2024 05/10/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/13/2024 05/13/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/16/2024 05/16/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/17/2024 05/17/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/21/2024 05/21/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/22/2024 05/22/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/23/2024 05/23/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 5/24/2024 05/24/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Failed 5/28/2024 05/28/2024
Jason Little ((253) 244-0387)
Erosion And Sediment Inspection Failed 5/28/2024 05/28/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
05/28/2024
- All concrete washout needs to be contained. No concrete washout on the ground without containment. - Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Maintain construction entrance. (Cleanliness, track out, etc...) - Watch runoff during heavy rain events.

Engineering Daily Inspection Partial Pass 5/29/2024 05/29/2024
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 6/5/2024 06/05/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/05/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/6/2024 06/06/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
06/06/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/7/2024 06/07/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/07/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/10/2024 06/10/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/10/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/11/2024 06/11/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/11/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/12/2024 06/12/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/12/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/13/2024 06/14/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
06/14/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/14/2024 06/14/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
06/14/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/18/2024 06/18/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/18/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/20/2024 06/20/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/20/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/21/2024 06/21/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/21/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/25/2024 06/25/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/25/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/26/2024 06/26/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/26/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/27/2024 06/27/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/27/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 6/28/2024 06/28/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
06/28/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 7/1/2024 07/01/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
07/01/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 7/2/2024 07/03/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
07/03/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 7/3/2024 07/03/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
07/03/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 7/5/2024 07/09/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
07/09/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 7/9/2024 07/09/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
07/09/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 7/12/2024 07/12/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
07/12/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 7/19/2024 07/19/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
07/19/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Failed 7/24/2024 07/24/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
07/24/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 7/25/2024 07/25/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
07/25/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 7/26/2024 07/26/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
07/26/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 8/5/2024 08/05/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/05/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 8/9/2024 08/09/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/09/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 8/16/2024 08/16/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/16/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Failed 8/20/2024 08/20/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/20/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 8/23/2024 08/23/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/23/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 8/26/2024 08/26/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/26/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 8/29/2024 08/29/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/29/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 8/30/2024 08/30/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
08/30/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 9/5/2024 09/05/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
09/05/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 9/17/2024 09/17/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
09/17/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 9/20/2024 09/20/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
09/20/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 9/23/2024 09/23/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
09/23/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 9/26/2024 09/26/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
09/26/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 9/27/2024 09/27/2024
Michael Rosenau ((253) 344-6753)
Corrections:


Other/Miscellaneous
Carried Forward
09/27/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/1/2024 10/01/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/01/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/11/2024 10/11/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/11/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/14/2024 10/14/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/14/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/15/2024 10/15/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/15/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/16/2024 10/16/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/16/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/18/2024 10/18/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/18/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/21/2024 10/21/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/21/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/22/2024 10/22/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/22/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/23/2024 10/23/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/23/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/25/2024 10/25/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/25/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 10/30/2024 10/30/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
10/30/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 11/1/2024 11/01/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/01/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Erosion And Sediment Inspection Failed 11/1/2024 11/01/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/01/2024
- Pump concrete washout to upper landscape areas. - Move concrete washout away from CB. - All concrete washout needs to be contained. No concrete washout on the ground without containment. - Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Watch runoff during heavy rain events.

Engineering Daily Inspection Partial Pass 11/6/2024 11/06/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/06/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 11/12/2024 11/12/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/12/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 11/14/2024 11/14/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/14/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 11/19/2024 11/19/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/19/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 11/22/2024 11/22/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/22/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 11/26/2024 11/26/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/26/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 11/27/2024 11/27/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
11/27/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 12/6/2024 12/06/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/06/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 12/9/2024 12/09/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/09/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 12/10/2024 12/10/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/10/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 12/12/2024 12/12/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/12/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 12/12/2024 12/12/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Resolved
12/12/2024
Straighten FDC. Pressure FDC. Flush FDC after ALL underground has been completed.

