Engineering Permit Application Status
PRCCP20221725
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Engineering Inspection Fee (3%) | $1,143.20 | $1,143.20 | Paid | 05/18/2023 |
Engineering Permit Fee | $300.00 | $300.00 | Paid | 05/18/2023 |
Traffic Control Permit Fee | $50.00 | $50.00 | Paid | 05/18/2023 |
Traffic Control Plan Review Fee | $40.00 | $40.00 | Paid | 05/18/2023 |
Civil Review Fee | $470.00 | $470.00 | Paid | 03/30/2023 |
Record Drawing Review Fee | $200.00 | $200.00 | Paid | 03/30/2023 |
Civil Review Additional Fee | $360.00 | $360.00 | Paid | 04/11/2023 |
Civil Review Additional Fee | $180.00 | $180.00 | Paid | 05/18/2023 |
Miscellaneous Fee | $363.50 | $363.50 | Paid | 12/31/2024 |
$180.00
|
||||
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $3,106.70 | $3,106.70 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Engineering Preconstruction Inspection (Pre-Con Meeting) | Passed | 05/31/2023 | ||
Robyn Buck ((253) 435-3617) | ||||
Job Start Inspection | Stop Work | 08/01/2023 | ||
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 11/7/2023 | 11/07/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 11/9/2023 | 11/09/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 11/13/2023 | 11/13/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 11/17/2023 | 11/17/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/1/2023 | 12/01/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 12/8/2023 | 12/11/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Failed | 12/11/2023 | 12/11/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/11/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
12/11/2023
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 12/18/2023 | 12/18/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/20/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
12/20/2023
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 12/19/2023 | 12/20/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/20/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
12/20/2023
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 12/20/2023 | 12/20/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/20/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
12/20/2023
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 12/27/2023 | 12/28/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/28/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
12/28/2023
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 12/29/2023 | 12/29/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/29/2023
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
12/29/2023
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 1/2/2024 | 01/02/2024 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/02/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
01/02/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 1/3/2024 | 01/03/2024 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/03/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
01/03/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 1/4/2024 | 01/04/2024 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/04/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
01/04/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 1/8/2024 | 01/09/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/09/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
01/09/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 1/9/2024 | 01/11/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/11/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
01/11/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 1/10/2024 | 01/11/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/11/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
01/11/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 1/16/2024 | 01/16/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/16/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
01/16/2024
install catch basin socks along the frontage.
|
||||
Erosion And Sediment Inspection | Partial Pass | 1/16/2024 | 01/16/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/16/2024
Stabilize all exposed soils
|
||||
Engineering Daily Inspection | Partial Pass | 1/17/2024 | 01/18/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/18/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
01/18/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 1/22/2024 | 01/22/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/22/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
01/22/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 02/12/2024 | ||
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/12/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
02/12/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 2/14/2024 | 02/15/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/15/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
02/15/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 2/15/2024 | 02/15/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/15/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
02/15/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 2/16/2024 | 02/16/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/16/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
02/16/2024
install catch basin socks along the frontage.
|
||||
Engineering Daily Inspection | Partial Pass | 2/16/2024 | 02/16/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/16/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
02/16/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 3/13/2024 | 03/13/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/13/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
03/13/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 3/22/2024 | 03/22/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/22/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
03/22/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 3/25/2024 | 03/25/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/25/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
03/25/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 3/26/2024 | 03/27/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/27/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
03/27/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 3/27/2024 | 03/28/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/28/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
03/28/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 3/28/2024 | 03/29/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/29/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
03/29/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 3/29/2024 | 03/29/2024 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/29/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
03/29/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 4/1/2024 | 04/01/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/03/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
04/03/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 4/8/2024 | 04/08/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/08/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
04/08/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 4/10/2024 | 04/11/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/11/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
04/11/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 4/11/2024 | 04/11/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/11/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
04/11/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 4/15/2024 | 04/16/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/16/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
04/16/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 4/17/2024 | 04/17/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/17/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
04/17/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 4/18/2024 | 04/19/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/19/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
04/19/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 4/22/2024 | 04/22/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/22/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
04/22/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 7/2/2024 | 07/03/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/03/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
07/03/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Failed | 7/3/2024 | 07/03/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/03/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
07/03/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 8/5/2024 | 08/05/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/05/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
08/05/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 8/12/2024 | 08/12/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/12/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
08/12/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 8/15/2024 | 08/15/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/15/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
08/15/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 8/16/2024 | 08/16/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/19/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
08/19/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 8/19/2024 | 08/20/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/20/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
08/20/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 8/20/2024 | 08/20/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/20/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
08/20/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 8/21/2024 | 08/21/2024 | |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/21/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
08/21/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 8/22/2024 | 08/22/2024 | |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/22/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
08/22/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 8/29/2024 | 08/30/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/30/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
08/30/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 9/4/2024 | 09/05/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/05/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
09/05/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 9/16/2024 | 09/16/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/16/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
09/16/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 9/18/2024 | 09/18/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/18/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
09/18/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Daily Inspection | Partial Pass | 9/30/2024 | 09/30/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/30/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Carried Forward
09/30/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Punchlist Inspection | Failed | 10/18/2024 | ||
Jeff Hill ((253) 204-5633) | ||||
Planning Landscape Inspection | Failed | 11/12/2024 | ||
Nabila Comstock ((253) 770-3361) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/12/2024
Please see attached landscape plan in Documents & Images titled "CHC Landscape Inspection 1 - 11122024" for callout areas where landscaping needs to be addressed.
