CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCNC20250094


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCNC20250094
Commercial - New Construction
Returned for Correction
EAST TOWN CROSSING LLC
New
Construction of a 5,000 sq ft, 1-story commercial, 'shell" building. - EAST TOWN CROSSING, LOT 1 COMMERCIAL BLDG W/2 FUTURE TENANTS -- 727 SHAW RD
01/20/2025

Locations

Property
0420264021

727 SHAW RD, PUYALLUP, WA 98372

Reviews

Review Type Outcome Est. Completion Date Completed
Design Review VOID 03/28/2025 03/27/2025
Engineering Review Failed 03/28/2025 03/27/2025
Engineering Traffic Review Failed 03/28/2025 03/25/2025
Fire Review Approved 03/28/2025 03/24/2025
Building Review Failed 03/28/2025 03/20/2025
Planning Review Failed 03/28/2025 02/25/2025
Design Review Failed 03/28/2025 02/25/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $2,719.44 $2,719.44 Paid 01/20/2025
Mechanical Plan Review Fee $62.66 $62.66 Paid 01/20/2025
Plumbing Plan Review Fee $31.53 $31.53 Paid 01/20/2025
Outstanding Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $0.00 Not payable Not Paid
Planning Landscape Review Fee $90.00 $0.00 Not payable Not Paid
Unclassified Appliance or Equipment Fee $56.40 $0.00 Not payable Not Paid
Building Permit Fee $4,183.75 $0.00 Not payable Not Paid
Planning Building Permit Fee $30.00 $0.00 Not payable Not Paid
Mechanical Permit Fee $40.00 $0.00 Not payable Not Paid
Gas Piping (Plumbing) Fee $8.50 $0.00 Not payable Not Paid
Plumbing Permit Fee $40.00 $0.00 Not payable Not Paid
WA State Building Code Council Fee (Commercial) $25.00 $0.00 Not payable Not Paid
Sewer Permit Fee for Stub Onsite Inspection $170.00 $0.00 Not payable Not Paid
Sewer CCTV (Lateral) Fee $528.00 $0.00 Not payable Not Paid
Water System Development Charge $5,391.59 $0.00 Not payable Not Paid
Sewer System Development Charge $6,994.24 $0.00 Not payable Not Paid
Resubmittal Fee $180.00 $0.00 $180.00 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$180.00    Add Fees to My Cart

