CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20230877
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Permit Fee | $1,133.75 | $1,133.75 | Paid | 07/07/2023 |
Building Plan Review Fee | $736.94 | $736.94 | Paid | 06/13/2023 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 07/07/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $1,895.69 | $1,895.69 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Erosion And Sediment Inspection | Passed w/ Conditions | 8/29/2023 | 08/29/2023 | |
Michael Rosenau ((253) 344-6753) | ||||
Comment Engineering Div Inspection | Partial Pass | 8/30/2023 | 08/29/2023 | |
Michael Rosenau ((253) 344-6753) | ||||
Comment Engineering Div Inspection | Partial Pass | 9/1/2023 | 9/1/2023 | 09/01/2023 |
Michael Rosenau ((253) 344-6753) | ||||
Comment Building Div Inspection | Not Ready | 9/1/2023 | 9/1/2023 | 09/01/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Resolved
10/03/2024
calling for engineering insp
|
||||
Comment Engineering Div Inspection | Partial Pass | 9/7/2023 | 9/7/2023 | 09/07/2023 |
Michael Rosenau ((253) 344-6753) | ||||
Water Inspection | Partial Pass | 09/07/2023 | ||
Michael Rosenau ((253) 344-6753) | ||||
Building Final Inspection | Not Ready | 8/6/2024 | 8/6/2024 | 08/07/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
10/03/2024
date of inspection 8/6/2024
1. provide engineering final and planning final prior to building final
|
||||
Planning Final Inspection | Passed | 8/28/2023 | 8/29/2023 | 08/08/2024 |
Chris Beale ((253) 841-5418) | ||||
Planning Final Inspection | Passed | 8/8/2024 | 08/08/2024 | |
Chris Beale ((253) 841-5418) | ||||
Engineering Final Inspection | Passed | 8/8/2024 | 8/8/2024 | 08/08/2024 |
Michael Rosenau ((253) 344-6753) | ||||
Building Final Inspection | Not Ready | 8/14/2024 | 8/14/2024 | 08/15/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
10/03/2024
date of inspection 8/6/2024
1. provide engineering final and planning final prior to building final
|
||||
Other/Miscellaneous
Resolved
10/03/2024
date of inspection 8/14/2024
1.contractor made contact prior to 830 am call was returned and 1 hour time was given (10 to 11 am) was told someone would be on site with plans
2.no one on site at time of inspection 10:55 am
|
||||
Building Final Inspection | Passed | 9/25/2024 | 9/25/2024 | 09/26/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
09/26/2024
date of inspection 8/6/2024
1. provide engineering final and planning final prior to building final
|
||||
Other/Miscellaneous
Resolved
09/26/2024
date of inspection 8/14/2024
1.contractor made contact prior to 830 am call was returned and 1 hour time was given (10 to 11 am) was told someone would be on site with plans
2.no one on site at time of inspection 10:55 am
|
||||
Footing/Setback Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Foundation/Rebar Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Slab/Insulation Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Roof Sheathing Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Shear Wall Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Firewall/Firestop Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Energy (Insulation) Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Frame Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Ceiling Grid/T-Bar Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Wallboard / Drywall Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Exit Lighting Test Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Hydronic Piping Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Refrigeration Line Test Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Exhaust Hood Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Light Test For Grease Duct Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Exhaust/Vent Fans Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Medical Gas Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Fire Or Smoke Damper Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Cover Inspection/Thrust Blocks Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Emergency Radio Test Review Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Fire Final Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Comment Building Div Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Comment Engineering Div Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Water Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) | ||||
Building Final Inspection | VOID | 8/23/2024 | 8/23/2024 | 10/03/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/23/2024
date of inspection 8/6/2024
1. provide engineering final and planning final prior to building final
|
||||
Other/Miscellaneous
Carried Forward
08/23/2024
date of inspection 8/14/2024
1.contractor made contact prior to 830 am call was returned and 1 hour time was given (10 to 11 am) was told someone would be on site with plans
2.no one on site at time of inspection 10:55 am
|
||||
Other/Miscellaneous
Outstanding
08/23/2024
1:provide third party footing inspection approval or engineer of records as built approval.
2:pulled base plate on 1 unit and it is not bolted down.
|
||||
Combination Frame And Rough In Inspection | VOID | 10/03/2024 | ||
Kevin Spruell ((253) 841-5590) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS.
2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE.
3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE.
4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY"
5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
|
||
Miscellaneous Condition | Open | Standard Conditions |
Development & Permitting Services
Add root barrier detail to plan set, found here: https://www.cityofpuyallup.org/1445/100---Roadway
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard commercial conditions:
- Prior to starting site work request an inspection for erosion and sediment.
- Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure.
- All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation.
- Curb, gutter, sidewalk and approach must be poured per city standards. Any public curb, gutter, or sidewalk broken now or during the course of construction shall be removed and replaced per City Standards.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. The sidewalk shall remain unobstructed at all times. All work to be completed on private property.
on "finished construction" and reviewed and accepted by the City of Puyallup.
|
Reference Number | Status | Type |
---|---|---|
PRSG20240457 | Permit(s) Issued | Sign/Awning |
Date Uploaded | File Type | Name |
---|---|---|
06/13/2023 | Receipt | Receipt for transaction:2023-001105 |
07/06/2023 | Plans | 2_ KorumFordEVCourt-Agency Review-BOEarc_6_13_2023 (Stamped) |
07/06/2023 | Report | 3_ Korum EV Court Structural Calculations 6_2023 (Stamped) |
07/07/2023 | Letter | Permit - Detailed |
07/07/2023 | Receipt | Receipt for transaction:2023-001274 |
08/29/2023 | Report | Inspection Report (Erosion And Sediment Inspection) |
02/05/2024 | Letter | Permit Expiration Notice |
08/05/2024 | Letter | Permit Expiration Notice |
08/07/2024 | Report | Inspection Report (Building Final Inspection) |
08/08/2024 | Report | Inspection Report (Engineering Final Inspection) |
08/15/2024 | Report | Inspection Report (Building Final Inspection) |
09/26/2024 | Report | Inspection Report (Building Final Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.