Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 04/27/2023 |
Air Handling Unit (Up to 10,000 cfm) Fee | $98.70 | $98.70 | Paid | 04/27/2023 |
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee | $35.95 | $35.95 | Paid | 04/27/2023 |
Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 04/27/2023 |
Building Permit Fee | $7,054.15 | $7,054.15 | Paid | 04/27/2023 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 04/27/2023 |
Drinking Fountain, Water Cooler, Ice Machine Fee | $40.25 | $40.25 | Paid | 04/27/2023 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 04/27/2023 |
Sump, Sewage, or Ejector Pumps Fee | $156.00 | $156.00 | Paid | 04/27/2023 |
Water Heater Fee | $13.00 | $13.00 | Paid | 04/27/2023 |
Building Plan Review Fee | $4,585.20 | $4,585.20 | Paid | 11/03/2022 |
Mechanical Plan Review Fee | $129.12 | $129.12 | Paid | 11/03/2022 |
Plumbing Plan Review Fee | $162.01 | $162.01 | Paid | 11/03/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 04/27/2023 |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $17,363.72 | $17,363.72 | Paid | 04/27/2023 |
Water System Development ChargeFee - Tenant Improvment/Addition | $11,131.38 | $11,131.38 | Paid | 04/27/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 01/11/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 03/30/2023 |
Traffic Impact Fee (Commercial) | $59,850.00 | $59,850.00 | Paid | 04/27/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 11/20/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 12/20/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 02/22/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 11/01/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $101,993.48 | $101,993.48 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Frame Inspection | Not Ready | 12/1/2023 | 12/1/2023 | 12/01/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/01/2023
INSP FOR GARAGE
TALKED ABOUT CALLING IN CORRECT PERMITS AND HAVING AREAS COMPLETE FOR INSPECTION
|
||||
Combination Frame And Rough In Inspection | Not Ready | 12/4/2023 | 12/4/2023 | 12/04/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/04/2023
cancelled by contractor
|
||||
Frame Inspection | Partial Pass | 12/7/2023 | 12/7/2023 | 12/07/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/07/2023
1: Z GIRTS ON LID LOWER LEVEL OK
|
||||
Energy (Insulation) Inspection | Partial Pass | 12/20/2023 | 12/20/2023 | 12/20/2023 |
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Partial Pass | 12/28/2023 | 12/28/2023 | 12/28/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/28/2023
electrical room drywall ok.
|
||||
Wallboard / Drywall Inspection | Partial Pass | 1/3/2024 | 1/3/2024 | 01/03/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/03/2024
rock on lid ok
|
||||
Plumbing Below Slab Inspection | Not Ready | 1/10/2024 | 1/10/2024 | 01/10/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/10/2024
below floor dwv test called in on wrong permit
|
||||
Frame Inspection | Not Ready | 1/11/2024 | 1/11/2024 | 01/11/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/11/2024
provide architects top and bottom track attachment details
|
||||
Frame Inspection | Partial Pass | 1/18/2024 | 1/18/2024 | 01/18/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
01/18/2024
1:ok to rock top track down 1ft, (head of wall only)
|
||||
Mechanical Rough In Inspection | Partial Pass | 2/9/2024 | 2/9/2024 | 02/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/09/2024
1.rooms 113,112,111,110,109,108,107 approved for duct insulation
|
||||
Comment Building Div Inspection | Passed w/ Conditions | 2/13/2024 | 02/13/2024 | |
Monty Johnson ((253) 770-3326) | ||||
Plumbing Rough In Inspection | Partial Pass | 3/5/2024 | 3/5/2024 | 03/05/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/05/2024
dwv, condensate and supply 1st level ok
|
||||