Engineering Daily Inspection Partial Pass 12/18/2024 12/18/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/18/2024
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - North neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - North neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
12/18/2024
STORM - Finish down spout tie in on South and north building. - Stabilize exposed soil slope at south end of wall. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
12/18/2024
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
12/18/2024
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter - Finish fire inspection card and WSP form.

Engineering Daily Inspection Partial Pass 12/24/2024 12/24/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/24/2024
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - South neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - South neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
12/24/2024
STORM - Finish down spout tie in on South and north building. - Stabilize exposed soil slope at south end of wall. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
12/24/2024
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
12/24/2024
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter - Need fire double check certified. - Need fire service meter tagged "FOR FIRE ONLY". - Finish fire inspection card and WSP form.

Engineering Daily Inspection Partial Pass 12/27/2024 12/27/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/27/2024
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - South neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - South neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
12/27/2024
STORM - Finish down spout tie in on South and north building. - Stabilize exposed soil slope at south end of wall. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
12/27/2024
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
12/27/2024
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter - Need fire double check certified. - Need fire service meter tagged "FOR FIRE ONLY". - Finish fire inspection card and WSP form.

Engineering Daily Inspection Partial Pass 12/30/2024 12/30/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
12/30/2024
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - South neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - South neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
12/30/2024
STORM - Finish down spout tie in on South and north building. - Stabilize exposed soil slope at south end of wall. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
12/30/2024
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
12/30/2024
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter - Need fire double check certified. - Need fire service meter tagged "FOR FIRE ONLY". - Finish fire inspection card and WSP form.

Engineering Daily Inspection Partial Pass 12/31/2024 12/31/2024
Michael Rosenau ((253) 344-6753)
Corrections:


Other/Miscellaneous
Carried Forward
12/31/2024
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - South neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - South neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
12/31/2024
STORM - Finish down spout tie in on South and north building. - Stabilize exposed soil slope at south end of wall. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
12/31/2024
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
12/31/2024
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter - Need fire double check certified. - Need fire service meter tagged "FOR FIRE ONLY". - Finish fire inspection card and WSP form.

Engineering Daily Inspection Partial Pass 1/2/2025 01/02/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
01/02/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - South neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - South neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
01/02/2025
STORM - Finish down spout tie in on South and north building. - Stabilize exposed soil slope at south end of wall. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
01/02/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
01/02/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter - Need fire double check certified. - Need fire service meter tagged "FOR FIRE ONLY". - Finish fire inspection card and WSP form.

Planning Landscape Inspection Passed 1/8/2025 01/09/2025
Nabila Comstock ((253) 770-3361)
Engineering Daily Inspection Partial Pass 1/10/2025 01/10/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
01/10/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - South neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - South neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
01/10/2025
STORM - Finish down spout tie in on South and north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
01/10/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
01/10/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter - Need fire double check certified. - Need fire service meter tagged "FOR FIRE ONLY". - Finish fire inspection card and WSP form.

Engineering Daily Inspection Partial Pass 1/15/2025 01/15/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
01/15/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - South neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - South neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
01/15/2025
STORM - Finish down spout tie in on South and north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
01/15/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
01/15/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter - Need to either raise the buried RPBA or install a DDCVA (the one installed is a buried RPBA and can not be certified). - Finish fire inspection card.

Engineering Daily Inspection Partial Pass 1/17/2025 01/17/2025
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
01/20/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - South neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - South neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
01/20/2025
STORM - Finish down spout tie in on South and north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
01/20/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
01/20/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter - Need to either raise the buried RPBA or install a DDCVA (the one installed is a buried RPBA and can not be certified). - Finish fire inspection card.

Engineering Daily Inspection Partial Pass 1/30/2025 01/31/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
01/31/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - South neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - South neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
01/31/2025
STORM - Finish down spout tie in on north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
01/31/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
01/31/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter - Need RPBA cert.

