CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

PRCCP20221725


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCCP20221725
Civil Construction Permit
Closed
COMMUNITY HEALTH CARE
Other
New electrical trenching- Install new sidewalk- Grading for new enclosed stair - COMMUNITY HEALTHCARE - CANNERY BLDG PRCTI20221698STOP WORK ORDER generated on 08/01/2023 by username 'Jeff Hill'.STOP WORK ORDER removed on 09/27/2023 by username 'Jeff Hill'.
11/07/2022
05/22/2023
05/22/2025
01/06/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Public Works Water Review Approved 04/26/2023 05/12/2023
Engineering Traffic Review Approved 05/26/2023 05/11/2023
Engineering Civil Review Approved 05/26/2023 05/11/2023
Planning Review Approved 05/26/2023 05/09/2023
Public Works Streets Review Approved 05/26/2023 05/08/2023
Public Works Collection Review Approved 05/26/2023 05/05/2023
Fire Review Approved 05/26/2023 05/05/2023
Public Works Water Review Approved 05/26/2023 05/02/2023
Public Works Streets Review VOID 04/26/2023 04/25/2023
Engineering Traffic Review Failed 04/26/2023 04/24/2023
Planning Review Approved 04/26/2023 04/11/2023
Public Works Collection Review Approved 04/26/2023 04/06/2023
Engineering Civil Review Approved 04/26/2023 04/06/2023
Fire Review Approved 04/26/2023 04/06/2023
Public Works Streets Review Approved 03/22/2023 03/16/2023
Engineering Traffic Review Failed 03/22/2023 03/16/2023
Planning Review Failed 03/22/2023 03/13/2023
Engineering Civil Review Failed 03/22/2023 03/13/2023
Public Works Collection Review Approved 03/22/2023 03/08/2023
Public Works Water Review Approved 03/22/2023 03/01/2023
Fire Review Approved 03/22/2023 02/23/2023
Planning Review Failed 01/02/2023 01/11/2023
Public Works Collection Review Approved 01/02/2023 01/09/2023
Public Works Streets Review Approved 01/02/2023 01/06/2023
Fire Review Approved 01/02/2023 01/05/2023
Engineering Civil Review Failed 01/02/2023 01/03/2023
Engineering Traffic Review VOID 01/02/2023 12/27/2022
Public Works Water Review Failed 01/02/2023 12/07/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Engineering Inspection Fee (3%) $1,143.20 $1,143.20 Paid 05/18/2023
Engineering Permit Fee $300.00 $300.00 Paid 05/18/2023
Traffic Control Permit Fee $50.00 $50.00 Paid 05/18/2023
Traffic Control Plan Review Fee $40.00 $40.00 Paid 05/18/2023
Civil Review Fee $470.00 $470.00 Paid 03/30/2023
Record Drawing Review Fee $200.00 $200.00 Paid 03/30/2023
Civil Review Additional Fee $360.00 $360.00 Paid 04/11/2023
Civil Review Additional Fee $180.00 $180.00 Paid 05/18/2023
Miscellaneous Fee $363.50 $363.50 Paid 12/31/2024
$180.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Preconstruction Inspection (Pre-Con Meeting) Passed 05/31/2023
Robyn Buck ((253) 435-3617)
Job Start Inspection Stop Work 08/01/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 11/7/2023 11/07/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 11/9/2023 11/09/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 11/13/2023 11/13/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 11/17/2023 11/17/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 12/1/2023 12/01/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 12/8/2023 12/11/2023
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Failed 12/11/2023 12/11/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/11/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
12/11/2023
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 12/18/2023 12/18/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/20/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
12/20/2023
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 12/19/2023 12/20/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/20/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
12/20/2023
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 12/20/2023 12/20/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/20/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
12/20/2023
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 12/27/2023 12/28/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/28/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
12/28/2023
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 12/29/2023 12/29/2023
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
12/29/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
12/29/2023
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 1/2/2024 01/02/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
01/02/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
01/02/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 1/3/2024 01/03/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
01/03/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
01/03/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 1/4/2024 01/04/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
01/04/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
01/04/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 1/8/2024 01/09/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
01/09/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
01/09/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 1/9/2024 01/11/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
01/11/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
01/11/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 1/10/2024 01/11/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
01/11/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
01/11/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 1/16/2024 01/16/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
01/16/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
01/16/2024
install catch basin socks along the frontage.

Erosion And Sediment Inspection Partial Pass 1/16/2024 01/16/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
01/16/2024
Stabilize all exposed soils

Engineering Daily Inspection Partial Pass 1/17/2024 01/18/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
01/18/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
01/18/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 1/22/2024 01/22/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
01/22/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
01/22/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 02/12/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
02/12/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
02/12/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 2/14/2024 02/15/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
02/15/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
02/15/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 2/15/2024 02/15/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
02/15/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
02/15/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 2/16/2024 02/16/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
02/16/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
02/16/2024
install catch basin socks along the frontage.