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down with Fire Alarm • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code to be installed at time of Fire Final • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20230970 for approved method of control. - Stormwater control of roof downspouts required. - Steps shall be taken to prevent drainage onto adjacent lots. - All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required as directed by the City of Puyallup. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - Curb, gutter, sidewalk, and approach must be poured per city standards. - Driveway approach must be a minimum of 30' wide. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Stormwater Maintenance Agreement (SWA) Open Prior to Occupancy
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
Right-of-Way (ROW) Dedication Open Prior to Occupancy
Engineering Division
Right-of-way dedication to match the abutting street classification shall be required as determined by Development Engineering. No building permit or development permit shall be granted for the construction or substantial improvement of any industrial, commercial, or residential building, or plat unless the plans and specifications contain provisions for the dedication to the City of sufficient street right of way for the classification of the street abutting the property according to the street plans and street development needs of the city for that street. Building permit PRCNC20241917 cannot be issued until boundary line adjustment PLBDJ20240103 is approved and recorded which depicts the required right-of-way dedication. The building permit site plan must match the approved boundary line adjustment. [Yianni Charitou @ 03/27/2025 8:42 AM]
Williams Gas Pipeline Survey Open Standard Conditions
Engineering Division
In accordance with RCW 19.27 and RCW 19.122, any project within 100-ft of a major utility transmission line, including hazardous liquid or gas pipelines, shall provide notice to the utility operator. Prior to permit issuance, provide written documentation from the operator/owner of the Northwest Pipeline LLC (Williams Gas Main) that the proposed development is acceptable as designed. (Contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or 253-377-6146.)
Miscellaneous Condition Open Prior to Issuance
Engineering Division
Building permit PRCNC20250094 cannot be issued until civil construction permit PRCCP20230970 is issued first. The building permit site plan must match the approved civil plan. [Yianni Charitou @ 03/27/2025 8:44 AM]
Miscellaneous Condition Open Prior to Occupancy
Engineering Division
Occupancy will not be granted until civil construction permit PRCCP20230970 has been completed and the final inspection has been passed. [Yianni Charitou @ 03/27/2025 8:45 AM]
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings Open Prior to Issuance
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, new commercial projects that have a structure improvement value exceeding $200,000 in valuation are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and civil construction permit application PRCCP20240569 has been issued.
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings Open Prior to Occupancy
Engineering Division
Your project is required to install frontage improvements in accordance with Puyallup Municipal Code 11.08.135. Building permit occupancy shall not be granted until the frontage improvements are completed and accepted, and civil construction permit PRCCP20240569 is finaled/closed.
Latecomer Agreement Resolved Prior to Issuance
Engineering Division
Per Puyallup Municipal Code Chapter 11.24, the property is subject to two recorded sanitary sewer latecomer's agreements. The property owner will be required to submit a development contribution latecomer fee for the Viking JV, LLC sanitary sewer main extension and sanitary sewer lift station/force main as defined in latecomer's agreements recorded under AFNs 202107061306 and 202406210039, respectively. The latecomer's development contribution fees have been assessed on building permit application PRCNC20241917. Latecomer contribution fees paid under PRCNC20241917 on 3/13/2025.
External Gravity Grease Interceptor Open Prior to Occupancy
Engineering Division
In accordance with the Uniform Plumbing Code and City Design Standard 402.3, an external gravity grease interceptor is required to be designed by a professional engineer and installed on the side sewer per City Standard Details 04.06.01 and 04.06.02. The site plan and plumbing plans shall depict the location and connection of the new or existing grease interceptor. A professional engineer shall provide gravity grease interceptor sizing calculations and a report stating that the existing or new grease interceptor has adequate capacity to serve the site/project. The grease interceptor installed under civil construction permit PRCCP20230970 must be installed, inspected, approved, and fully operational prior to granting building occupancy.
Backflow Protection Device - Commercial RPBA Open Prior to Occupancy
Engineering Division
As depicted on civil construction permit PRCCP20230970, an approved reduced pressure backflow assembly (RPBA) device is required to be installed on the commercial water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
Fire Sprinkler Protection System Water Service and Backflow Protection Device Open Prior to Occupancy
Engineering Division
A 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal. Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
FEMA Floodplain - AE Flood Zone - Commercial Resolved Prior to Occupancy
Engineering Division
This property lies within a regulated flood zone. According to the FEMA LOMR Case Number 21-10-0191P issued on April 27, 2022 and effective September 8, 2022, the flooding zone has been revised and the proposed building is no longer within the AE flood zone.
Miscellaneous Condition Open Prior to Issuance
Engineering Division
According to PMC Chapter 19.06.020, contiguous parcels are required to be combined when they share common facilities including but not limited to access, parking, utilities, open space, landscaping, signage, etc., for which no easements or other legal instruments exist to ensure continuous ownership, use and maintenance of such facilities. In this particular case, the East Town Crossing parcels share such facilities including driveway access, parking, landscaping, trash enclosures, and utilities. Prior to building permit issuance, the applicant shall apply for and provide a recorded legal instrument for the continuous ownership, use, and maintenance of the common facilities in compliance with Puyallup Municipal Code.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
01/20/2025 Map VICINITY MAP
01/20/2025 Drawing ARCHITECTURAL ELEVATIONS
01/20/2025 Other NARRATIVE FROM PROJECT ARCHITECT
01/20/2025 Plans LANDSCAPE PLANS
01/20/2025 Other TRAFFIC SCOPING WORKSHEET
01/20/2025 Report HAZARDOUS MATERIAL INVENTORY
01/20/2025 Receipt Receipt for transaction:2025-000128
03/28/2025 Letter Permit Review Correction Letter
03/28/2025 Form Application Form_ETC_Commercial Lot 1 (Flattened)
03/28/2025 Plans Site Plan ONLY_ETC_Commercial Lot 1 (Flattened)
03/28/2025 Plans Construction Set_ETC_Commercial Lot 1 (Flattened)
03/28/2025 Form Energy Code Worksheet_ETC_Commercial Lot 1 (Flattened)
03/28/2025 Report Structural Calculations_ETC_Commercial Lot 2 (Flattened)
03/28/2025 Form Plumbing fixture worksheet_ETC_Commerical Lot 1 (Flattened)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.