Frame Inspection | Partial Pass | 3/11/2024 | 3/11/2024 | 03/11/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/11/2024
1: frame ok minus north and south ext walls and fire walls
|
||||
Wallboard / Drywall Inspection | Not Ready | 3/13/2024 | 3/13/2024 | 03/13/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/13/2024
1. cancelled on site by contractor
|
||||
Wallboard / Drywall Inspection | Partial Pass | 3/14/2024 | 3/14/2024 | 03/14/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/14/2024
1. cancelled on site by contractor
|
||||
Other/Miscellaneous
Carried Forward
03/14/2024
1. north exterior drywall nailing approved (exterior of wall)
|
||||
Plumbing Below Slab Inspection | Not Ready | 3/18/2024 | 3/18/2024 | 03/18/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/18/2024
1. this was for the water service coming in to the building needs be done by engineering
|
||||
Frame Inspection | Not Ready | 3/19/2024 | 3/19/2024 | 03/19/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/19/2024
ROOM 107 PHARMACY WAITING ROOM
1. complete insulation that is missing above ceiling at exterior wall (west)
2. complete framing at ceiling as discussed with contractor
3. provide cover approval for fire as discussed with contractor at time of next inspection
4.not ready
|
||||
Energy (Insulation) Inspection | Partial Pass | 3/21/2024 | 3/21/2024 | 03/21/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/21/2024
1.exterior wall at east at hard lids pharmacy room 107 approved
|
||||
Mechanical Rough In Inspection | Partial Pass | 3/21/2024 | 3/21/2024 | 03/21/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/21/2024
1.rooms 113,112,111,110,109,108,107 approved for duct insulation
|
||||
Other/Miscellaneous
Carried Forward
03/21/2024
1.MECH approved at hard lids room 107 pharmacy waiting
|
||||
Frame Inspection | Partial Pass | 3/21/2024 | 3/21/2024 | 03/21/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/21/2024
ROOM 107 PHARMACY WAITING ROOM
1. complete insulation that is missing above ceiling at exterior wall (west)
2. complete framing at ceiling as discussed with contractor
3. provide cover approval for fire as discussed with contractor at time of next inspection
4.not ready
|
||||
Other/Miscellaneous
Carried Forward
03/21/2024
1.pharmacy waiting room 107 hard lids approved
2.room 109 south bathroom hard lid approved
3. north, east ,southeast exterior walls and small section in corridor remove insulation from walls clean construction debri from bottom plates and complete rigid insulation per city approved plans
|
||||
Wallboard / Drywall Inspection | Partial Pass | 3/22/2024 | 3/22/2024 | 03/22/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/22/2024
1. north exterior drywall nailing approved (exterior of wall)
|
||||
Other/Miscellaneous
Carried Forward
03/22/2024
1. no exterior walls
2. interior walls drywall nailing progression inspection approved
|
||||
Energy (Insulation) Inspection | Partial Pass | 3/27/2024 | 3/27/2024 | 03/28/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/28/2024
1.exterior wall at east at hard lids pharmacy room 107 approved
|
||||
Other/Miscellaneous
Carried Forward
03/28/2024
1. rigid insulation at north ,east, exterior walls and small wall in corridor approved
|
||||
Frame Inspection | Partial Pass | 3/27/2024 | 3/27/2024 | 03/28/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/28/2024
1.pharmacy waiting room 107 hard lids approved
2.room 109 south bathroom hard lid approved
3. north, east ,southeast exterior walls and small section in corridor remove insulation from walls clean construction debri from bottom plates and complete rigid insulation per city approved plans
|
||||
Other/Miscellaneous
Carried Forward
03/28/2024
1.north, east exteriors and small wall in corridor framing approved
2. ok to insulate
|
||||