Engineering Daily Inspection Partial Pass 2/16/2024 02/16/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
02/16/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
02/16/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 3/13/2024 03/13/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
03/13/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
03/13/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 3/22/2024 03/22/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
03/22/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
03/22/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 3/25/2024 03/25/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
03/25/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
03/25/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 3/26/2024 03/27/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
03/27/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
03/27/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 3/27/2024 03/28/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
03/28/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
03/28/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 3/28/2024 03/29/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
03/29/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
03/29/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 3/29/2024 03/29/2024
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
03/29/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
03/29/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 4/1/2024 04/01/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
04/03/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
04/03/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 4/8/2024 04/08/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
04/08/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
04/08/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 4/10/2024 04/11/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
04/11/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
04/11/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 4/11/2024 04/11/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
04/11/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
04/11/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 4/15/2024 04/16/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
04/16/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
04/16/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 4/17/2024 04/17/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
04/17/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
04/17/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 4/18/2024 04/19/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
04/19/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
04/19/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 4/22/2024 04/22/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
04/22/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
04/22/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 7/2/2024 07/03/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
07/03/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
07/03/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Failed 7/3/2024 07/03/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
07/03/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
07/03/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 8/5/2024 08/05/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
08/05/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
08/05/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 8/12/2024 08/12/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
08/12/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
08/12/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 8/15/2024 08/15/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
08/15/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
08/15/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 8/16/2024 08/16/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
08/19/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
08/19/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 8/19/2024 08/20/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
08/20/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
08/20/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 8/20/2024 08/20/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
08/20/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
08/20/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 8/21/2024 08/21/2024
Michael Rosenau ((253) 344-6753)
Corrections:


Other/Miscellaneous
Carried Forward
08/21/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
08/21/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 8/22/2024 08/22/2024
Michael Rosenau ((253) 344-6753)
Corrections:


Other/Miscellaneous
Carried Forward
08/22/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
08/22/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 8/29/2024 08/30/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
08/30/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
08/30/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 9/4/2024 09/05/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
09/05/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
09/05/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 9/16/2024 09/16/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
09/16/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
09/16/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 9/18/2024 09/18/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
09/18/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
09/18/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Daily Inspection Partial Pass 9/30/2024 09/30/2024
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Carried Forward
09/30/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Carried Forward
09/30/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Punchlist Inspection Failed 10/18/2024
Jeff Hill ((253) 204-5633)
Planning Landscape Inspection Failed 11/12/2024
Nabila Comstock ((253) 770-3361)
Corrections:


Other/Miscellaneous
Carried Forward
11/12/2024
Please see attached landscape plan in Documents & Images titled "CHC Landscape Inspection 1 - 11122024" for callout areas where landscaping needs to be addressed. Clouded area on the plan set referenced above area required to be met. Area in the southwest was not replaced with planting after utilities were excavated for. This area is required to be replanted.

Planning Landscape Inspection Passed 12/20/2024
Nabila Comstock ((253) 770-3361)
Corrections:


Other/Miscellaneous
Resolved
12/18/2024
Please see attached landscape plan in Documents & Images titled "CHC Landscape Inspection 1 - 11122024" for callout areas where landscaping needs to be addressed. Clouded area on the plan set referenced above area required to be met. Area in the southwest was not replaced with planting after utilities were excavated for. This area is required to be replanted.

Engineering Final Inspection Passed 01/06/2025
Jeff Hill ((253) 204-5633)
Job Start Inspection Passed 01/06/2025
Jeff Hill ((253) 204-5633)
Erosion And Sediment Inspection Passed 01/06/2025
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Outstanding
01/16/2024
Stabilize all exposed soils

Engineering Daily Inspection Passed 01/06/2025
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Outstanding
09/30/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.

Other/Miscellaneous
Outstanding
09/30/2024
remove temp paving from the water service trench, tee cut, and full depth pave.

Engineering Punchlist Inspection Passed 01/06/2025
Jeff Hill ((253) 204-5633)