Other/Miscellaneous
Carried Forward
01/31/2025
PRIOR TO SOUTH BUILDING FINAL - Need RPBA cert. - Backfill any edges creating tripping hazards. - Clean the parking lot. - Clean out extra soil from underneath the stairs. - Weld existing j-box. - Remove the south base of the street light for grout inspection. - Cut down the stabilizing posts for the FDC, lower than the FDC. - Pave the south neighboring drive.

Engineering Daily Inspection Partial Pass 2/4/2025 02/04/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
02/04/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Street light j-box (3ea) need welded. - Street light base needs grout. - South neighboring property driveway needs cut, paved, extruded curb installed. (Match existing) White painted line for saw cut and removal. - South neighboring property sidewalk needs backfilled.

Other/Miscellaneous
Carried Forward
02/04/2025
STORM - Finish down spout tie in on north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
02/04/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
02/04/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter

Other/Miscellaneous
Carried Forward
02/04/2025
PRIOR TO SOUTH BUILDING FINAL - Backfill any edges creating tripping hazards. - Clean the parking lot. - Clean out extra soil from underneath the stairs. - Weld existing j-box. - Pave the south neighboring drive.

Engineering Daily Inspection Partial Pass 2/7/2025 02/07/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
02/07/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving. - Weld south existing j-box.

Other/Miscellaneous
Carried Forward
02/07/2025
STORM - Finish down spout tie in on north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Clean garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
02/07/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
02/07/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter

Other/Miscellaneous
Carried Forward
02/07/2025
PRIOR TO SOUTH BUILDING FINAL - Backfill any edges creating tripping hazards. - Clean the parking lot. - Clean out extra soil from underneath the stairs. - Weld south existing j-box.

Engineering Daily Inspection Partial Pass 2/21/2025 02/21/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
02/21/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
02/21/2025
STORM - Finish down spout tie in on north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Keep garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
02/21/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
02/21/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter

Other/Miscellaneous
Carried Forward
02/21/2025
PRIOR TO SOUTH BUILDING FINAL - Backfill any edges creating tripping hazards. - Keep the parking lot clean. - Clean out extra soil from underneath the stairs.

Engineering Daily Inspection Partial Pass 2/28/2025 02/28/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
02/28/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
02/28/2025
STORM - Finish down spout tie in on north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Keep garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
02/28/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
02/28/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter

Other/Miscellaneous
Carried Forward
02/28/2025
PRIOR TO SOUTH BUILDING FINAL - Backfill any edges creating tripping hazards. - Keep the parking lot clean. - Clean out extra soil from underneath the stairs.

Engineering Daily Inspection Partial Pass 3/7/2025 03/07/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
03/07/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
03/07/2025
STORM - Finish down spout tie in on north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Keep garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
03/07/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
03/07/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter

Other/Miscellaneous
Carried Forward
03/07/2025
PRIOR TO SOUTH BUILDING FINAL - Backfill any edges creating tripping hazards. - Keep the parking lot clean. - Clean out extra soil from underneath the stairs.

Engineering Daily Inspection Partial Pass 3/14/2025 03/14/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
03/14/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
03/14/2025
STORM - Finish down spout tie in on north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Keep garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
03/14/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
03/14/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter

Other/Miscellaneous
Carried Forward
03/14/2025
PRIOR TO SOUTH BUILDING FINAL - Backfill any edges creating tripping hazards. - Keep the parking lot clean. - Clean out extra soil from underneath the stairs.

Engineering Daily Inspection Partial Pass 3/18/2025 03/18/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
03/18/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
03/18/2025
STORM - Finish down spout tie in on north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Keep garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
03/18/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
03/18/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter

Other/Miscellaneous
Carried Forward
03/18/2025
PRIOR TO SOUTH BUILDING FINAL - Backfill any edges creating tripping hazards. - Keep the parking lot clean. - Clean out extra soil from underneath the stairs.

