Permit Application Status
PRCTI20221788
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 05/15/2023 |
Air Handling Unit (Up to 10,000 cfm) Fee | $14.10 | $14.10 | Paid | 05/15/2023 |
Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 05/15/2023 |
Building Permit Fee | $7,433.75 | $7,433.75 | Paid | 05/15/2023 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 05/15/2023 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 05/15/2023 |
Building Plan Review Fee | $4,831.94 | $4,831.94 | Paid | 12/06/2022 |
Mechanical Plan Review Fee | $50.77 | $50.77 | Paid | 12/06/2022 |
Plumbing Plan Review Fee | $26.00 | $26.00 | Paid | 12/06/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 05/15/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 04/03/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 03/22/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $13,060.56 | $13,060.56 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Engineering Div Inspection | Pending | |||
Footing/Setback Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Foundation/Rebar Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Fire Final Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Plumbing Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Mechanical Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Building Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Engineering Final Inspection | Pending | |||
Mechanical Rough In Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Outstanding
09/10/2024
operating room south infill wall both sides ok.
|
||||
Comment Building Div Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Emergency Radio Test Review Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | Pending | |||
David Drake ((253) 864-4171) | ||||
Fire Or Smoke Damper Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Exhaust/Vent Fans Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Exhaust Hood Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Refrigeration Line Test Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Exit Lighting Test Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Energy (Insulation) Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Plumbing Rough In Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Firewall/Firestop Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Shear Wall Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Roof Sheathing Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Slab/Insulation Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Comment Building Div Inspection | Not Ready | 10/5/2023 | 10/5/2023 | 10/05/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
10/05/2023
1. pre con meeting for work to begin in OR 1 looked at plans,OR, and discussed scope of work
|
||||
Planning Final Inspection | VOID | 10/30/2023 | ||
Chris Beale ((253) 841-5418) | ||||
Mechanical Rough In Inspection | Partial Pass | 7/16/2024 | 7/16/2024 | 07/16/2024 |
Shannon King ((253) 840-6684) | ||||
Combination Frame And Rough In Inspection | Partial Pass | 7/22/2024 | 7/22/2024 | 07/22/2024 |
Shannon King ((253) 840-6684) | ||||
Medical Gas Inspection | Partial Pass | 7/25/2024 | 7/25/2024 | 07/25/2024 |
Shannon King ((253) 840-6684) | ||||
Combination Frame And Rough In Inspection | Partial Pass | 7/25/2024 | 7/25/2024 | 07/25/2024 |
Shannon King ((253) 840-6684) | ||||
Combination Frame And Rough In Inspection | Partial Pass | 7/31/2024 | 7/31/2024 | 08/01/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/01/2024
1. head of wall small area above control room approved
|
||||
Wallboard / Drywall Inspection | Partial Pass | 8/2/2024 | 8/2/2024 | 08/02/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
08/02/2024
1:control window top out on or side ok.
|
||||
Combination Frame And Rough In Inspection | Partial Pass | 8/13/2024 | 8/13/2024 | 08/13/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
08/13/2024
1. head of wall small area above control room approved
|
||||
Other/Miscellaneous
Carried Forward
08/13/2024
date of inspection 8/13/2024
1.complete fire stopping
2.complete vapor barrier at west exterior wall as discussed with contractor
3.provide clarification on head of wall detail at west soffit
4.complete ceiling framing per manufactures install instructions
5. wall between control room and O/R approved for cover
|
||||
Cover Inspection/Thrust Blocks Inspection | VOID | 8/14/2024 | 8/14/2024 | 08/14/2024 |
Jeff Hill ((253) 204-5633) | ||||
Wallboard / Drywall Inspection | Not Ready | 8/14/2024 | 8/14/2024 | 08/14/2024 |
Shannon King ((253) 840-6684) | ||||
Combination Frame And Rough In Inspection | Partial Pass | 8/15/2024 | 8/15/2024 | 08/15/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
08/15/2024
1. head of wall small area above control room approved
|
||||
Other/Miscellaneous
Carried Forward
08/15/2024
date of inspection 8/13/2024
1.complete fire stopping
2.complete vapor barrier at west exterior wall as discussed with contractor
3.provide clarification on head of wall detail at west soffit
4.complete ceiling framing per manufactures install instructions
5. wall between control room and O/R approved for cover
|
||||
Combination Frame And Rough In Inspection | Partial Pass | 8/19/2024 | 8/19/2024 | 08/19/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Resolved
08/19/2024
1. head of wall small area above control room approved
|
||||
Other/Miscellaneous
Resolved
08/19/2024
date of inspection 8/13/2024
1.complete fire stopping
2.complete vapor barrier at west exterior wall as discussed with contractor
3.provide clarification on head of wall detail at west soffit
4.complete ceiling framing per manufactures install instructions
5. wall between control room and O/R approved for cover
|
||||
Wallboard / Drywall Inspection | Partial Pass | 8/19/2024 | 8/19/2024 | 08/19/2024 |
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Partial Pass | 8/21/2024 | 8/21/2024 | 08/21/2024 |
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Partial Pass | 9/10/2024 | 9/10/2024 | 09/10/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
09/10/2024
operating room south infill wall both sides ok.