Energy (Insulation) Inspection | Partial Pass | 3/29/2024 | 3/29/2024 | 03/29/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/29/2024
1. rigid insulation at north ,east, exterior walls and small wall in corridor approved
|
||||
Other/Miscellaneous
Carried Forward
03/29/2024
insulation batts in ext and corridor walls ok
|
||||
Energy (Insulation) Inspection | Partial Pass | 4/2/2024 | 4/2/2024 | 04/02/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/02/2024
1. exterior walls vapor barrier on north wall east wall and small wall in corridor approved
|
||||
Wallboard / Drywall Inspection | Partial Pass | 4/8/2024 | 4/8/2024 | 04/08/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
04/08/2024
1. no exterior walls
2. interior walls drywall nailing progression inspection approved
|
||||
Other/Miscellaneous
Carried Forward
04/08/2024
1.exterior walls north, east, and small wall in corridor approved
|
||||
Gas Test Inspection | Passed | 4/25/2024 | 4/25/2024 | 04/25/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
04/25/2024
1. gas test approved at 60 PSI
|
||||
Plumbing Rough In Inspection | Partial Pass | 5/3/2024 | 5/3/2024 | 05/04/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/04/2024
1. final section of supply side of plumbing tested at 100 PSI approved
|
||||
Wallboard / Drywall Inspection | Partial Pass | 5/22/2024 | 5/22/2024 | 05/23/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/23/2024
1.exterior walls north, east, and small wall in corridor approved
|
||||
Other/Miscellaneous
Carried Forward
05/23/2024
inspection date 5/22/2024
1.densglass repair southside of exterior building next to garage opening approved
2.densglass repair west side of building around fire sprinkler riser door approved
3. densglass repair around elevator pent house on roof approved pending architects clarification on rated wall assembly
|
||||
Wallboard / Drywall Inspection | Partial Pass | 6/10/2024 | 6/10/2024 | 06/11/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/11/2024
1.exterior walls north, east, and small wall in corridor approved
|
||||
Other/Miscellaneous
Carried Forward
06/11/2024
inspection date 5/22/2024
1.densglass repair southside of exterior building next to garage opening approved
2.densglass repair west side of building around fire sprinkler riser door approved
3. densglass repair around elevator pent house on roof approved pending architects clarification on rated wall assembly
|
||||
Other/Miscellaneous
Carried Forward
06/11/2024
inspection date 6/10/2024
1. west storage 1st layer approved
|
||||
Wallboard / Drywall Inspection | Partial Pass | 6/17/2024 | 6/17/2024 | 06/17/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/17/2024
1.exterior walls north, east, and small wall in corridor approved
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
inspection date 5/22/2024
1.densglass repair southside of exterior building next to garage opening approved
2.densglass repair west side of building around fire sprinkler riser door approved
3. densglass repair around elevator pent house on roof approved pending architects clarification on rated wall assembly
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
inspection date 6/10/2024
1. west storage 1st layer approved
|
||||
Other/Miscellaneous
Carried Forward
06/17/2024
date of inspection 6/17/2024
1.2nd layer at storage room 133 approved
|
||||
Mechanical Rough In Inspection | Not Ready | 6/21/2024 | 6/21/2024 | 06/21/2024 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/21/2024
1.MECH approved at hard lids room 107 pharmacy waiting
|
||||
Other/Miscellaneous
Carried Forward
06/21/2024
cancel per contractor.
|
||||
Mechanical Rough In Inspection | Not Ready | 6/25/2024 | 6/25/2024 | 06/25/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/25/2024
1.MECH approved at hard lids room 107 pharmacy waiting
|
||||
Other/Miscellaneous
Resolved
06/25/2024
cancel per contractor.