Engineering Daily Inspection Partial Pass 3/19/2025 03/19/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
03/19/2025
STREETS - Asphalt frontage improvements. Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
03/19/2025
STORM - Finish down spout tie in on north building. - Re-grade slope at step of wall. (Middle) No soil drifting over top of wall. - Finish landscape around north building. - Stabilize exposed soil slope at north end of wall. - Pour concrete collar around existing storm MH in NW corner. - Keep garbage debris off on site parking lot.

Other/Miscellaneous
Carried Forward
03/19/2025
SEWER - North building side sewer's need to be cut down and sewer Carson boxes installed.

Other/Miscellaneous
Carried Forward
03/19/2025
MISC. - Sidewalks around north building needs to be finished, including walkway to city right of way. - SWA - As-Builts - Engineer Letter

Other/Miscellaneous
Carried Forward
03/19/2025
PRIOR TO SOUTH BUILDING FINAL - Backfill any edges creating tripping hazards. - Keep the parking lot clean. - Clean out extra soil from underneath the stairs.

Engineering Daily Inspection Partial Pass 3/21/2025 03/21/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
03/21/2025
STREETS - Asphalt frontage improvements (rebuild with 4" or G&O if it allows) Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
03/21/2025
STORM - Re-grade slope behind storm filter and at step of wall. (Middle) No soil drifting over top of wall! With the steepness of the slop jute matting may need to be installed prior to planting and barking. - Spread out soil piles along west side of wall then stabilize with straw. - Pour concrete collar around existing storm MH in NW corner. - Keep garbage debris off on site parking lot. - Remove spoil pile near mail back and protect soil. - Back fill hole behind north building and stabilize soil. - Remove CB socks along both sides of 10th. - Remove plastic from CB at north building east patio.

Other/Miscellaneous
Carried Forward
03/21/2025
SEWER - North building side sewer's need to be inspected. All concrete removed from around the interior cap. - Install casting lids that say "SEWER".

Other/Miscellaneous
Carried Forward
03/21/2025
MISC. - As-Builts - Engineer Letter

Other/Miscellaneous
Resolved
03/21/2025

Erosion And Sediment Inspection VOID 03/21/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Outstanding
11/01/2024
- Pump concrete washout to upper landscape areas. - Move concrete washout away from CB. - All concrete washout needs to be contained. No concrete washout on the ground without containment. - Maintain frontage cleanliness. (Gutter pan, road way, sidewalk, etc...) - Watch runoff during heavy rain events.

Engineering Punchlist Inspection Partial Pass 3/25/2025 03/25/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 3/25/2025 03/25/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
03/25/2025
STREETS - Asphalt frontage improvements (rebuild with 4" or G&O if it allows) Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
03/25/2025
STORM - Re-grade slope behind storm filter and at step of wall. (Middle) No soil drifting over top of wall! With the steepness of the slop jute matting may need to be installed prior to planting and barking. - Spread out soil piles along west side of wall then stabilize with straw. - Pour concrete collar around existing storm MH in NW corner. - Keep garbage debris off on site parking lot. - Remove spoil pile near mail back and protect soil. - Back fill hole behind north building and stabilize soil. - Remove CB socks along both sides of 10th. - Remove plastic from CB at north building east patio.

Other/Miscellaneous
Carried Forward
03/25/2025
SEWER - North building side sewer's need to be inspected. All concrete removed from around the interior cap. - Install casting lids that say "SEWER".

Other/Miscellaneous
Carried Forward
03/25/2025
MISC. - As-Builts - Engineer Letter

Engineering Daily Inspection Partial Pass 4/3/2025 04/03/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
04/03/2025
STREETS - Asphalt frontage improvements (rebuild with 4" or G&O if it allows) Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
04/03/2025
STORM - Re-grade slope behind storm filter and at step of wall. (Middle) No soil drifting over top of wall! With the steepness of the slop jute matting may need to be installed prior to planting and barking. - Spread out soil piles along west side of wall then stabilize with straw. - Pour concrete collar around existing storm MH in NW corner. - Keep garbage debris off on site parking lot. - Remove spoil pile near mail back and protect soil. - Back fill hole behind north building and stabilize soil. - Remove CB socks along both sides of 10th. - Remove plastic from CB at north building east patio.

