Permit Application Status
PRCTI20221698
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 11/01/2022 |
AC Unit Fee | $58.65 | $58.65 | Paid | 05/18/2023 |
Air Handling Unit (Up to 10,000 cfm) Fee | $197.40 | $197.40 | Paid | 05/18/2023 |
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee | $143.80 | $143.80 | Paid | 05/18/2023 |
Mechanical Duct Work Fee | $14.10 | $14.10 | Paid | 05/18/2023 |
Building Permit Fee | $14,058.50 | $14,058.50 | Paid | 05/18/2023 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 05/18/2023 |
Backflow Preventor Fee | $26.00 | $26.00 | Paid | 05/18/2023 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 05/18/2023 |
Dental Chair or Unit Fee | $483.00 | $483.00 | Paid | 05/18/2023 |
Drinking Fountain, Water Cooler, Ice Machine Fee | $80.50 | $80.50 | Paid | 05/18/2023 |
Medical Gas Piping System Fee | $80.00 | $80.00 | Paid | 05/18/2023 |
Plumbing Fixtures Fee | $907.53 | $907.53 | Paid | 05/18/2023 |
$1,105.00
|
||||
Surgical Vacuum System Fee | $80.00 | $80.00 | Paid | 05/18/2023 |
Water Heater Fee | $26.00 | $26.00 | Paid | 05/18/2023 |
Building Plan Review Fee | $9,138.03 | $9,138.03 | Paid | 11/01/2022 |
Mechanical Plan Review Fee | $295.07 | $295.07 | Paid | 11/01/2022 |
Plumbing Plan Review Fee | $1,248.33 | $1,248.33 | Paid | 11/01/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 05/18/2023 |
Plumbing Fixtures Fee | $197.47 | $197.47 | Paid | 11/01/2022 |
$1,105.00
|
||||
Resubmittal Fee | $130.00 | $130.00 | Paid | 01/11/2023 |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $85,860.10 | $85,860.10 | Paid | 05/18/2023 |
Water System Development ChargeFee - Tenant Improvment/Addition | $34,261.78 | $34,261.78 | Paid | 05/18/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 02/06/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 03/30/2023 |
Traffic Impact Fee (Commercial) | $147,150.00 | $147,150.00 | Paid | 05/18/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 04/25/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 01/26/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 02/29/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 11/13/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 01/07/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $295,966.26 | $295,966.26 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Plumbing Below Slab Inspection | Not Ready | 11/20/2023 | 11/20/2023 | 11/20/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/20/2023
talked about temporary waste pipe for testing purposes only
|
||||
Plumbing Below Slab Inspection | Partial Pass | 11/27/2023 | 11/27/2023 | 11/28/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/28/2023
1. below slab plumbing approved as noted on city approved plans page P 103
2.area where pipe is reduced in size for testing purposes only due to conflict with electrical conduit not approved
3. provide as-built of underslab plumbing from engineer of record at time of slab infill inspection
|
||||
Slab/Insulation Inspection | Partial Pass | 12/4/2023 | 12/4/2023 | 12/04/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/04/2023
1:slab pour back ok
|
||||
Plumbing Rough In Inspection | Partial Pass | 12/4/2023 | 12/4/2023 | 12/04/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/04/2023
temp drain bypass ok
|
||||
Frame Inspection | Partial Pass | 1/3/2024 | 1/3/2024 | 01/03/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/03/2024
1:hat channel on lids in 6 quite rooms ok as follows, 142 , 141, 140, 149, 121, and 104
|
||||
Plumbing Below Slab Inspection | Partial Pass | 1/12/2024 | 1/12/2024 | 01/16/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/16/2024
1. below slab plumbing approved as noted on city approved plans page P 103
2.area where pipe is reduced in size for testing purposes only due to conflict with electrical conduit not approved
3. provide as-built of underslab plumbing from engineer of record at time of slab infill inspection
|
||||
Other/Miscellaneous
Carried Forward
01/16/2024
below floor dwv approved from 10 line south
|
||||
Mechanical Rough In Inspection | Partial Pass | 1/18/2024 | 1/18/2024 | 01/18/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/18/2024
ducts above hard lid room 149 ok
|
||||
Frame Inspection | Partial Pass | 1/24/2024 | 1/24/2024 | 01/24/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/24/2024
head of wall ok
|
||||
Wallboard / Drywall Inspection | Partial Pass | 2/8/2024 | 2/8/2024 | 02/08/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/08/2024
1. ceiling only in rooms with 2 layers on first floor 1st layer approved
|
||||
Wallboard / Drywall Inspection | Partial Pass | 2/13/2024 | 2/13/2024 | 02/13/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
02/13/2024
1. ceiling only in rooms with 2 layers on first floor 1st layer approved
|
||||
Other/Miscellaneous
Carried Forward
02/13/2024
rock on lids in 6 rooms ok, 140 , 141, 142, 149, 104 and 121
|
||||
Plumbing Rough In Inspection | Partial Pass | 2/26/2024 | 2/26/2024 | 02/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/26/2024
1st floor supply and dwv 10 line south ok.
|
||||
Medical Gas Inspection | Partial Pass | 2/29/2024 | 2/29/2024 | 02/29/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/29/2024
pressure test on o2 oxy and dental air 1st test ok at 150 psi
|
||||
Gas Test Inspection | Partial Pass | 3/1/2024 | 3/1/2024 | 03/01/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/01/2024
2ND OF TWO TEST ON PRESSURE ONLY FOR DENTAL AIR, O2 AND OXY OK AT 150 PSI, COMPLETE MED GAS TESTING WITH THIRD PARTY.
|
||||
Frame Inspection | Not Ready | 3/4/2024 | 3/4/2024 | 03/04/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/04/2024
1. cancelled on site by contractor
|
||||
Frame Inspection | Partial Pass | 3/6/2024 | 3/6/2024 | 03/06/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/06/2024
this inspection is for first floor from grid line 10 to south exterior to include one side of wall of corridor to north
1.room 141 provide nail plate at plumbing by sink
2.room 142 complete head out mech in wall
3. room 149 complete fastener at studs in NE corner
4.provide floor support at west exterior wall as discussed with contractor
5.room 128 provide nail plate at plumbing at sink
6.in corridor at north wall at room 136 provide nail plate at plumbing
7. ok to insulate
|
||||
Frame Inspection | Partial Pass | 3/7/2024 | 3/7/2024 | 03/07/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/07/2024
1. cancelled on site by contractor
|
||||
Other/Miscellaneous
Carried Forward
03/07/2024
1:corrections from previous frame ok
2:provide structural approval on bearing of floor/ceiling joist at west wall.
|
||||
Plumbing Rough In Inspection | Partial Pass | 3/7/2024 | 3/7/2024 | 03/07/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/07/2024
1:provide 10ft head test on dwv 10 to 1 line d to g line
2:supply ok at 100 psi
|
||||
Frame Inspection | Partial Pass | 3/11/2024 | 3/11/2024 | 03/11/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/11/2024
this inspection is for first floor from grid line 10 to south exterior to include one side of wall of corridor to north
1.room 141 provide nail plate at plumbing by sink
2.room 142 complete head out mech in wall
3. room 149 complete fastener at studs in NE corner
4.provide floor support at west exterior wall as discussed with contractor
5.room 128 provide nail plate at plumbing at sink
6.in corridor at north wall at room 136 provide nail plate at plumbing
7. ok to insulate
|
||||
Other/Miscellaneous
Carried Forward
03/11/2024
frame zone 2 and 3 minus hard lid ok.