|
||||
Ceiling Grid/T-Bar Inspection | Partial Pass | 9/16/2024 | 9/16/2024 | 09/16/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
09/16/2024
room 2D02
1 ; provide positive attachment of diffuser to main and cross-tee of grid.
2 ; complete rated wall signage.
3 ; complete berc clip.
4 ; seal penetrations at 1 hour fire barrier.
2D05
1 ; provide positive attachment of diffuser to main and cross-tee of grid.
2 ; seal penetrations at 1 hour firewall.
|
||||
Comment Building Div Inspection | Not Ready | 9/25/2024 | 9/25/2024 | 09/25/2024 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Resolved
09/25/2024
1. pre con meeting for work to begin in OR 1 looked at plans,OR, and discussed scope of work
|
||||
Hydronic Piping Inspection | Not Ready | 9/26/2024 | 9/26/2024 | 09/26/2024 |
Shannon King ((253) 840-6684) | ||||
Comment Building Div Inspection | Not Ready | 10/1/2024 | 10/1/2024 | 10/01/2024 |
Shannon King ((253) 840-6684) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions | |||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Standard Conditions | |||
:
• Comply with 2018 IFC and 2018 IBC
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
|||||
Miscellaneous Condition | Resolved | Engineering Division | Prior to Occupancy | ||
:
See attached email concerning frontage improvements named: PRCTI20221788 Sidewalk Improvement Discussion.pdf
Permit B-21-0225 had the following condition, but it has not been issued, so I have added it to this permit:
OCCUPANCY WILL NOT BE GRANTED UNTIL CIVIL PLANS FOR THE CONSTRUCTION OF THE SIDEWALK EXTENSION ON THE NORTH SIDE OF 13TH AVE SE HAVE BEEN SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
However, if B-21-0225 is issued first the condition of PRCTI20221788 will be:
OCCUPANCY WILL NOT BE GRANTED UNTIL THE CONSTRUCTION OF THE SIDEWALK EXTENSION ON THE NORTH SIDE OF 13TH AVE SE HAS BEEN COMPLETED AND HAS RECEIVED A FINAL APPROVAL. 05/11/2022
|
|||||
Miscellaneous Condition | Resolved | Engineering Division | Prior to Occupancy | ||
:
See attached email concerning frontage improvements named: PRCTI20221788 Sidewalk Improvement Discussion.pdfI
f permit B-21-0225 is issued first than the condition prior to occupancy of this permit IS:
OCCUPANCY WILL NOT BE GRANTED UNTIL THE CONSTRUCTION OF THE SIDEWALK EXTENSION ON THE NORTH SIDE OF 13TH AVE SE HAVE BEEN COMPLETED AND RECEIVED A FINAL APPROVAL. LL 12/08/2022
|
|||||
Engineering Commercial Standard Conditions | Open | Development & Permitting Services | Standard Conditions | ||
:
***** Approval stamp and conditions need to be added to the new construction plan set. LL 01/05/2022 ******
Development Engineering standard commercial conditions:
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
Reference Number | Status | Type |
---|---|---|
PRFA20230627 | Permit(s) Issued | Fire Alarms |
PRFS20240611 | Permit(s) Issued | Fire Sprinklers |