|
||||
Other/Miscellaneous
Carried Forward
06/25/2024
date of inspection 6/25/2024
1. complete positive attachment of diffuser's as discussed with contractor
|
||||
Shear Wall Inspection | Not Ready | 6/28/2024 | 6/28/2024 | 06/28/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/28/2024
1.called in in error
|
||||
Refrigeration Line Test Inspection | Not Ready | 6/28/2024 | 6/28/2024 | 06/28/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/28/2024
1. cancelled on site by contractor
|
||||
Mechanical Rough In Inspection | Partial Pass | 6/28/2024 | 6/28/2024 | 06/28/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/28/2024
1.MECH approved at hard lids room 107 pharmacy waiting
|
||||
Other/Miscellaneous
Carried Forward
06/28/2024
date of inspection 6/25/2024
1. complete positive attachment of diffuser's as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
06/28/2024
date of inspection 6/28/2024
1. R/I mech in corridors and rooms to the north approved
|
||||
Refrigeration Line Test Inspection | Partial Pass | 7/9/2024 | 7/9/2024 | 07/09/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/09/2024
1. cancelled on site by contractor
|
||||
Other/Miscellaneous
Carried Forward
07/09/2024
1:refer lines tested with one gauge at 625 psi to all head units and rtu, refer guy will explain how all connected at next insp.
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 7/11/2024 | 7/11/2024 | 07/11/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/11/2024
1:pharmacy area) provide pods at 1000 sq ft
2:provide counter splays at perimeter wires over angled.
3: provide perimeter wires at max 8" from wall.
|
||||
Ceiling Grid/T-Bar Inspection | Passed | 7/16/2024 | 7/16/2024 | 07/16/2024 |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | Partial Pass | 8/29/2024 | 8/29/2024 | 08/29/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/29/2024
final pending electrical and building final.
|
||||
Plumbing Final Inspection | Failed | 10/16/2024 | 10/16/2024 | 10/16/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/16/2024
provide open toilet seats and flush handles on correct side or city approved revision for non hc bathrooms
|
||||
Mechanical Final Inspection | Passed | 10/16/2024 | 10/16/2024 | 10/16/2024 |
Monty Johnson ((253) 770-3326) | ||||
Exit Lighting Test Inspection | Passed | 12/19/2024 | 12/19/2024 | |
David Drake ((253) 864-4171) | ||||
Fire Or Smoke Damper Inspection | Passed | 12/19/2024 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 12/19/2024 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | Passed | 12/19/2024 | 12/19/2024 | 12/19/2024 |
David Drake ((253) 864-4171) | ||||
Fire Final Inspection | Passed | 12/19/2024 | 12/19/2024 | 12/19/2024 |
David Drake ((253) 864-4171) | ||||
Building Final Inspection | Failed | 12/20/2024 | 12/20/2024 | 12/20/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/20/2024
1:provide storage only signs as discussed
2:complete fastening of osb at storage areas.
3:provide verification on 50 % of storage area to have 7ft head height
4:provide rfi changes for accessible bathrooms to non accessible from architect.
5:firecaulk penetrations in riser room
6:paint gas pipe.
7:remove all debris from roof.
|
||||
Plumbing Final Inspection | Passed | 12/20/2024 | 12/20/2024 | 12/20/2024 |
Monty Johnson ((253) 770-3326) | ||||
Planning Final Inspection | Passed | 12/19/2024 | 12/23/2024 | |
Chris Beale ((253) 841-5418) | ||||
Building Final Inspection | Failed | 12/26/2024 | 12/26/2024 | 12/26/2024 |
Monty Johnson ((253) 770-3326) | ||||
Comment Engineering Div Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) | ||||
Cover Inspection/Thrust Blocks Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) | ||||
Engineering Final Inspection | Passed | 01/06/2025 | ||
Jeff Hill ((253) 204-5633) | ||||
Building Final Inspection | Passed | 1/23/2025 | 1/23/2025 | 01/23/2025 |
Monty Johnson ((253) 770-3326) | ||||
Footing/Setback Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Foundation/Rebar Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Slab/Insulation Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Roof Sheathing Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Firewall/Firestop Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Hydronic Piping Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Exhaust Hood Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Light Test For Grease Duct Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Exhaust/Vent Fans Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Medical Gas Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Combination Frame And Rough In Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Plumbing Below Slab Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/18/2024