|
||||
Plumbing Rough In Inspection | Partial Pass | 3/11/2024 | 3/11/2024 | 03/11/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/11/2024
1: 1 to 10 line -d- to -g- line dwv approved.
|
||||
Energy (Insulation) Inspection | Not Ready | 3/12/2024 | 3/12/2024 | 03/12/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/12/2024
1. cancelled on site by contractor
|
||||
Wallboard / Drywall Inspection | Partial Pass | 3/12/2024 | 3/12/2024 | 03/12/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/12/2024
1. zone 1 no exteriors approved
2.rooms 127A and 126A first layer approved
|
||||
Energy (Insulation) Inspection | Partial Pass | 3/13/2024 | 3/13/2024 | 03/13/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/13/2024
1. cancelled on site by contractor
|
||||
Other/Miscellaneous
Carried Forward
03/13/2024
1. zone 1 exterior walls approved
|
||||
Wallboard / Drywall Inspection | Partial Pass | 3/15/2024 | 3/15/2024 | 03/15/2024 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/15/2024
1. zone 1 no exteriors approved
2.rooms 127A and 126A first layer approved
|
||||
Energy (Insulation) Inspection | Failed | 3/18/2024 | 3/18/2024 | 03/18/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/18/2024
1. zone 1 exterior walls approved
|
||||
Other/Miscellaneous
Carried Forward
03/18/2024
1.remove drywall in zones 3 and 4 where covered with out inspections as discussed with contractor
|
||||
Frame Inspection | Partial Pass | 3/19/2024 | 3/19/2024 | 03/19/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/19/2024
1. complete ductwork in ceiling
2. not ready
|
||||
Energy (Insulation) Inspection | Partial Pass | 3/19/2024 | 3/19/2024 | 03/19/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/19/2024
1.remove drywall in zones 3 and 4 where covered with out inspections as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
03/19/2024
1. exterior walls zones 3 and 4 first floor approved
|
||||
Plumbing Rough In Inspection | Partial Pass | 3/21/2024 | 3/21/2024 | 03/21/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/21/2024
1.zone 4 NE CORNER OF first floor grid line c 1-4 DWV approved
2.supply approved at 100 psi
|
||||
Mechanical Rough In Inspection | Partial Pass | 3/22/2024 | 3/22/2024 | 03/26/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/26/2024
FIRST FLOOR
1.zone 1 to include rooms with hard lids 138, 137, 132
2. zone 2 to include rooms with hard lids 131,130
3. zone 3 to include rooms with hard lids 113, 109
4. zone 4 partial rooms 106, 105, 104, 103 and o1a hallway and work room 102
5. ok to insulate
|
||||
Combination Frame And Rough In Inspection | Partial Pass | 3/27/2024 | 3/27/2024 | 03/28/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/28/2024
FIRST FLOOR
1.hard lids in rooms 109, 113, 130, 131, 132, 137, 138, mech and framing approved
|
||||
Wallboard / Drywall Inspection | Passed | 3/27/2024 | 3/27/2024 | 03/28/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/15/2024
1. zone 1 no exteriors approved
2.rooms 127A and 126A first layer approved
|
||||
Other/Miscellaneous
Outstanding
03/28/2024
zones 3 and 4 exterior walls nailing only approved
|
||||
Frame Inspection | Not Ready | 4/2/2024 | 4/2/2024 | 04/02/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
04/02/2024
1. this was a drywall inspection for nailing
2.complete fasteners as discussed with contractor zones 3 and 4
|
||||
Mechanical Rough In Inspection | Not Ready | 4/2/2024 | 4/2/2024 | 04/02/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
04/02/2024
FIRST FLOOR
1.zone 1 to include rooms with hard lids 138, 137, 132
2. zone 2 to include rooms with hard lids 131,130
3. zone 3 to include rooms with hard lids 113, 109
4. zone 4 partial rooms 106, 105, 104, 103 and o1a hallway and work room 102
5. ok to insulate
|
||||
Other/Miscellaneous
Carried Forward
04/02/2024
1. cancelled on site by contractor
|
||||
Frame Inspection | Passed w/ Conditions | 4/3/2024 | 4/3/2024 | 04/04/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
04/04/2024
this was a drywall inspection
1.complete nailing of drywall as discussed with contractor
|
||||
Mechanical Rough In Inspection | Partial Pass | 4/3/2024 | 4/3/2024 | 04/04/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
04/04/2024
1. cancelled on site by contractor
|
||||
Other/Miscellaneous
Carried Forward
04/04/2024
zones 1 and 2 condensate line approved ok to insulate
|
||||
Mechanical Rough In Inspection | Partial Pass | 4/5/2024 | 4/5/2024 | 04/05/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
04/05/2024
zones 1 and 2 condensate line approved ok to insulate
|
||||
Other/Miscellaneous
Carried Forward
04/05/2024
1. zones 3 and 4 condensate lines approved first floor
|
||||
Wallboard / Drywall Inspection | Partial Pass | 4/9/2024 | 4/9/2024 | 04/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/09/2024
1. rooms with 2nd layer non rated first floor progression inspection approved
|
||||
Slab/Insulation Inspection | Not Ready | 4/16/2024 | 4/16/2024 | 04/16/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/16/2024
1. complete footings per city approved plans
2. provide special inspection approval reports supporting work in this area at time of next inspection
3. do not pour
|
||||
Foundation/Rebar Inspection | Not Ready | 4/17/2024 | 4/17/2024 | 04/17/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/17/2024
1. cancelled on site by contractor
|
||||
Plumbing Below Slab Inspection | Partial Pass | 4/17/2024 | 4/17/2024 | 04/17/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/17/2024
1. this inspection was for vacuum system for dental area
2. point of use to vacuum pump tested at 5 PSI approved
|
||||
Frame Inspection | Partial Pass | 4/24/2024 | 4/24/2024 | 04/25/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
04/25/2024
1. complete ductwork in ceiling
2. not ready
|
||||
Other/Miscellaneous
Carried Forward
04/25/2024
2nd FLOOR
1. zones 1 and 2 top of wall head out one side and room 248 entire inside ok to hang drywall as discussed with contractor
|
||||
Slab/Insulation Inspection | Partial Pass | 4/24/2024 | 4/24/2024 | 04/25/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
04/25/2024
1. complete footings per city approved plans
2. provide special inspection approval reports supporting work in this area at time of next inspection
3. do not pour
|
||||
Other/Miscellaneous
Carried Forward
04/25/2024
1 north stairwell slab approved to pour per special inspections
|
||||
Wallboard / Drywall Inspection | Partial Pass | 4/29/2024 | 4/29/2024 | 04/29/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
04/29/2024
1. rooms with 2nd layer non rated first floor progression inspection approved
|
||||
Other/Miscellaneous
Carried Forward
04/29/2024
1. 2nd floor zone 1 top out at head of wall and electrical room inside only approved
|
||||
Frame Inspection | Failed | 5/1/2024 | 5/1/2024 | 05/01/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
05/01/2024
2nd FLOOR
