Review Type
Outcome
Est. Completion Date
Completed
Building Review
No Comments
03/15/2024
02/12/2024
Reviewer:
Reviewer Comments:
Engineering Traffic Review
No Comments
03/15/2024
02/08/2024
Reviewer:
Reviewer Comments:
Fire Review
No Comments
03/15/2024
02/08/2024
Reviewer:
Reviewer Comments:
Planning Review
No Comments
03/15/2024
02/08/2024
Reviewer:
Corrections:
Correction 1:
Other/Miscellaneous
Comments:
Planning consulted with Police on the submittal. Please provide a response to the following comment:
"Puyallup PD Comment: We have a need for an emergency vehicle access point at the Gold Gate. That is where many of our police vehicles are staged during the fair, and in the case of an active shooter or other large disruption where we would have an urgent need to get some of our patrol vehicles that have ballistic doors inside the grounds, this would be a major concern.
In addition. We use that existing vehicle access point routinely and daily during the fair, to stage a marked police car inside the grounds near the fountain as a crime deterrence tactic.
I could not readily tell from the plans if the vehicle access gate stays in place.
Finally, we support anything they can do to move more people back away from the street as sometimes when the lines are long people get very, very close to the curb with S Meridian ST.
Good lighting is also important to us as well as maintaining the good cameras system they already have in place."
Reviewer Comments:
Engineering Review
No Comments
03/15/2024
02/01/2024
Reviewer:
Corrections:
Correction 1:
See Document Markup
Comments:
Purpose of cut is not defined. Likely the Permeable pavement and infiltration trench excavation, but should be denoted here. [SEPA, Pg 5]
Correction 2:
See Document Markup
Comments:
The infiltration trench is designed with perforated pipe and is therefore a UIC well per Ecology definition. This counts as a discharge into the groundwater. [ SEPA, Pg 8]
Correction 3:
See Document Markup
Comments:
Stormwater is a utility. [SEPA, Pg 23]
Reviewer Comments:
Engineering Traffic Review
No Comments
02/26/2024
01/23/2024
Reviewer:
Corrections:
Correction 1:
Other/Miscellaneous
Comments:
The following conditions have been added:
Design must comply with code section 20.60.001(4):
“To ensure that signs in the city do not adversely affect pedestrian and traffic safety by obstructing vehicle sight distance, interfering with official traffic signs, signals and devices, and unduly directing attention away from the demands of safe driving;”
Project will be prohibited from installing digital signage due to driver distraction concerns and proximity to the 9th Ave & S Meridian traffic signal (high vehicle/pedestrian volumes).
Programmed lighting may require modification (at the discretion of the City) to ensure driver distraction concerns are mitigated (flashing/strobing lighting adjacent to a high-volume traffic signal is a potential public safety concern).
Reviewer Comments:
Fire Review
No Comments
02/26/2024
01/22/2024
Reviewer:
Reviewer Comments:
Approval will require an onsite medic unit testing the auto-turn radius prior to TCO or Final.
Planning Review
Comments
02/26/2024
01/18/2024
Reviewer:
Corrections:
Correction 1:
Other/Miscellaneous
Comments:
Planning consulted with Police on the submittal. Please provide a response to the following comment:
"Puyallup PD Comment: We have a need for an emergency vehicle access point at the Gold Gate. That is where many of our police vehicles are staged during the fair, and in the case of an active shooter or other large disruption where we would have an urgent need to get some of our patrol vehicles that have ballistic doors inside the grounds, this would be a major concern.
In addition. We use that existing vehicle access point routinely and daily during the fair, to stage a marked police car inside the grounds near the fountain as a crime deterrence tactic.
I could not readily tell from the plans if the vehicle access gate stays in place.
Finally, we support anything they can do to move more people back away from the street as sometimes when the lines are long people get very, very close to the curb with S Meridian ST.
Good lighting is also important to us as well as maintaining the good cameras system they already have in place."
Reviewer Comments:
Engineering Review
Comments
02/26/2024
01/10/2024
Reviewer:
Corrections:
Correction 1:
See Document Markup
Comments:
Purpose of cut is not defined. Likely the Permeable pavement and infiltration trench excavation, but should be denoted here. [SEPA, Pg 5]
Correction 2:
See Document Markup
Comments:
The infiltration trench is designed with perforated pipe and is therefore a UIC well per Ecology definition. This counts as a discharge into the groundwater. [ SEPA, Pg 8]
Correction 3:
See Document Markup
Comments:
Stormwater is a utility. [SEPA, Pg 23]
Reviewer Comments:
Building Review
No Comments
02/26/2024
01/08/2024
Reviewer:
Reviewer Comments:
See PRCNC20231607 for building review comments.