1. this was for the water service coming in to the building needs be done by engineering
|
||||
Frame Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/28/2024
1.north, east exteriors and small wall in corridor framing approved
2. ok to insulate
|
||||
Energy (Insulation) Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
04/02/2024
1. exterior walls vapor barrier on north wall east wall and small wall in corridor approved
|
||||
Plumbing Rough In Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
05/04/2024
1. final section of supply side of plumbing tested at 100 PSI approved
|
||||
Wallboard / Drywall Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/17/2024
1.exterior walls north, east, and small wall in corridor approved
|
||||
Other/Miscellaneous
Outstanding
06/17/2024
inspection date 5/22/2024
1.densglass repair southside of exterior building next to garage opening approved
2.densglass repair west side of building around fire sprinkler riser door approved
3. densglass repair around elevator pent house on roof approved pending architects clarification on rated wall assembly
|
||||
Other/Miscellaneous
Outstanding
06/17/2024
inspection date 6/10/2024
1. west storage 1st layer approved
|
||||
Other/Miscellaneous
Outstanding
06/17/2024
date of inspection 6/17/2024
1.2nd layer at storage room 133 approved
|
||||
Shear Wall Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/28/2024
1.called in in error
|
||||
Mechanical Rough In Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/28/2024
1.MECH approved at hard lids room 107 pharmacy waiting
|
||||
Other/Miscellaneous
Outstanding
06/28/2024
date of inspection 6/25/2024
1. complete positive attachment of diffuser's as discussed with contractor
|
||||
Other/Miscellaneous
Outstanding
06/28/2024
date of inspection 6/28/2024
1. R/I mech in corridors and rooms to the north approved
|
||||
Refrigeration Line Test Inspection | VOID | 01/23/2025 | ||
Monty Johnson ((253) 770-3326) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results
• All elevator maintenance and inspections required to be updated prior to Final
• Separate permits required for Fire Alarm and Fire Sprinkler
• Fire Sprinkler system maintenance and inspections required to be updated prior to Final
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• Fire Lane painting and stenciling required to be updated prior to Final.
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings | Resolved | Prior to Issuance |
Engineering Division
The building permit shall not be issued until the frontage improvement design has been approved by the City. See Civil Permit PRCCP20221725.
|
||
Side Sewer Sample Tee | Resolved | Prior to Issuance |
Engineering Division
Prior to issuance a utility permit must be issued to install the required sewer lateral sampling tee can be inconjuction with the installation of the RPBA. See Civil Permit PRCCP20221725. LL 01/17/2023
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Engineering Division
Prior to issuance a utility permit must be issued to install the required RPBA can be inconjuction with the installation of the sewer sampling tee. See Civil Permit PRCCP20221725. LL 01/17/2023
|
||
Miscellaneous Condition | Resolved | Prior to Occupancy |
Engineering Division
All work associated with the installation of the frontage improvements and the RPBA must be complete and a final approval granted. See Civil Permit PRCCP20221725. LL 11/09/2022
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Development & Permitting Services
Development Engineering standard commercial conditions:
** All work associated with the installation of the frontage improvements must be complete and a final approval granted **
** All work associated with the installation of the sewer sampling tee must be complete and a final approval granted **
**All work associated with the installation of the RPBA must be complete and a final approval granted **
- Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Engineering Division
Prior to issuance the sewer lateral inspection provided to Jeff Hill and Antwan Rhymes must be approved. Please ask Jamie Carter to approve this condition while/if I am out of the office. LL 12/20/2023
|
Reference Number | Status | Type |
---|---|---|
PRCTI20221698 | Closed | Commercial - Tenant Improvement/Remodel |
PRCCP20221725 | Closed | Civil Construction Permit |
PRHM20231549 | Closed | Hydraulic Modeling |
PRFS20231656 | Closed | Fire Sprinklers |
PRFA20231782 | Closed | Fire Alarms |
PRFA20231783 | Closed | Fire Alarms |
PRROW20240592 | Closed | Right-of-Way Permit |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.