1. zones 1 and 2 top of wall head out one side and room 248 entire inside ok to hang drywall as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
05/01/2024
1.complete nailing of shear wall per city approved plans on 2nd floor
2.complete fastening of shear wall at top plate per RFI on 2nd floor
|
||||
Shear Wall Inspection | Partial Pass | 5/2/2024 | 5/2/2024 | 05/02/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/02/2024
2nd floor
1.shear wall approved per special inspection
|
||||
Wallboard / Drywall Inspection | Not Ready | 5/2/2024 | 5/2/2024 | 05/02/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
05/02/2024
1. 2nd floor zone 1 top out at head of wall and electrical room inside only approved
|
||||
Other/Miscellaneous
Carried Forward
05/02/2024
1. called in in error
|
||||
Frame Inspection | Partial Pass | 5/3/2024 | 5/3/2024 | 05/04/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
05/04/2024
1.complete nailing of shear wall per city approved plans on 2nd floor
2.complete fastening of shear wall at top plate per RFI on 2nd floor
|
||||
Other/Miscellaneous
Carried Forward
05/04/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Plumbing Rough In Inspection | Partial Pass | 5/9/2024 | 5/9/2024 | 05/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/09/2024
1.zone 4 NE CORNER OF first floor grid line c 1-4 DWV approved
2.supply approved at 100 psi
|
||||
Other/Miscellaneous
Carried Forward
05/09/2024
2ND FLOOR
1. supply zones 1,2 and part of zone 3 approved at 100 PSI as marked up on city approved plans PS 2.02
2. DWV approved zones 1,2 and part of zone 3 approved as marked up on city approved plans PS 2.02
|
||||
Wallboard / Drywall Inspection | Partial Pass | 5/9/2024 | 5/9/2024 | 05/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
05/09/2024
1. called in in error
|
||||
Other/Miscellaneous
Carried Forward
05/09/2024
1. level 2 zones 1, 2, head of wall progresion inspection approved
2. remove drywall where framing was not passed off for inspection
|
||||
Frame Inspection | Partial Pass | 5/13/2024 | 5/13/2024 | 05/13/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/13/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
05/13/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Combination Frame And Rough In Inspection | Partial Pass | 5/16/2024 | 5/16/2024 | 05/16/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
05/16/2024
FIRST FLOOR
1.hard lids in rooms 109, 113, 130, 131, 132, 137, 138, mech and framing approved
|
||||
Other/Miscellaneous
Carried Forward
05/16/2024
2ND FLOOR
1. zones 1 and 2 wall framing only approved
|
||||
Plumbing Rough In Inspection | Partial Pass | 5/17/2024 | 5/17/2024 | 05/17/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/17/2024
1.zone 4 NE CORNER OF first floor grid line c 1-4 DWV approved
2.supply approved at 100 psi
|
||||
Other/Miscellaneous
Carried Forward
05/17/2024
2ND FLOOR
1. supply zones 1,2 and part of zone 3 approved at 100 PSI as marked up on city approved plans PS 2.02
2. DWV approved zones 1,2 and part of zone 3 approved as marked up on city approved plans PS 2.02
|
||||
Other/Miscellaneous
Carried Forward
05/17/2024
2ND FLOOR
1.zone 3 room 206 dental flex DWF approved no supply
2.zone 4 80% of framing was not done at time of inspection DWV approved no supply
|
||||
Frame Inspection | Partial Pass | 5/20/2024 | 5/20/2024 | 05/20/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/20/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
05/20/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
05/20/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Plumbing Rough In Inspection | Partial Pass | 5/22/2024 | 5/22/2024 | 05/23/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/23/2024
1.zone 4 NE CORNER OF first floor grid line c 1-4 DWV approved
2.supply approved at 100 psi
|
||||
Other/Miscellaneous
Carried Forward
05/23/2024
2ND FLOOR
1. supply zones 1,2 and part of zone 3 approved at 100 PSI as marked up on city approved plans PS 2.02
2. DWV approved zones 1,2 and part of zone 3 approved as marked up on city approved plans PS 2.02
|
||||
Other/Miscellaneous
Carried Forward
05/23/2024
2ND FLOOR
1.zone 3 room 206 dental flex DWF approved no supply
2.zone 4 80% of framing was not done at time of inspection DWV approved no supply
|
||||
Other/Miscellaneous
Carried Forward
05/23/2024
inspection date 5/22/2024
2ND FLOOR
1.zone 3 room 206 dental flex supply approved
2.zone 4 supply approved at 100 PSI
|
||||
Energy (Insulation) Inspection | Partial Pass | 5/23/2024 | 5/23/2024 | 05/24/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/24/2024
1. exterior walls zones 3 and 4 first floor approved
|
||||
Other/Miscellaneous
Carried Forward
05/24/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 exterior wall fill ins approved
|
||||
Frame Inspection | Failed | 5/23/2024 | 5/23/2024 | 05/24/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/24/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
05/24/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
05/24/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
05/24/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Wallboard / Drywall Inspection | Partial Pass | 5/29/2024 | 5/29/2024 | 05/29/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/29/2024
1. level 2 zones 1, 2, head of wall progresion inspection approved
2. remove drywall where framing was not passed off for inspection
|
||||
Other/Miscellaneous
Carried Forward
05/29/2024
2ND FLOOR
1.zones 1 and 2 areas with 2 layers first layer approved
|
||||
Plumbing Below Slab Inspection | Partial Pass | 5/31/2024 | 5/31/2024 | 05/31/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
05/31/2024
1. this inspection was for vacuum system for dental area
2. point of use to vacuum pump tested at 5 PSI approved
|
||||
Other/Miscellaneous
Carried Forward
05/31/2024
FIRST FLOOR
1.DWV tie in under slab far west corridor where conflict with electrical conduit was approved
|
||||
Frame Inspection | Not Ready | 5/31/2024 | 5/31/2024 | 05/31/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/31/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
05/31/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
05/31/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
05/31/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Other/Miscellaneous
Carried Forward
05/31/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Wallboard / Drywall Inspection | Partial Pass | 5/31/2024 | 5/31/2024 | 05/31/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/31/2024
1. level 2 zones 1, 2, head of wall progresion inspection approved
2. remove drywall where framing was not passed off for inspection
|
||||
Other/Miscellaneous
Carried Forward
05/31/2024
2ND FLOOR
1.zones 1 and 2 areas with 2 layers first layer approved
|
||||
Other/Miscellaneous
Carried Forward
05/31/2024
inspection date 5/31/2024
2ND FLOOR
1. zones 1 all first layer area to include exterior infills and 2nd layer areas approved
|
||||
