Permit Application Status
PRRWF20251393
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Building Plan Review Fee | $117.81 | $117.81 | Paid | 10/21/2025 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| Building Permit Fee | $181.25 | $0.00 | Not payable | Not Paid |
| Resubmittal Fee | $180.00 | $0.00 | $180.00 | Not Paid |
| Totals: | $479.06 | $117.81 | $180.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$180.00 Add Fees to My Cart
There are no inspections for this permit application, or you are not authorized to view them.
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Engineering Commercial Standard Conditions | Open | Standard Conditions |
|
Engineering Division
Development Engineering standard commercial conditions:
- Prior to starting site work request an inspection for erosion and sediment.
- Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20230970 for approved method of control.
- Steps shall be taken to prevent drainage onto adjacent lots.
- The applicant is responsible to schedule all utility inspections prior to backfilling
- Curb, gutter, sidewalk, and approach must be poured per city standards.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
| Williams Gas Pipeline Survey | Resolved | Standard Conditions |
|
Engineering Division
In accordance with RCW 19.27 and RCW 19.122, any project within 100-ft of a major utility transmission line, including hazardous liquid or gas pipelines, shall provide notice to the utility operator. Prior to permit issuance, provide written documentation from the operator/owner of the Northwest Pipeline LLC (Williams Gas Main) that the proposed development is acceptable as designed. (Contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or 253-377-6146.)
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Engineering Division
Building permit PRCNC20250094 cannot be issued until civil construction permit PRCCP20230970 is issued first.
PRCCP20230970 issued 6/12/2024. [Yianni Charitou @ 11/03/2025 2:00 PM]
|
||
| Reference Number | Status | Type |
|---|---|---|
| PRCNC20250094 | Permit(s) Issued | Commercial - New Construction |
| PRSG20251438 | In Plan Check | Sign/Awning |
| PRCTI20251445 | Submittals Incomplete | Commercial - Tenant Improvement/Remodel |
| Date Uploaded | File Type | Name |
|---|---|---|
| 10/21/2025 | Receipt | Receipt for transaction:2025-002052 |
| 11/06/2025 | Letter | Permit Review Correction Letter |
| 11/06/2025 | Form | ETC_Application form_Retaining Wall0 (Flattened) |
| 11/06/2025 | Plans | Site Plan_ETC_Lot 1 Retaining Wall0 (Flattened) |
| 11/06/2025 | Plans | Structural Drawings_ETC_Lot 1 Retaining Wall0 (Flattened) |
| 11/06/2025 | Report | Structural Analysis_ETC_Lot 1 Retaining Wall0 (Flattened) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.