Other/Miscellaneous
Carried Forward
04/03/2025
SEWER - North building side sewer's need to be inspected. All concrete removed from around the interior cap. - Install casting lids that say "SEWER".

Other/Miscellaneous
Carried Forward
04/03/2025
MISC. - As-Builts - Engineer Letter

Engineering Daily Inspection Partial Pass 4/4/2025 04/04/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
04/04/2025
STREETS - Asphalt frontage improvements (rebuild with 4" or G&O if it allows) Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
04/04/2025
STORM - West side of wall install straw. - Keep garbage debris off on site parking lot. - Remove CB socks along both sides of 10th. - Remove plastic from CB at north building east patio.

Other/Miscellaneous
Carried Forward
04/04/2025
SEWER - North building side sewer's need to be inspected. All concrete removed from around the interior cap. - Install casting lids that say "SEWER".

Other/Miscellaneous
Carried Forward
04/04/2025
MISC. - As-Builts - Engineer Letter

Engineering Punchlist Inspection Partial Pass 4/4/2025 04/04/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/7/2025 04/07/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
04/07/2025
STREETS - Asphalt frontage improvements (rebuild with 4" or G&O if it allows) Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
04/07/2025
STORM - West side of wall install straw. - Keep garbage debris off on site parking lot. - Remove CB socks along both sides of 10th. - Remove plastic from CB at north building east patio.

Other/Miscellaneous
Carried Forward
04/07/2025
SEWER - North building side sewer's need to be inspected. All concrete removed from around the interior cap. - Install casting lids that say "SEWER".

Other/Miscellaneous
Carried Forward
04/07/2025
MISC. - As-Builts - Engineer Letter

Engineering Punchlist Inspection Partial Pass 4/8/2025 04/08/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Partial Pass 4/8/2025 04/08/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
04/08/2025
STREETS - Asphalt frontage improvements (rebuild with 4" or G&O if it allows) Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
04/08/2025
STORM - West side of wall install straw. - Keep garbage debris off on site parking lot. - Remove CB socks along both sides of 10th. - Remove plastic from CB at north building east patio.

Other/Miscellaneous
Carried Forward
04/08/2025
SEWER - North building side sewer's need to be inspected. All concrete removed from around the interior cap. - Install casting lids that say "SEWER".

Other/Miscellaneous
Carried Forward
04/08/2025
MISC. - As-Builts - Engineer Letter

Engineering Daily Inspection Partial Pass 4/9/2025 04/09/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
04/09/2025
STREETS - Asphalt frontage improvements (rebuild with 4" or G&O if it allows) Includes re-striping 1 month after paving.

Other/Miscellaneous
Carried Forward
04/09/2025
STORM - West side of wall install straw. - Keep garbage debris off on site parking lot. - Remove CB socks along both sides of 10th. - Remove plastic from CB at north building east patio.

Other/Miscellaneous
Carried Forward
04/09/2025
SEWER - North building side sewer's need to be inspected. All concrete removed from around the interior cap. - Install casting lids that say "SEWER".

Other/Miscellaneous
Carried Forward
04/09/2025
MISC. - As-Builts - Engineer Letter

Engineering Punchlist Inspection Partial Pass 4/10/2025 04/10/2025
Jason Little ((253) 244-0387)
Engineering Punchlist Inspection Partial Pass 4/10/2025 04/10/2025
Jason Little ((253) 244-0387)
Engineering Daily Inspection Passed 4/10/2025 04/10/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Resolved
04/10/2025
STREETS - Asphalt frontage improvements (rebuild with 4" or G&O if it allows) Includes re-striping 1 month after paving.

Other/Miscellaneous
Resolved
04/10/2025
STORM - West side of wall install straw. - Keep garbage debris off on site parking lot. - Remove CB socks along both sides of 10th. - Remove plastic from CB at north building east patio.