Frame Inspection | Not Ready | 6/3/2024 | 6/3/2024 | 06/03/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/03/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
06/03/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
06/03/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
06/03/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Other/Miscellaneous
Carried Forward
06/03/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
06/03/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Mechanical Rough In Inspection | Partial Pass | 6/4/2024 | 6/4/2024 | 06/05/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/05/2024
1. zones 3 and 4 condensate lines approved first floor
|
||||
Other/Miscellaneous
Carried Forward
06/05/2024
2ND FLOOR
1.zone 1 patience bathroom room 230 hard lid area mech approved
2.zone 2 staff bathrooms rooms 214, 215 hard lids mech approved
|
||||
Wallboard / Drywall Inspection | Partial Pass | 6/5/2024 | 6/5/2024 | 06/05/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/05/2024
1. level 2 zones 1, 2, head of wall progresion inspection approved
2. remove drywall where framing was not passed off for inspection
|
||||
Other/Miscellaneous
Carried Forward
06/05/2024
2ND FLOOR
1.zones 1 and 2 areas with 2 layers first layer approved
|
||||
Other/Miscellaneous
Carried Forward
06/05/2024
inspection date 5/31/2024
2ND FLOOR
1. zones 1 all first layer area to include exterior infills and 2nd layer areas approved
|
||||
Other/Miscellaneous
Carried Forward
06/05/2024
2ND FLOOR
1. zone 2 first layer walls only approved accept for room 224 and staff bathrooms
|
||||
Frame Inspection | Partial Pass | 6/6/2024 | 6/6/2024 | 06/07/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/07/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
06/07/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
06/07/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
06/07/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Other/Miscellaneous
Carried Forward
06/07/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
06/07/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Other/Miscellaneous
Carried Forward
06/07/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Wallboard / Drywall Inspection | Passed | 6/10/2024 | 6/10/2024 | 06/11/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/05/2024
1. level 2 zones 1, 2, head of wall progresion inspection approved
2. remove drywall where framing was not passed off for inspection
|
||||
Other/Miscellaneous
Outstanding
06/05/2024
2ND FLOOR
1.zones 1 and 2 areas with 2 layers first layer approved
|
||||
Other/Miscellaneous
Outstanding
06/05/2024
inspection date 5/31/2024
2ND FLOOR
1. zones 1 all first layer area to include exterior infills and 2nd layer areas approved
|
||||
Other/Miscellaneous
Outstanding
06/05/2024
2ND FLOOR
1. zone 2 first layer walls only approved accept for room 224 and staff bathrooms
|
||||
Other/Miscellaneous
Outstanding
06/11/2024
date of inspection 6/10/2024
2nd floor
1. zone 2 2nd layer approved
|
||||
Frame Inspection | Partial Pass | 6/10/2024 | 6/10/2024 | 06/11/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/11/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
06/11/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
06/11/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
06/11/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Other/Miscellaneous
Carried Forward
06/11/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
06/11/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Other/Miscellaneous
Carried Forward
06/11/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
06/11/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Frame Inspection | Partial Pass | 6/17/2024 | 6/17/2024 | 06/17/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/17/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Mechanical Rough In Inspection | Not Ready | 6/17/2024 | 6/17/2024 | 06/17/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/17/2024
1.called in in error
|
||||
Wallboard / Drywall Inspection | Partial Pass | 6/17/2024 | 6/17/2024 | 06/17/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/17/2024
2nd floor
zone 4
1.hard lid to structure approved
zone 2
1.rooms 229, 217, 214,215 hard lids approved
zone 1
1.room 239 hard lid approved
|
||||
Wallboard / Drywall Inspection | Partial Pass | 6/21/2024 | 6/21/2024 | 06/21/2024 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/21/2024
2nd floor
zone 4
1.hard lid to structure approved
zone 2
1.rooms 229, 217, 214,215 hard lids approved
zone 1
1.room 239 hard lid approved
|
||||
Frame Inspection | Partial Pass | 6/21/2024 | 6/21/2024 | 06/21/2024 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/21/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
06/21/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
06/21/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
06/21/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Other/Miscellaneous
Carried Forward
06/21/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
06/21/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Other/Miscellaneous
Carried Forward
06/21/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
06/21/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Carried Forward
06/21/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Mechanical Rough In Inspection | Not Ready | 6/10/2024 | 6/13/2024 | 06/26/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/05/2024
1. zones 3 and 4 condensate lines approved first floor
|
||||
Other/Miscellaneous
Outstanding
06/05/2024
2ND FLOOR
1.zone 1 patience bathroom room 230 hard lid area mech approved
2.zone 2 staff bathrooms rooms 214, 215 hard lids mech approved
|
||||
Energy (Insulation) Inspection | Partial Pass | 6/26/2024 | 6/26/2024 | 06/26/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/26/2024
1. exterior walls zones 3 and 4 first floor approved
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 exterior wall fill ins approved
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
date of inspection 6/26/2024
1.2nd floor zone 3 exterior wall fill ins approved
|
||||
Frame Inspection | Not Ready | 6/26/2024 | 6/26/2024 | 06/26/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/26/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Other/Miscellaneous
Carried Forward
06/26/2024
date of inspection 6/26/2024
1. cancelled by contractor on site
|
||||
Shear Wall Inspection | Partial Pass | 7/1/2024 | 7/1/2024 | 07/01/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/01/2024
2nd floor
1.shear wall approved per special inspection
|
||||
Other/Miscellaneous
Carried Forward
07/01/2024
date of inspection 6/28/2024
level 2
1. existing shear wall repairs between zone 2 and 3 approved
|
||||
Mechanical Rough In Inspection | Partial Pass | 7/3/2024 | 7/3/2024 | 07/03/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/03/2024
1:2nd floor zones 1&2 and part of 3 minus 217, 218, 219 and 211, 212, 213 and hallway 20 a ok to insulate ductwork.