Conditions

Condition Status Category
Civil Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard civil construction conditions: 1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work. 2. Construction permitted as per approved civil plans. 3. Construction permit shall expire by limitation and be declared void if: a. Work is not started within 180 days of obtaining the permit. b. Work is abandoned for 180 days or more after beginning work. c. After two years from the date of permit issuance, regardless of whether work is finished. 4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority. 8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval. 9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits. 10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pre-Construction Meeting Resolved Standard Conditions
Engineering Division
Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
Performance Bond Resolved Prior to Issuance
Engineering Division
A Performance Bond must be received by the City of Puyallup prior to permit issuance. The Performance Bond shall be 150% of the estimated cost of work in the ROW per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/16622/Performance-Bond-51122-appvd-by-Legal for more information.
Certificate of Insurance/CG2012 Resolved Prior to Issuance
Engineering Division
Certificate or Insurance/CG2012 must be received prior to issuance
Clear, Fill, and Grade Bond Resolved Prior to Issuance
Engineering Division
NOT NEEDED
Overtime Inspection and Watermain Shutdown Fee Resolved Prior to Issuance
Engineering Division
This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
Miscellaneous Condition Resolved Prior to Issuance
Development & Permitting Services
INDEPENDENT DISCOVERY PLAN SIGNATURE PAGE
Punchlist: Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection Resolved Misc. Punchlist Section A
Development & Permitting Services
Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection. Landscape requirements to be added to the punchlist.
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
Connect southeast corner roof drain and restore area.
Punchlist: Miscellaneous Streets A Item Resolved Street Punchlist Section A
Development & Permitting Services
Replace all damaged 2YY raised pavement markers in W Main
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
Connect all roof drains, install clean out assemblies, and Carson boxes marked C/O.
Punchlist: Miscellaneous A Item Resolved Misc. Punchlist Section A
Development & Permitting Services
repaint all onsite channelization.
Punchlist: Miscellaneous Water B Item Resolved Water Punchlist Section B
Development & Permitting Services
raise the water meter box in the landscaping next to the driveway and replace miss section of the lid.
Punchlist: Miscellaneous Water B Item Resolved Water Punchlist Section B
Development & Permitting Services
RPBA's protective covering does not have a " daylight drain " . See page C3.10 on the civil plans for detail.
Punchlist: Provide the City with an electronic version of the record drawings Resolved Misc. Punchlist Section B
Engineering Division
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
Punchlist: Provide an O&M Manual for the project Resolved Storm Punchlist Section B
Engineering Division
Please submit an operation and maintenance manual that is consistent with the provisions in Volume V of the Stormwater Management Manual for Western Washington (2012) for all stormwater facilities and BMP’s associated with this project. A copy of this operation and maintenance manual shall be retained onsite or within reasonable access to the site and shall be transferred with the property to the new owner.
Punchlist: Provide the City a letter from the Design Engineer for the proper install of the stormwater BMP’s Resolved Storm Punchlist Section A
Engineering Division
Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
Punchlist: Provide the City with a signed stormwater agreement Resolved Storm Punchlist Section B
Engineering Division
Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described in item 3 as a recorded exhibit.
Punchlist: Miscellaneous A Item Resolved Misc. Punchlist Section A
Engineering Division
Northeast area where materials were stored requires stabilization.
Punchlist: Miscellaneous A Item Resolved Misc. Punchlist Section A
Engineering Division
Install casting around clean out in Northwest corner.
Miscellaneous Condition Resolved Prior to Occupancy
Development & Permitting Services
Recording fee for Stormwater Agreement must be paid. [Robin Loewen @ 12/30/2024 4:23 PM]

Related Permit & Planning Applications

Reference Number Status Type
PRCTI20221698 Closed Commercial - Tenant Improvement/Remodel
PRCTI20221714 Closed Commercial - Tenant Improvement/Remodel
PRHM20231549 Closed Hydraulic Modeling
PRFS20231656 Closed Fire Sprinklers
PRFA20231782 Closed Fire Alarms
PRFA20231783 Closed Fire Alarms
PRROW20240592 Closed Right-of-Way Permit

Documents & Images

Date Uploaded File Type Name
11/07/2022 Letter Incomplete Application Notice
11/08/2022 Form Civil Const App - 22-11-07 current
11/09/2022 Report 2019SWMMWW Flow Charts
11/10/2022 Letter Incomplete Application Notice
11/10/2022 Report Geotech Report 20220346E001-002
11/14/2022 Letter Incomplete Application Notice
12/23/2022 Report Factsheet - SWPPP for projects less than 2000 SF
01/11/2023 Letter Permit Review Comment Notice
02/21/2023 Plans CHC Puyallup - Survey
02/22/2023 Letter Incomplete Application Notice
03/16/2023 Letter Permit Review Correction Letter
03/30/2023 Receipt Receipt for transaction:2023-000534
04/11/2023 Receipt Receipt for transaction:2023-000603
04/25/2023 Letter Permit Review Correction Letter
05/15/2023 Form Permit Revisions Form-Civil Correction #3 (Flattened)
05/18/2023 Receipt Receipt for transaction: 2023-000898
05/18/2023 Receipt Receipt for transaction: 2023-000898
05/18/2023 Plans CHC Puyallup Civil Permit Correction #3 4-26-2023 (Stamped)
05/22/2023 Permit Permit - Detailed
05/22/2023 Plans 23-03-27 CHC Puyallup Civil Permit Correction #2 Drawings (LANDSCAPE) (Stamped)
08/01/2023 Report Inspection Report (Job Start Inspection)
09/27/2023 PRCCP20221725 PRE-CONSTRUCTION MEETING-20230927_085010-Meeting Recording
12/11/2023 Report Inspection Report (Engineering Daily Inspection)
01/16/2024 Report Inspection Report (Erosion And Sediment Inspection)
02/15/2024 Report Inspection Report (Engineering Daily Inspection)
02/16/2024 Report Inspection Report (Engineering Daily Inspection)
02/16/2024 Report Inspection Report (Engineering Daily Inspection)
07/03/2024 Report Inspection Report (Engineering Daily Inspection)
10/18/2024 Letter Inspection Punchlist (Engineering Punchlist Inspection)
10/28/2024 Letter Inspection Punchlist
11/12/2024 CHC Landscape Inspection 1 - 11122024
12/31/2024 SWA PRCCP20221725 COMMUNITY HEALTH CARE - RECORDED
12/31/2024 Receipt Receipt for transaction:2024-002690


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.