Other/Miscellaneous
Resolved
04/10/2025
SEWER - North building side sewer's need to be inspected. All concrete removed from around the interior cap. - Install casting lids that say "SEWER".

Other/Miscellaneous
Resolved
04/10/2025
MISC. - As-Builts - Engineer Letter

Conditions

Condition Status Category
Civil Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard civil construction conditions: 1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work. 2. Construction permitted as per approved civil plans. 3. Construction permit shall expire by limitation and be declared void if: a. Work is not started within 180 days of obtaining the permit. b. Work is abandoned for 180 days or more after beginning work. c. After two years from the date of permit issuance, regardless of whether work is finished. 4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority. 8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval. 9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits. 10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pre-Construction Meeting Resolved Standard Conditions
Engineering Division
08/18/2023
Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
Certificate of Insurance/CG2012 Resolved Prior to Issuance
Engineering Division
Certificate or Insurance/CG2012 must be received prior to issuance
Performance Bond Resolved Prior to Issuance
Engineering Division
A Performance Bond must be received by the City of Puyallup prior to permit issuance. The Performance Bond shall be 150% of the estimated cost of work in the ROW per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/16622/Performance-Bond-51122-appvd-by-Legal for more information.
Miscellaneous Condition Resolved Prior to Occupancy
Engineering Division
Page 5 of the Drainage Report references a maintenance and source control manual for the project. Some operations and maintenance material is included in the SWPPP. Prior to project completion a Stormwater Agreement shall be prepared that conforms to City of Puyallup Engineering Standards Section 205 and includes the Operations and Maintenance Manual. This manual shall conform to City of Puyallup Standard 205.4.
Backflow Protection Device - Commercial DCVA Resolved Prior to Issuance
Engineering Division
A 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal. Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2. An approved double check valve assembly (DCVA) backflow device is required to be installed on the commercial water service (4 plexes and above are considered commercial) per City Standard Detail 03.04.01. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
Miscellaneous Condition Open Standard Conditions
Development & Permitting Services
City standards call for elevation changes for walkways and curbing in parking lots. As this is a private, residential development the absence of curbs and grade breaks on site is approvable, but the owner will assume all responsibility for damage to utilities, walkways, etc. and will also be responsible for accesability and ADA compliance.
Miscellaneous Condition Resolved Prior to Occupancy
Planning Division
Since the utility lines along the north cannot be moved, we will require that there needs to be shrubs and plants planted in the areas where the trees were required and removed in order to provide vegetation in the landscape buffer area.
Miscellaneous Condition Resolved Prior to Occupancy
Engineering Division
Covenant needed to address issue of FDC connection. Prior to occupancy recorded covenant for FDC must be provided to the City. [Kenneth Cook @ 07/19/2023 3:17 PM]
Miscellaneous Condition Resolved Prior to Occupancy
Planning Division
The Condo Declaration must be provided prior to occupancy. The Declaration outlines details regarding trash/recycling requirements for condominium owners/tenants as well as the office space owner/tenant that specifies that all refuse/recycle cans will need to be in individual garages and put out and returned on the day of pick-up.
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
INDEPENDENT DISCOVERY PLAN SIGNATURE PAGE
Overtime Inspection and Watermain Shutdown Fee Resolved Prior to Issuance
Engineering Division
This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
A STORMWATER PERFORMANCE BOND IS REQUIRED
Miscellaneous Condition Resolved Prior to Completion
Engineering Division