|
||||
Wallboard / Drywall Inspection | Partial Pass | 7/8/2024 | 7/8/2024 | 07/08/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/08/2024
2nd floor
zone 4
1.hard lid to structure approved
zone 2
1.rooms 229, 217, 214,215 hard lids approved
zone 1
1.room 239 hard lid approved
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
date of inspection 7/8/2024
2nd floor zone 3 walls approved except where no walls are framed due to ceiling not complete
|
||||
Frame Inspection | Failed | 7/8/2024 | 7/8/2024 | 07/08/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/08/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
date of inspection 6/26/2024
1. cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
07/08/2024
date of inspection 7/8/2024
2nd floor reception area ceiling
1. provide as-built approval for ceiling as discussed with contractor
|
||||
Mechanical Rough In Inspection | Partial Pass | 7/9/2024 | 7/9/2024 | 07/09/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/17/2024
1.called in in error
|
||||
Other/Miscellaneous
Outstanding
07/09/2024
1:condensate lines zone 3 and 4 2nd floor ok at 100 psi
|
||||
Energy (Insulation) Inspection | Partial Pass | 7/11/2024 | 7/11/2024 | 07/11/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/11/2024
1. exterior walls zones 3 and 4 first floor approved
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 exterior wall fill ins approved
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
date of inspection 6/26/2024
1.2nd floor zone 3 exterior wall fill ins approved
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
1:zone 4 level 2 fill ins ok
|
||||
Mechanical Rough In Inspection | Partial Pass | 7/11/2024 | 7/11/2024 | 07/11/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/11/2024
1:reception area zone 4 level 1 ok to insulate duck work
|
||||
Frame Inspection | Partial Pass | 7/11/2024 | 7/11/2024 | 07/11/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/11/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
date of inspection 6/26/2024
1. cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
date of inspection 7/8/2024
2nd floor reception area ceiling
1. provide as-built approval for ceiling as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/11/2024
1:zone 4 level 2 to include the 3 hard lids ok
|
||||
Wallboard / Drywall Inspection | Partial Pass | 7/12/2024 | 7/12/2024 | 07/12/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/12/2024
2nd floor
zone 4
1.hard lid to structure approved
zone 2
1.rooms 229, 217, 214,215 hard lids approved
zone 1
1.room 239 hard lid approved
|
||||
Other/Miscellaneous
Carried Forward
07/12/2024
date of inspection 7/8/2024
2nd floor zone 3 walls approved except where no walls are framed due to ceiling not complete
|
||||
Other/Miscellaneous
Carried Forward
07/12/2024
zone 4 level 2 1st layer on lid of reception area ok, 1st layer on walls 259, 258 and 254,
|
||||
Frame Inspection | Partial Pass | 7/16/2024 | 7/16/2024 | 07/16/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/16/2024
2 floor
1. zone one top out only both sides approved except where plumbing has not been tested
2.zone 2 top out both sides approved except where plumbing has not been signed off and where noted in yellow high ligter on field drawings sheet A2.o1b
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
2ND FLOOR
1.zone 3 top of wall top out only accept where plumbing has not been tested approved
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
2ND FLOOR inspection date 5/20/2024
1.zones 1 and 2 exterior walls patches ok to insulate
2.zone 4 provide detail from architect for rafter attachment at light monitor
3. provide Fire cover approval for zone 4 ceiling at hard lids
4.complete fire stop at ceiling in zone 4 as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 hard lids to structure inspection
2.provide approved inspection results or schedule inspection to perform roof structure inspection
3. provide fire cover approval for these areas prior to scheduling this inspection
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
date of inspection 6/26/2024
1. cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
date of inspection 7/8/2024
2nd floor reception area ceiling
1. provide as-built approval for ceiling as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
hardlids rm 211, 212 and adjacent hallway ok
|
||||
Plumbing Rough In Inspection | Partial Pass | 7/16/2024 | 7/16/2024 | 07/16/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/16/2024
1.zone 4 NE CORNER OF first floor grid line c 1-4 DWV approved
2.supply approved at 100 psi
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
2ND FLOOR
1. supply zones 1,2 and part of zone 3 approved at 100 PSI as marked up on city approved plans PS 2.02
2. DWV approved zones 1,2 and part of zone 3 approved as marked up on city approved plans PS 2.02
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
2ND FLOOR
1.zone 3 room 206 dental flex DWF approved no supply
2.zone 4 80% of framing was not done at time of inspection DWV approved no supply
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
inspection date 5/22/2024
2ND FLOOR
1.zone 3 room 206 dental flex supply approved
2.zone 4 supply approved at 100 PSI
|
||||
Other/Miscellaneous
Carried Forward
07/16/2024
1:1st floor drinking fountain and recirc lines ok
|
||||
Wallboard / Drywall Inspection | Partial Pass | 7/18/2024 | 7/18/2024 | 07/18/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/18/2024
2nd floor
zone 4
1.hard lid to structure approved
zone 2
1.rooms 229, 217, 214,215 hard lids approved
zone 1
1.room 239 hard lid approved
|
||||
Other/Miscellaneous
Carried Forward
07/18/2024
date of inspection 7/8/2024
2nd floor zone 3 walls approved except where no walls are framed due to ceiling not complete
|
||||
Other/Miscellaneous
Carried Forward
07/18/2024
zone 4 level 2 ok
|
||||
Frame Inspection | Partial Pass | 7/18/2024 | 7/18/2024 | 07/18/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/18/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
07/18/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Other/Miscellaneous
Carried Forward
07/18/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
07/18/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Carried Forward
07/18/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Other/Miscellaneous
Carried Forward
07/18/2024
date of inspection 6/26/2024
1. cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
07/18/2024
date of inspection 7/8/2024
2nd floor reception area ceiling
1. provide as-built approval for ceiling as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/18/2024
1: one hour oxy tank room frame ok but may have to install vent to ext at floor
|
||||
Footing/Setback Inspection | Passed | 7/19/2024 | 7/19/2024 | 07/19/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
07/19/2024
mech compressor enclosure footings ok to pour
|
||||
Ceiling Grid/T-Bar Inspection | Partial Pass | 7/19/2024 | 7/19/2024 | 07/19/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/19/2024
1:clouds in west and east operating rooms ok.
|
||||
Wallboard / Drywall Inspection | Not Ready | 7/22/2024 | 7/22/2024 | 07/22/2024 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/22/2024
2nd floor
zone 4
1.hard lid to structure approved
zone 2
1.rooms 229, 217, 214,215 hard lids approved
zone 1
1.room 239 hard lid approved
|
||||
Other/Miscellaneous
Carried Forward
07/22/2024
date of inspection 7/8/2024
2nd floor zone 3 walls approved except where no walls are framed due to ceiling not complete
|
||||
Other/Miscellaneous
Carried Forward
07/22/2024
cancel on-site per superintendent, due to Juan not on-site at time of drywall inspection.
|
||||
Frame Inspection | Partial Pass | 7/24/2024 | 7/24/2024 | 07/24/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
07/24/2024
inspection date 5/31/2024
1.cancelled by contractor on site
|
||||
Other/Miscellaneous
Resolved
07/24/2024
inspection date 6/3/2024
this was a comment inspection
1. discussed outstanding framing items
|
||||
Other/Miscellaneous
Carried Forward
07/24/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
07/24/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Carried Forward
07/24/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Other/Miscellaneous
Resolved
07/24/2024
date of inspection 6/26/2024
1. cancelled by contractor on site
|
||||
Other/Miscellaneous
Carried Forward
07/24/2024
date of inspection 7/8/2024
2nd floor reception area ceiling
1. provide as-built approval for ceiling as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
07/24/2024
1:walls in lower floor bathrooms ok
2:soffits on 2nd level lobby ok
3:2nd layer of rock on rooms 211 and 212 ok
|
||||
Wallboard / Drywall Inspection | Partial Pass | 7/29/2024 | 7/29/2024 | 07/29/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/29/2024
2nd floor
zone 4
1.hard lid to structure approved
zone 2
1.rooms 229, 217, 214,215 hard lids approved
zone 1
1.room 239 hard lid approved
|
||||
Other/Miscellaneous
Carried Forward
07/29/2024
date of inspection 7/8/2024
2nd floor zone 3 walls approved except where no walls are framed due to ceiling not complete
|
||||
Other/Miscellaneous
Carried Forward
07/29/2024
cancel on-site per superintendent, due to Juan not on-site at time of drywall inspection.
|
||||
Other/Miscellaneous
Carried Forward
07/29/2024
1:med gas room 1st layer on lid ok 7/29/24
|
||||
Mechanical Rough In Inspection | Partial Pass | 7/30/2024 | 7/30/2024 | 07/30/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/30/2024
zone 4 level 2 ok to insulate duct work
|
||||
Ceiling Grid/T-Bar Inspection | Partial Pass | 7/30/2024 | 7/30/2024 | 07/30/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/30/2024
grid at zones 1 and 2 ok with a couple areas at corridor walls patched
|
||||
Frame Inspection | Partial Pass | 7/31/2024 | 7/31/2024 | 07/31/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/31/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
07/31/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Carried Forward
07/31/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Other/Miscellaneous
Carried Forward
07/31/2024
date of inspection 7/8/2024
2nd floor reception area ceiling
1. provide as-built approval for ceiling as discussed with contractor
|
||||
Other/Miscellaneous
Outstanding
07/31/2024
north wall (existing) ok to insulate and add straps as discussed.