Clouded area on the plan set referenced above area required to be met. Area in the southwest was not replaced with planting after utilities were excavated for. This area is required to be replanted.
|
||||
Planning Landscape Inspection | Passed | 12/20/2024 | ||
Nabila Comstock ((253) 770-3361) | ||||
Corrections:
Other/Miscellaneous
Resolved
12/18/2024
Please see attached landscape plan in Documents & Images titled "CHC Landscape Inspection 1 - 11122024" for callout areas where landscaping needs to be addressed.
Clouded area on the plan set referenced above area required to be met. Area in the southwest was not replaced with planting after utilities were excavated for. This area is required to be replanted.
|
||||
Engineering Final Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) | ||||
Job Start Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) | ||||
Erosion And Sediment Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Outstanding
01/16/2024
Stabilize all exposed soils
|
||||
Engineering Daily Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Outstanding
09/30/2024
When blocking the sidewalk the contractor must have sidewalk closed ahead, sidewalk closed , and a pedestrian detour set up.
|
||||
Other/Miscellaneous
Outstanding
09/30/2024
remove temp paving from the water service trench, tee cut, and full depth pave.
|
||||
Engineering Punchlist Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) |
Condition | Status | Category |
---|---|---|
Civil Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard civil construction conditions:
1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
2. Construction permitted as per approved civil plans.
3. Construction permit shall expire by limitation and be declared void if:
a. Work is not started within 180 days of obtaining the permit.
b. Work is abandoned for 180 days or more after beginning work.
c. After two years from the date of permit issuance, regardless of whether work is finished.
4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review.
6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority.
8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval.
9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits.
10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
||
Pre-Construction Meeting | Resolved | Standard Conditions |
Engineering Division
Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
|
||
Performance Bond | Resolved | Prior to Issuance |
Engineering Division
A Performance Bond must be received by the City of Puyallup prior to permit issuance. The Performance Bond shall be 150% of the estimated cost of work in the ROW per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/16622/Performance-Bond-51122-appvd-by-Legal for more information.
|
||
Certificate of Insurance/CG2012 | Resolved | Prior to Issuance |
Engineering Division
Certificate or Insurance/CG2012 must be received prior to issuance
|
||
Clear, Fill, and Grade Bond | Resolved | Prior to Issuance |
Engineering Division
NOT NEEDED
|
||
Overtime Inspection and Watermain Shutdown Fee | Resolved | Prior to Issuance |
Engineering Division
This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Development & Permitting Services
INDEPENDENT DISCOVERY PLAN SIGNATURE PAGE
|
||
Punchlist: Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection | Resolved | Misc. Punchlist Section A |
Development & Permitting Services
Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection. Landscape requirements to be added to the punchlist.
|
||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
Development & Permitting Services
Connect southeast corner roof drain and restore area.
|
||
Punchlist: Miscellaneous Streets A Item | Resolved | Street Punchlist Section A |
Development & Permitting Services
Replace all damaged 2YY raised pavement markers in W Main
|
||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
Development & Permitting Services
Connect all roof drains, install clean out assemblies, and Carson boxes marked C/O.
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Development & Permitting Services
repaint all onsite channelization.
|
||
Punchlist: Miscellaneous Water B Item | Resolved | Water Punchlist Section B |
Development & Permitting Services
raise the water meter box in the landscaping next to the driveway and replace miss section of the lid.
|
||
Punchlist: Miscellaneous Water B Item | Resolved | Water Punchlist Section B |
Development & Permitting Services
RPBA's protective covering does not have a " daylight drain " .
See page C3.10 on the civil plans for detail.
|
||
Punchlist: Provide the City with an electronic version of the record drawings | Resolved | Misc. Punchlist Section B |
Engineering Division
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
|
||
Punchlist: Provide an O&M Manual for the project | Resolved | Storm Punchlist Section B |
Engineering Division
Please submit an operation and maintenance manual that is consistent with the provisions in Volume V of the Stormwater Management Manual for Western Washington (2012) for all stormwater facilities and BMP’s associated with this project. A copy of this operation and maintenance manual shall be retained onsite or within reasonable access to the site and shall be transferred with the property to the new owner.
|
||
Punchlist: Provide the City a letter from the Design Engineer for the proper install of the stormwater BMP’s | Resolved | Storm Punchlist Section A |
Engineering Division
Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
|
||
Punchlist: Provide the City with a signed stormwater agreement | Resolved | Storm Punchlist Section B |
Engineering Division
Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described in item 3 as a recorded exhibit.
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Engineering Division
Northeast area where materials were stored requires stabilization.
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Engineering Division
Install casting around clean out in Northwest corner.
|
||
Miscellaneous Condition | Resolved | Prior to Occupancy |
Development & Permitting Services
Recording fee for Stormwater Agreement must be paid. [Robin Loewen @ 12/30/2024 4:23 PM]
|
Reference Number | Status | Type |
---|---|---|
PRCTI20221698 | Closed | Commercial - Tenant Improvement/Remodel |
PRCTI20221714 | Closed | Commercial - Tenant Improvement/Remodel |
PRHM20231549 | Closed | Hydraulic Modeling |
PRFS20231656 | Closed | Fire Sprinklers |
PRFA20231782 | Closed | Fire Alarms |
PRFA20231783 | Closed | Fire Alarms |
PRROW20240592 | Closed | Right-of-Way Permit |