CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRSG20220884


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRSG20220884
Sign/Awning
Closed
PUYALLUP 15TH AVENUE LLC
Replacement
Install (x3) LED wall signs to existing circuits install
05/31/2022
07/11/2022
05/20/2023
11/21/2022

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 07/11/2022 07/08/2022
Engineering Review Approved 07/11/2022 07/06/2022
Building Review Approved 07/11/2022 07/06/2022
Planning Review Failed 06/19/2022 06/17/2022
Building Review Approved 06/19/2022 06/15/2022
Engineering Review Approved 06/19/2022 06/10/2022
Building Review Approved 06/20/2022 06/07/2022
Engineering Review Approved 06/20/2022 06/06/2022
Planning Review Failed 06/20/2022 06/02/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $209.25 $209.25 Paid 07/11/2022
Building Plan Review Fee $136.01 $136.01 Paid 05/31/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 07/11/2022
Resubmittal/Revision Fee $130.00 $130.00 Paid 06/09/2022
Resubmittal/Revision Fee $130.00 $130.00 Paid 06/30/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Sign Final Inspection Partial Pass 11/16/2022 11/16/2022 11/16/2022
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
11/16/2022
1:north wall sign and west (entry) sign ok, no south or monument sign installed yet.

Sign Final Inspection Passed 11/21/2022 11/21/2022
Monty Johnson ((253) 770-3326)
Sign Footing Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Sign Attachment Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Miscellaneous Condition Open
Development & Permitting Services
Development Engineering permit conditions: No work permitted in the public right-of-way. All work shall be completed on private property unless the applicant acquires a City of Puyallup Right-of-Way permit. No change to existing monument sign base or overall sign height. The new monument sign shall be located entirely within the monument sign easement as defined by the FAIRFIELD INN plat attached in CityView. The existing base is located within the easement.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
05/31/2022 Receipt Receipt for transaction:2022-001002
06/06/2022 132 FAIRFIELD INN BINDING SITE PLAN MODIFICATION NE OF SE 33 T 20 R 4
06/08/2022 Letter Permit Review Comment Notice
06/08/2022 Form Application form1 (Flattened)
06/08/2022 Plans 132_FAIRFIELD INN RECORD DRAWINGS0 (Flattened)
06/08/2022 Other Sign permit submittal documents1 (Flattened)
06/09/2022 Receipt Receipt for transaction:2022-001070
06/30/2022 Receipt Receipt for transaction:2022-001231
07/08/2022 Other Revised Sign Permit Submittal documents 06-29-22 (Stamped)
07/08/2022 Plans Revised Site Plan 06-29-23 (1) (Stamped)
07/11/2022 Letter Permit - Detailed
07/11/2022 Receipt Receipt for transaction:2022-001316


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.