|
||||
Wallboard / Drywall Inspection | Partial Pass | 7/31/2024 | 7/31/2024 | 07/31/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/31/2024
2nd floor
zone 4
1.hard lid to structure approved
zone 2
1.rooms 229, 217, 214,215 hard lids approved
zone 1
1.room 239 hard lid approved
|
||||
Other/Miscellaneous
Carried Forward
07/31/2024
date of inspection 7/8/2024
2nd floor zone 3 walls approved except where no walls are framed due to ceiling not complete
|
||||
Other/Miscellaneous
Carried Forward
07/31/2024
cancel on-site per superintendent, due to Juan not on-site at time of drywall inspection.
|
||||
Other/Miscellaneous
Carried Forward
07/31/2024
1:rock on hard lids lower bathrooms ok also rock on soffits in reception area ok
|
||||
Ceiling Grid/T-Bar Inspection | Partial Pass | 8/1/2024 | 8/1/2024 | 08/01/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/01/2024
1:zone 1, 2 and 3 grid 1st level ok
|
||||
Mechanical Rough In Inspection | Partial Pass | 8/1/2024 | 8/1/2024 | 08/01/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/01/2024
1:ok to insulate duct work 2nd floor reception area
|
||||
Energy (Insulation) Inspection | Partial Pass | 8/1/2024 | 8/1/2024 | 08/01/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/01/2024
1. exterior walls zones 3 and 4 first floor approved
|
||||
Other/Miscellaneous
Carried Forward
08/01/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 exterior wall fill ins approved
|
||||
Other/Miscellaneous
Carried Forward
08/01/2024
date of inspection 6/26/2024
1.2nd floor zone 3 exterior wall fill ins approved
|
||||
Other/Miscellaneous
Carried Forward
08/01/2024
ok to shear north wall at stair well
|
||||
Frame Inspection | Not Ready | 8/6/2024 | 8/6/2024 | 08/06/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/06/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Carried Forward
08/06/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Carried Forward
08/06/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Other/Miscellaneous
Carried Forward
08/06/2024
date of inspection 7/8/2024
2nd floor reception area ceiling
1. provide as-built approval for ceiling as discussed with contractor
|
||||
Shear Wall Inspection | Partial Pass | 8/6/2024 | 8/6/2024 | 08/06/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/06/2024
2nd floor
1.shear wall approved per special inspection
|
||||
Other/Miscellaneous
Carried Forward
08/06/2024
date of inspection 6/28/2024
level 2
1. existing shear wall repairs between zone 2 and 3 approved
|
||||
Other/Miscellaneous
Carried Forward
08/06/2024
shear on existing wall at north stairwell ok
|
||||
Wallboard / Drywall Inspection | Partial Pass | 8/19/2024 | 8/19/2024 | 08/19/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/19/2024
2nd floor
zone 4
1.hard lid to structure approved
zone 2
1.rooms 229, 217, 214,215 hard lids approved
zone 1
1.room 239 hard lid approved
|
||||
Other/Miscellaneous
Carried Forward
08/19/2024
date of inspection 7/8/2024
2nd floor zone 3 walls approved except where no walls are framed due to ceiling not complete
|
||||
Other/Miscellaneous
Carried Forward
08/19/2024
cancel on-site per superintendent, due to Juan not on-site at time of drywall inspection.
|
||||
Other/Miscellaneous
Carried Forward
08/19/2024
1:rock on hard lids lower bathrooms ok also rock on soffits in reception area ok
|
||||
Other/Miscellaneous
Carried Forward
08/19/2024
date of inspection 8/19/2024
1. dens glass at exterior north stairwell approved
|
||||
Frame Inspection | Partial Pass | 8/26/2024 | 8/26/2024 | 08/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
08/26/2024
date of inspection 6/6/2024
2nd floor zone 2
1.storage room 217 hard lid approved
2.exam consultant room 224 soffits approved
|
||||
Other/Miscellaneous
Resolved
08/26/2024
inspection date 6/10/2024
2nd floor
1. cart storage in zone 2 in corridor approved
2. hard lid in zone 4 approved
|
||||
Other/Miscellaneous
Resolved
08/26/2024
date of inspection 6/17/2024
level 2
1.zone 2 room 230 restroom and accessible bathrooms hard lids approved
|
||||
Other/Miscellaneous
Carried Forward
08/26/2024
date of inspection 7/8/2024
2nd floor reception area ceiling
1. provide as-built approval for ceiling as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
08/26/2024
1:south ext stairwell ok to cover with studs to columns screwed as per engineer and with special insp approval.
|
||||
Ceiling Grid/T-Bar Inspection | Partial Pass | 8/26/2024 | 8/26/2024 | 08/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
08/26/2024
1:2nd floor zone 1 and 2 ok minus 226, 221, 222, 228, 246, 247.
|
||||
Mechanical Rough In Inspection | Partial Pass | 8/26/2024 | 8/26/2024 | 08/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
08/26/2024
1:2nd floor zone 1 and 2 ok minus 226, 221, 222, 228, 246, 247.
|
||||
Mechanical Rough In Inspection | Partial Pass | 8/29/2024 | 8/29/2024 | 08/29/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/29/2024
diffusers ok 2nd floor zone 3
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 8/29/2024 | 8/29/2024 | 08/29/2024 |
Monty Johnson ((253) 770-3326) | ||||
Wallboard / Drywall Inspection | Partial Pass | 8/30/2024 | 8/30/2024 | 08/30/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
08/30/2024
2nd floor
zone 4
1.hard lid to structure approved
zone 2
1.rooms 229, 217, 214,215 hard lids approved
zone 1
1.room 239 hard lid approved
|
||||
Other/Miscellaneous
Resolved
08/30/2024
date of inspection 7/8/2024
2nd floor zone 3 walls approved except where no walls are framed due to ceiling not complete
|
||||
Other/Miscellaneous
Resolved
08/30/2024
cancel on-site per superintendent, due to Juan not on-site at time of drywall inspection.
|
||||
Other/Miscellaneous
Resolved
08/30/2024
1:rock on hard lids lower bathrooms ok also rock on soffits in reception area ok
|
||||
Other/Miscellaneous
Resolved
08/30/2024
date of inspection 8/19/2024
1. dens glass at exterior north stairwell approved
|
||||
Other/Miscellaneous
Carried Forward
08/30/2024
drywall north ext stairwell ok
|
||||
Ceiling Grid/T-Bar Inspection | Partial Pass | 9/9/2024 | 9/9/2024 | 09/09/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
09/09/2024
zone 3 second floor minus clouds ok
|
||||
Mechanical Rough In Inspection | Partial Pass | 9/9/2024 | 9/9/2024 | 09/09/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/09/2024
zone 3 2nd floor minus cloud areas diffusers and above grid ok
|
||||
Ceiling Grid/T-Bar Inspection | Partial Pass | 9/11/2024 | 9/11/2024 | 09/11/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/11/2024
building complete
|
||||
Mechanical Rough In Inspection | Partial Pass | 9/11/2024 | 9/11/2024 | 09/11/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/11/2024
mech in grid complete
|
||||
Comment Building Div Inspection | Passed w/ Conditions | 9/18/2024 | 9/18/2024 | 09/18/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
09/18/2024
talked about people coming in to set up computers and stations.