The APPROVED PLANS do not portray the final lighting design. Prior to the initiation of the installation of the street lights, the applicant shall submit and the city shall review and approve the final details of the streetlighting plans to include revisions based on outstanding city corrections. Specifically: -Locate northern street light 390 feet north of existing street light at 4112 10th Street SE and locate the southern street light 195 feet north of existing street light at 4112 10th Street SE. -Provide all details of installation of conduits and restoration of affected areas. -Civil Plans Sheet C4 state that the contractor is to remove and replace sidewalk panels as necessary during installation of luminare bases. This shall be determined by the City Civil Inspector.
Miscellaneous Condition Open Prior to Completion
Engineering Division
STORM SYSTEM DEVELOPMENT CHARGES MUST BE PAID [Jamie Carter @ 05/31/2024 11:04 AM]
Miscellaneous Condition Resolved Prior to Occupancy
Development & Permitting Services
Grantor must pay recording fee for easement.
Miscellaneous Condition Resolved Prior to Occupancy
Development & Permitting Services
Easement must be recorded.
Punchlist: Provide the City with an electronic version of the record drawings Resolved Misc. Punchlist Section B
Engineering Division
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
Punchlist: Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection Resolved Misc. Punchlist Section A
Engineering Division
Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection. Landscape requirements to be added to the punchlist.
Punchlist: Provide DCVA Test Results Resolved Water Punchlist Section A
Engineering Division
Provide the City with the test results for the irrigation Double Check Valve Assembly (DCVA).
Punchlist: Provide the City a letter from the Design Engineer for the proper install of the stormwater BMP’s Resolved Storm Punchlist Section A
Engineering Division
Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
Punchlist: Provide the City with a signed stormwater agreement Resolved Storm Punchlist Section B
Engineering Division
Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described in item 3 as a recorded exhibit.
Miscellaneous Condition Resolved Prior to Occupancy
Development & Permitting Services
Grantor must pay recording fee for SWA.
Punchlist: Miscellaneous Sewer A Item Resolved Sewer Punchlist Section A
Development & Permitting Services
North building side sewer's need to be inspected. All concrete removed from around the interior cap.
Punchlist: Miscellaneous Sewer A Item Resolved Sewer Punchlist Section A
Development & Permitting Services
Install casting lids that say "SEWER".
Punchlist: Miscellaneous Streets B Item Open Street Punchlist Section B
Engineering Division
10th was paved on 4/9/25, 10th may be striped after 5/9/25. Need AoF's prior to occupancy.
Punchlist: Miscellaneous A Item Resolved Misc. Punchlist Section A
Development & Permitting Services
Punchlist: Miscellaneous A Item Resolved Misc. Punchlist Section A
Development & Permitting Services
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
Re-grade slope behind storm filter and at step of wall. (Middle) No soil drifting over top of wall! With the steepness of the slop jute matting may need to be installed prior to planting and barking.
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
West side of wall stabilize with straw.
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
Pour concrete collar around existing storm MH in NW corner.
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
Remove plastic from CB at north building east patio.
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
Remove CB socks along both sides of 10th.
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
Back fill hole behind north building and stabilize soil.
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
Remove spoil pile near mail back and protect soil.
Punchlist: Miscellaneous Stormwater A Item Open Storm Punchlist Section A
Development & Permitting Services
Keep garbage debris off on site parking lot. remove spoil pile near mail box.
Punchlist: This project owes overtime inspection fees Open Misc. Punchlist Section A
Engineering Division
This project owes $270.00 in overtime inspection fees. Overtime was performed on 4/9/25 for paving. 1.5hrs.

