Summary

PRCTI20250675
Commercial - Tenant Improvement/Remodel
Closed
CASCADE CHRISTIAN SCHOOLS
Alteration/Remodel
We are adding 3 sinks with permanent cabinets in an existing classroom. No doors, windows, or structural walls are being affected. Existing plumbing is already in walls for waste and water lines. - CASCADE CHRISTIAN
05/20/2025
07/02/2025
02/21/2026
08/25/2025

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Fire Review Approved 06/30/2025 06/26/2025
Planning Review VOID 06/30/2025 06/23/2025
Design Review VOID 06/30/2025 06/20/2025
Engineering Review Approved 06/30/2025 06/20/2025
Building Review Approved 06/30/2025 06/18/2025
Engineering Traffic Review VOID 06/30/2025 06/12/2025
Design Review VOID 06/30/2025 06/11/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 07/02/2025
Building Permit Fee $748.75 $748.75 Paid 07/02/2025
Plumbing Fixtures Fee $39.00 $39.00 Paid 07/02/2025
Plumbing Permit Fee $40.00 $40.00 Paid 07/02/2025
Building Plan Review Fee $486.69 $486.69 Paid 06/10/2025
Plumbing Plan Review Fee $51.35 $51.35 Paid 06/10/2025
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 07/02/2025
Sewer System Development Charge Fee - Tenant Improvment/Addition $2,635.08 $2,635.08 Paid 07/02/2025
Water System Development Charge Fee - Tenant Improvment/Addition $2,167.38 $2,167.38 Paid 07/02/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Plumbing Rough In Inspection Failed 7/23/2025 7/23/2025 07/23/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
07/23/2025
1.contractor not on-site at time of inspection. (10:43 am) 2.no city approved plans on-site at time of inspection. 3. plumbing not on test.

Plumbing Rough In Inspection Failed 7/29/2025 7/29/2025 07/29/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
07/29/2025
1.contractor not on-site at time of inspection. (10:43 am) 2.no city approved plans on-site at time of inspection. 3. plumbing not on test.

Other/Miscellaneous
Carried Forward
07/29/2025
1 ; provide plumbing test on d.w.v. as discussed with contractor.

Frame Inspection Passed 7/30/2025 7/30/2025 07/30/2025
Shannon King ((253) 840-6684)
Shear Wall Inspection Passed 7/30/2025 7/30/2025 07/30/2025
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Passed 7/30/2025 7/30/2025 07/30/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
07/30/2025
1 ; provide plumbing test on d.w.v. as discussed with contractor.

Wallboard / Drywall Inspection Passed 8/5/2025 8/5/2025 08/05/2025
Shannon King ((253) 840-6684)
Building Final Inspection Failed 8/21/2025 8/21/2025 08/21/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
08/25/2025
provide hammer arrestor on supply line of dishwasher.

Building Final Inspection Passed 8/25/2025 08/25/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
08/25/2025
provide hammer arrestor on supply line of dishwasher.

Comment Building Div Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Footing/Setback Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Slab/Insulation Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Roof Sheathing Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Exit Lighting Test Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Hydronic Piping Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Exhaust Hood Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Shower Pan Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Medical Gas Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Hydrostatic Test 200Lbs 2Hrs VOID 08/25/2025
Shannon King ((253) 840-6684)
Emergency Radio Test Review Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Engineering Final Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Planning Final Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Fire Final Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)
Plumbing Final Inspection VOID 08/25/2025
Shannon King ((253) 840-6684)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS. 2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE. 3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE. 4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY" 5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
05/22/2025 Letter Incomplete Application Notice
05/29/2025 Letter Incomplete Application Notice
05/30/2025 Letter Incomplete Application Notice
06/02/2025 Letter Incomplete Application Notice
06/04/2025 Letter Incomplete Application Notice
06/10/2025 Receipt Receipt for transaction:2025-001103
06/27/2025 Form Full Puyallup Permit App (Flattened)
06/27/2025 Form PLUMBING FIXTURE WORKSHEET (Stamped)
06/27/2025 Plans FLOOR PLAN (Stamped)
06/27/2025 Plans PLUMBING PLANS - WATER LINES (Stamped)
06/27/2025 Plans PLUMBING PLANS (Stamped)
06/27/2025 Plans PLUMBING PLANS - EXISTING PLUMBING LINES (Stamped)
07/02/2025 Letter Permit - Detailed
07/02/2025 Receipt Receipt for transaction:2025-001306
07/23/2025 Report Inspection Report (Plumbing Rough In Inspection)
07/29/2025 Report Inspection Report (Plumbing Rough In Inspection)
07/30/2025 Report Inspection Report (Frame Inspection)
07/30/2025 Report Inspection Report (Shear Wall Inspection)
07/30/2025 Report Inspection Report (Plumbing Rough In Inspection)
08/05/2025 Report Inspection Report (Wallboard / Drywall Inspection)
08/05/2025 Report Inspection Report (Plumbing Rough In Inspection)
08/25/2025 Report Inspection Report (Building Final Inspection)