|
||||
Plumbing Final Inspection | Failed | 10/8/2024 | 10/8/2024 | 10/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/09/2024
date of inspection 10/8/2024
1. complete insulation at back flow on first floor
2.room 138 complete sink to a max ht of 34"
3.provide all corrected backflow certs and final letters regarding plumbing
4.room 126 provide hammer arrestor at dishwasher
5.room 130 complete sink to max ht of 34"
6. room 130 provide flushometer on correct side of toilet
7. room 109 provide flushometer on correct side of toilet
8.room 109 complete sink to max ht of 34"
9.room 113 complete sink to max ht of 34"
10. room 113 provide flushometer on correct side of toilet
11.room 273 complete toilet per city approved plans for wall to center of toilet 16"to 18"
12. room 266 complete sink to max ht of 34"
13.room 266 complete toilet per city approved plans for wall to center of toilet 16"to 18"
14.room 230 complete toilet per city approved plans for wall to center of toilet 16"to 18"
15.room 230 provide flushometer on correct side of toilet
16.room 214 complete sink to max ht of 34"
17.room 214 provide flushometer on correct side of toilet
18. room 148 provide install instructions for dishwasher and sterilizer on site for verification whether or not a hammer arrestor is needed
19.not a complete list
|
||||
Mechanical Final Inspection | Partial Pass | 10/16/2024 | 10/16/2024 | 10/16/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
10/16/2024
provide final balance report. will need to check on a mechanical exhaust duct requirements in oxy room.
|
||||
Plumbing Final Inspection | Partial Pass | 10/16/2024 | 10/16/2024 | 10/16/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
10/16/2024
date of inspection 10/8/2024
1. complete insulation at back flow on first floor
2.room 138 complete sink to a max ht of 34"
3.provide all corrected backflow certs and final letters regarding plumbing
4.room 126 provide hammer arrestor at dishwasher
5.room 130 complete sink to max ht of 34"
6. room 130 provide flushometer on correct side of toilet
7. room 109 provide flushometer on correct side of toilet
8.room 109 complete sink to max ht of 34"
9.room 113 complete sink to max ht of 34"
10. room 113 provide flushometer on correct side of toilet
11.room 273 complete toilet per city approved plans for wall to center of toilet 16"to 18"
12. room 266 complete sink to max ht of 34"
13.room 266 complete toilet per city approved plans for wall to center of toilet 16"to 18"
14.room 230 complete toilet per city approved plans for wall to center of toilet 16"to 18"
15.room 230 provide flushometer on correct side of toilet
16.room 214 complete sink to max ht of 34"
17.room 214 provide flushometer on correct side of toilet
18. room 148 provide install instructions for dishwasher and sterilizer on site for verification whether or not a hammer arrestor is needed
19.not a complete list
|
||||
Other/Miscellaneous
Carried Forward
10/16/2024
1:plumbing final approved minus lobby bathrooms.
|
||||
Frame Inspection | Not Ready | 11/6/2024 | 11/6/2024 | 11/06/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
11/06/2024
date of inspection 7/8/2024
2nd floor reception area ceiling
1. provide as-built approval for ceiling as discussed with contractor
|
||||
Other/Miscellaneous
Outstanding
11/06/2024
talked about 2hr wall and ceiling framing at das closet
|
||||
Frame Inspection | Partial Pass | 11/21/2024 | 11/21/2024 | 11/21/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/21/2024
1:coreboard lid on 2hr closet ok
|
||||
Other/Miscellaneous
Outstanding
11/21/2024
1:coreboard lid on 2hr closet ok
|
||||
Wallboard / Drywall Inspection | Failed | 11/22/2024 | 11/22/2024 | 11/22/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/22/2024
INSP FOR 1ST LAYER ON LID OF 2HR CLOSET
1:remove type-x and replace with type-c as per listing or provide different listing.
|
||||
Wallboard / Drywall Inspection | Partial Pass | 11/25/2024 | 11/25/2024 | 11/25/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/25/2024
insp for 2hr radio closet
LID OK.
|
||||
Frame Inspection | Partial Pass | 11/26/2024 | 11/26/2024 | 11/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/26/2024
1:coreboard lid on 2hr closet ok
|
||||
Other/Miscellaneous
Outstanding
11/26/2024
2hr closet wall framing ok
|
||||
Wallboard / Drywall Inspection | Partial Pass | 11/27/2024 | 11/27/2024 | 11/27/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/27/2024
1: 1st layer on inside and outside of walls ok
|
||||
Wallboard / Drywall Inspection | Passed | 12/3/2024 | 12/3/2024 | 12/03/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
12/03/2024
bathroom fix and 2hr closet ok.
|
||||
Exit Lighting Test Inspection | Passed | 12/19/2024 | 12/19/2024 | |
David Drake ((253) 864-4171) | ||||
Fire Or Smoke Damper Inspection | Passed | 12/19/2024 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 12/19/2024 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | Passed | 12/19/2024 | 12/19/2024 | 12/19/2024 |
David Drake ((253) 864-4171) | ||||
Fire Final Inspection | Passed | 12/19/2024 | 12/19/2024 | 12/19/2024 |
David Drake ((253) 864-4171) | ||||
Planning Final Inspection | Passed | 12/19/2024 | 12/20/2024 | |
Nabila Comstock ((253) 770-3361) | ||||
Corrections:
Miscellaneous Planning Correction
Resolved
12/20/2024
|
||||
Building Final Inspection | Not Ready | 12/20/2024 | 12/20/2024 | 12/20/2024 |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | Not Ready | 12/20/2024 | 12/20/2024 | 12/20/2024 |
Monty Johnson ((253) 770-3326) | ||||
Plumbing Final Inspection | Passed | 12/20/2024 | 12/20/2024 | 12/20/2024 |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | Passed | 12/26/2024 | 12/26/2024 | 12/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Building Final Inspection | Failed | 12/26/2024 | 12/26/2024 | 12/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
12/26/2024
1: provide handrails and guardrails at back ramp.
2:provide returns for all handrails inside and outside of building.
3:provide med gas final letter.
4:provide engineering dept final approval,
5:i will check on handrail req at new stairs for handrail at landings.
not ready
|
||||
Comment Engineering Div Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) | ||||
Cover Inspection/Thrust Blocks Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) | ||||
Engineering Final Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) | ||||
Building Final Inspection | Failed | 1/16/2025 | 1/16/2025 | 01/16/2025 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/16/2025
(MET WITH BUILDING OFFICIAL ON SITE TO ADDRESS ACCESSIBILITY.)
Front Ramps and handrails to the ROW. The front rail has handrails detailed on both sides of the ramp, with extensions, and appear appropriately dimensioned
Front ramp to the parking area: this area should have handrails on both sides as part of the exit and accessible access from the parking area. The plans provide a couple of variations of the handrail locations, both north and south. I don’t know how to provide an exception to this ramp, due to the obvious accessible route.
The architect has designated that the west ramp is no longer an exit or accessible route, by the attached revision. The code in chapter 10 provides “1012.1 Scope.