Related Permit & Planning Applications

Reference Number Status Type
PRMU20221555 Permit(s) Issued Residential - New Multi-Unit
PRMU20221586 Closed Residential - New Multi-Unit
PRFUP20231150 Closed Franchise Utility Permit
PRFA20240334 Closed Fire Alarms
PRFA20240335 Closed Fire Alarms
PRFS20240551 Closed Fire Sprinklers
PRFS20240552 Closed Fire Sprinklers
PRCTI20250352 Closed Commercial - Tenant Improvement/Remodel
P-21-0096 File Closed Preliminary Site Plan
P-21-0014 File Closed Pre-Application

Documents & Images

Date Uploaded File Type Name
10/07/2022 Report Geo Observation Report - Small Scale Pit 13298
10/10/2022 Receipt Receipt for transaction:2022-002003
11/11/2022 Plans Copperberry-D-Water-2022-11-06
11/11/2022 Form APPLICATION
01/13/2023 Letter Permit Review Comment Notice
01/18/2023 Report Sewer Main Inspection - Copperberry - S1-01183
06/13/2023 Receipt Receipt for transaction:2023-001098
06/27/2023 Plans Copperberry Condo FIRE LINE North Bld Puyallup Layout 1 (1)
06/27/2023 Plans Copperberry Condo FIRE LINE South Bld Puyallup Layout 1 (1)
07/19/2023 Plans CopperBerry Street Lighting Electrical Drawings 6-27-2023 (Flattened)
07/19/2023 Plans 13R submittal NO DOMESTIC SHUT OFF No sprinkler cut sheet (2) (Flattened)
07/19/2023 Report Copperberry-R-Drainage Report-2023-06-10 (Flattened)
07/31/2023 Receipt Receipt for transaction:2023-001443
08/10/2023 Plans Copperberry 24July2023 Full Landsc Set TR1-IR2 - RESUB (Flattened)
08/10/2023 Plans Copperberry-D-Civil-2023-07-27 APPROVED PLANS FOR PERMIT needs street lighting update (Stamped)
08/15/2023 Receipt Receipt for transaction:2023-001568
08/15/2023 Permit Permit - Detailed
08/24/2023 Report Inspection Report (Erosion And Sediment Inspection)
09/01/2023 Report Inspection Report (Erosion And Sediment Inspection)
09/11/2023 Report Inspection Report (Erosion And Sediment Inspection)
10/13/2023 Report Inspection Report (Erosion And Sediment Inspection)
10/16/2023 Report Inspection Report (Engineering Daily Inspection)
11/09/2023 Report Inspection Report (Erosion And Sediment Inspection)
11/10/2023 Report Inspection Report (Engineering Daily Inspection)
11/13/2023 Report Inspection Report (Erosion And Sediment Inspection)
11/15/2023 Report Inspection Report (Engineering Daily Inspection)
11/16/2023 Report Inspection Report (Engineering Daily Inspection)
11/20/2023 Report Inspection Report (Erosion And Sediment Inspection)
12/04/2023 Report Inspection Report (Erosion And Sediment Inspection)
12/05/2023 Report Inspection Report (Erosion And Sediment Inspection)
12/15/2023 Report Inspection Report (Engineering Daily Inspection)
04/22/2024 Report Inspection Report (Engineering Daily Inspection)
05/06/2024 Report Inspection Report (Engineering Daily Inspection)
05/28/2024 Report Inspection Report (Erosion And Sediment Inspection)
06/05/2024 Report Inspection Report (Engineering Daily Inspection)
07/09/2024 COPPERBERRY EASEMENT - RECORDED & CCO STAMPED
07/24/2024 Report Inspection Report (Engineering Daily Inspection)
11/26/2024 Report StormFilter online inspection letter 754051 Copperberry 11.25.24
12/12/2024 Report Inspection Report (Engineering Daily Inspection)
12/18/2024 Report Inspection Report (Engineering Daily Inspection)
12/24/2024 Report Inspection Report (Engineering Daily Inspection)
01/31/2025 Report Inspection Report (Engineering Daily Inspection)
02/03/2025 Fire RPBA cert_
02/03/2025 level 3 cert business level 2 cert compitant person 2023
02/04/2025 Report Inspection Report (Engineering Daily Inspection)
02/07/2025 Report Inspection Report (Engineering Daily Inspection)
02/19/2025 SWA - PRCCP20221569 - RECORDED & CCO STAMPED
02/19/2025 Receipt Receipt for transaction:2025-000342
04/04/2025 Letter Inspection Punchlist (Engineering Punchlist Inspection)
04/08/2025 Letter Inspection Punchlist (Engineering Punchlist Inspection)
04/10/2025 Letter Inspection Punchlist (Engineering Punchlist Inspection)
04/10/2025 Letter Inspection Punchlist (Engineering Punchlist Inspection)
04/14/2025 Report 2025-04-09 CopperBerry - Asphalt Compaction Testing Field Report
04/23/2025 Copperberry-Civils-Record Drawing-Final As builts 4-5-25