The provisions of this section shall apply to ramps used as a component of a means of egress.” There should be signage added per IBC 1111 to address where the accessible entrance is located or otherwise address this area as an employee-only area.
|
||||
Building Final Inspection | Passed | 1/31/2025 | 1/31/2025 | 01/31/2025 |
Monty Johnson ((253) 770-3326) | ||||
Roof Sheathing Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Firewall/Firestop Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Hydronic Piping Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Carbon Monoxide Detectors Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Refrigeration Line Test Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Exhaust Hood Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Light Test For Grease Duct Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Exhaust/Vent Fans Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Medical Gas Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Gas Test Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Foundation/Rebar Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Corrections:
Other/Miscellaneous
Outstanding
04/17/2024
1. cancelled on site by contractor
|
||||
Slab/Insulation Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Corrections:
Other/Miscellaneous
Outstanding
04/25/2024
1 north stairwell slab approved to pour per special inspections
|
||||
Combination Frame And Rough In Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Corrections:
Other/Miscellaneous
Outstanding
05/16/2024
2ND FLOOR
1. zones 1 and 2 wall framing only approved
|
||||
Plumbing Below Slab Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Corrections:
Other/Miscellaneous
Outstanding
05/31/2024
FIRST FLOOR
1.DWV tie in under slab far west corridor where conflict with electrical conduit was approved
|
||||
Mechanical Rough In Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Plumbing Rough In Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Corrections:
Other/Miscellaneous
Outstanding
07/16/2024
1.zone 4 NE CORNER OF first floor grid line c 1-4 DWV approved
2.supply approved at 100 psi
|
||||
Other/Miscellaneous
Outstanding
07/16/2024
2ND FLOOR
1. supply zones 1,2 and part of zone 3 approved at 100 PSI as marked up on city approved plans PS 2.02
2. DWV approved zones 1,2 and part of zone 3 approved as marked up on city approved plans PS 2.02
|
||||
Other/Miscellaneous
Outstanding
07/16/2024
2ND FLOOR
1.zone 3 room 206 dental flex DWF approved no supply
2.zone 4 80% of framing was not done at time of inspection DWV approved no supply
|
||||
Other/Miscellaneous
Outstanding
07/16/2024
inspection date 5/22/2024
2ND FLOOR
1.zone 3 room 206 dental flex supply approved
2.zone 4 supply approved at 100 PSI
|
||||
Energy (Insulation) Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Corrections:
Other/Miscellaneous
Outstanding
08/01/2024
1. exterior walls zones 3 and 4 first floor approved
|
||||
Other/Miscellaneous
Outstanding
08/01/2024
inspection date 5/23/2024
2ND FLOOR
1.zones 1 and 2 exterior wall fill ins approved
|
||||
Other/Miscellaneous
Outstanding
08/01/2024
date of inspection 6/26/2024
1.2nd floor zone 3 exterior wall fill ins approved
|
||||
Shear Wall Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Corrections:
Other/Miscellaneous
Outstanding
08/06/2024
2nd floor
1.shear wall approved per special inspection
|
||||
Other/Miscellaneous
Outstanding
08/06/2024
date of inspection 6/28/2024
level 2
1. existing shear wall repairs between zone 2 and 3 approved
|
||||
Other/Miscellaneous
Outstanding
08/06/2024
shear on existing wall at north stairwell ok
|
||||
Ceiling Grid/T-Bar Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Mechanical Rough In Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Frame Inspection | VOID | 04/02/2025 | ||
Joyce Kennedy ((253) 841-5405) | ||||
Corrections:
Other/Miscellaneous
Outstanding
11/26/2024
1:coreboard lid on 2hr closet ok
|
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
Fire Prevention
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results
• All elevator maintenance and inspections required to be updated prior to Final
• Separate permits required for Fire Alarm and Fire Sprinkler
• Fire Sprinkler system maintenance and inspections required to be updated prior to Final
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• Fire Lane painting and stenciling required to be updated prior to Final.
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
Frontage Improvements - Non-Residential Tenant Improvements | Resolved | Prior to Issuance |
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, non-residential tenant improvement projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) and when the remodel valuation exceeds $500,000 are required to complete improvements along the property's street frontage. This site is subject to the following condition:
(a) Within the downtown business zones of CBD and CBD Core frontage improvements will be required when the value of remodel exceeds 75 percent of the value of the commercial unit being remodeled and exceeds $500,000 remodel valuation.
The value of the remodel ($3,314,790.00) does not exceed 75 percent of the value of the commercial unit being remodeled ($5,045,400.00). Therefore, frontage improvements are not required for this project. [Yianni Charitou @ 02/13/2023 8:02 AM]
|
||
Backflow Protection Device - Commercial RPBA | Resolved | Prior to Completion |
Engineering Division
An approved reduced pressure backflow assembly (RPBA) device is required to be installed on the commercial water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Water Department verified an approved RPBA has been installed. [Yianni Charitou @ 11/10/2022 2:28 PM]
|
||
Side Sewer Sample Tee | Resolved | Prior to Occupancy |
Engineering Division
A side sewer sampling connection is required to be installed on the commercial sanitary side sewer service in accordance with City policy ENG 21-03. The site plan shall depict the location and connection of the new or existing sampling connection per City Standard Detail 04.03.04. The sampling connection may be installed under civil permit application PRCCP20221725 as long as the retrofit is clearly depicted and labeled on the approved civil plans and City Standard Detail 04.03.04 is included on the details sheet.
|
||
Fire Sprinkler Protection System Water Service and Backflow Protection Device | Resolved | Prior to Completion |
Engineering Division
Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2.
Water Department verified an approved RPBA has been installed. [Yianni Charitou @ 11/10/2022 2:29 PM]
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard commercial conditions:
Demolition Permit: PRDE20221644
Civil Permit: PRCCP20221725
- Prior to starting site work request an inspection for erosion and sediment.
- Occupancy will not be granted until all civil work associated with PRCCP20221725 has been completed and approval has been provided.
- Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20221725 for approved method of control.
- The applicant is responsible to schedule all utility inspections prior to backfilling
- Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
Miscellaneous Condition | Open | |
Fire Prevention
Emergency Radio Testing required Prior to Final
• Email Ron Taylor for all required Radio frequencies ron@rtfidelity.solutions
o Cc. ddrake@puyallupwa.gov
o Cc. rayc@puyallupwa.gov
o Responding agencies are Central Pierce Fire & Rescue, Puyallup Police Department
• Prior to requesting City Inspection, reply to email chain above with passing test results and include all frequencies tested in a full report.
• Once the report has been reviewed, a request for inspection can be approved.
• Appointment required for inspection.
• Fire Alarm contractor required to be onsite for testing.
• Provide plans and permit on site for inspection.
• A smoke detector is required above riser.
• ERRS to be labeled on door.
• Complete labor and industries inspections prior to requesting city inspection.
Schedule your inspection online through the city of puyallup online permit system after requesting appointment from inspector. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Development & Permitting Services
CIVIL PERMIT STILL UNDER REVIEW PRCCP20221725 & FEES NEED TO BE PAID
|
Reference Number | Status | Type |
---|---|---|
PRCTI20221714 | Closed | Commercial - Tenant Improvement/Remodel |
PRCCP20221725 | Closed | Civil Construction Permit |
PRHM20231549 | Closed | Hydraulic Modeling |
PRFS20231656 | Closed | Fire Sprinklers |
PRFA20231782 | Closed | Fire Alarms |
PRFA20231783 | Closed | Fire Alarms |
PRROW20240592 | Closed | Right-of-Way Permit |