CITY OF PUYALLUP PERMITTING PORTAL
Engineering Permit Application Status
PRCCP20231620
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Engineering Inspection Fee (3%) | $13,409.75 | $13,409.75 | Paid | 05/02/2024 |
Engineering Permit Fee | $300.00 | $300.00 | Paid | 05/02/2024 |
Civil Review Fee | $470.00 | $470.00 | Paid | 11/16/2023 |
Record Drawing Review Fee | $200.00 | $200.00 | Paid | 11/16/2023 |
Civil Review Additional Fee | $2,880.00 | $2,880.00 | Paid | 03/12/2024 |
Civil Review Additional Fee | $1,170.00 | $1,170.00 | Paid | 04/19/2024 |
Civil Review Additional Fee | $810.00 | $810.00 | Paid | 05/02/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $19,239.75 | $19,239.75 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Erosion And Sediment Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Engineering Final Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Planning Landscape Inspection | Pending | |||
Engineering Daily Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Engineering Punchlist Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Engineering Preconstruction Inspection (Pre-Con Meeting) | Passed | 5/13/2024 | 05/14/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Job Start Inspection | Passed | 5/20/2024 | 05/20/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/21/2024 | 05/21/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/22/2024 | 05/23/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/23/2024 | 05/23/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/28/2024 | 05/29/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/29/2024 | 05/30/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/30/2024 | 06/03/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 5/31/2024 | 06/03/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/3/2024 | 06/04/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/4/2024 | 06/04/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/10/2024 | 06/11/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/11/2024 | 06/12/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/12/2024 | 06/13/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/13/2024 | 06/14/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/14/2024 | 06/14/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/17/2024 | 06/18/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/20/2024 | 06/21/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 6/24/2024 | 06/24/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/2/2024 | 07/03/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/3/2024 | 07/03/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/8/2024 | 07/09/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/9/2024 | 07/11/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/11/2024 | 07/11/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/15/2024 | 07/15/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/16/2024 | 07/16/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/17/2024 | 07/17/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/22/2024 | 07/22/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/23/2024 | 07/23/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/5/2024 | 08/05/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/6/2024 | 08/06/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/7/2024 | 08/07/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/9/2024 | 08/09/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/12/2024 | 08/12/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/13/2024 | 08/13/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/15/2024 | 08/15/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/16/2024 | 08/16/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/19/2024 | 08/20/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/20/2024 | 08/20/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Punchlist Inspection | Not Ready | 8/26/2024 | 8/26/2024 | 08/27/2024 |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 8/27/2024 | 08/27/2024 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/9/2025 | 01/09/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/10/2025 | 01/10/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/22/2025 | 01/22/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/24/2025 | 01/24/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 1/27/2025 | 01/27/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/4/2025 | 02/04/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/5/2025 | 02/05/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/10/2025 | 02/11/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 2/25/2025 | 02/27/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 3/3/2025 | 03/04/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 4/4/2025 | 04/04/2025 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Punchlist Inspection | Not Ready | 6/4/2025 | 6/4/2025 | 06/04/2025 |
Jeff Hill ((253) 204-5633) |
Condition | Status | Category |
---|---|---|
Ready to Issue - Need Contractor Info | Resolved | Prior to Issuance |
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
VERIFIED L&I ALONG WITH COP BUSINESS LIC, ALL IS CURRENT TO DATE [Julie Johnson @ 05/01/2024 1:17 PM]
|
||
Civil Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard civil construction conditions:
1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
2. Construction permitted as per approved civil plans.
3. Construction permit shall expire by limitation and be declared void if:
a. Work is not started within 180 days of obtaining the permit.
b. Work is abandoned for 180 days or more after beginning work.
c. After two years from the date of permit issuance, regardless of whether work is finished.
4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with an application fee to the Engineering Services Staff for review.
6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority.
8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval.
9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits.
10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
||
Pre-Construction Meeting | Resolved | Standard Conditions |
Engineering Division
Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
|
||
Performance Bond | Resolved | Prior to Issuance |
Engineering Division
A STORMWATER Performance Bond must be received by the City of Puyallup prior to permit issuance. The STORMWATER Performance Bond shall be 125% of the estimated cost of work FOR THE STORMWATER FACILITY per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). [Robyn Buck @ 01/09/2024 4:45 PM]
|
||
Inadvertent Discovery Plan (IDP) | Resolved | Prior to Issuance |
Engineering Division
Email a signed Inadvertent Discovery Plan to lhollingsworth@PUYALLUPWA.GOV.
|
||
Certificate of Insurance/CG2012 | Resolved | Prior to Issuance |
Engineering Division
Certificate or Insurance/CG2012 must be received prior to issuance
|
||
Clear, Fill, and Grade Bond | Resolved | Prior to Issuance |
Engineering Division
A Clear, Fill and, Grade Bond must be received by the City of Puyallup prior to permit issuance. The amount of the bond shall not be less than the total estimated construction cost of the interim and permanent erosion and sediment control measures per the approved cost estimate received prior to plan approval. See https://www.cityofpuyallup.org/DocumentCenter/View/16621/CFG-Bond-101822-appvd-by-Legal for more information. **NOT REQUIRED** [Robyn Buck @ 01/09/2024 4:44 PM]
|
||
Miscellaneous Condition | Open | Standard Conditions |
Traffic Division
Applicant team must coordinate with ongoing design of 9th Ave SW (City capital project) to minimize possible conflicts (road design, utilities, bollards, etc).
Please contact Ryan M. Rutkosky, P.E for more information:
D: (253) 841-5473 | C: (253) 381-7902
|
||
Stormwater Maintenance Agreement (SWA) | Open | Prior to Occupancy |
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
|
||
Backflow Protection Device - Commercial RPBA | Open | Prior to Completion |
Engineering Division
2 approved reduced pressure backflow assemblies (RPBA) device are required to be installed on the commercial water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
Engineering Cost Breakdown Fee Calculation | Resolved | Standard Conditions |
Engineering Division
Engineering Cost Breakdown Fee Calculation must be received for Reviewer to verify valuation for fee calculations
|
||
Miscellaneous Condition | Open | Prior to Completion |
Development & Permitting Services
Install foundation to ensure drainage discharges to sewer. [Lance Hollingsworth @ 04/30/2024 3:51 PM]
|
||
Punchlist: Miscellaneous Stormwater A Item | Open | Storm Punchlist Section A |
Development & Permitting Services
Finish grout all storm structures.
|
||
Punchlist: Provide RPBA Test Results | Open | Water Punchlist Section A |
Development & Permitting Services
Provide the City with the test results for the Reduced Pressure Backflow Assembly (RPBA).
|
||
Punchlist: Miscellaneous A Item | Open | Misc. Punchlist Section A |
Development & Permitting Services
complete all hard surfaces
|
||
Punchlist: Miscellaneous B Item | Open | Misc. Punchlist Section B |
Development & Permitting Services
remove and replace damaged concrete around SDCB#1
|
||
Punchlist: Miscellaneous A Item | Open | Misc. Punchlist Section A |
Development & Permitting Services
finish landscaping
|
||
Punchlist: Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection | Open | Misc. Punchlist Section A |
Development & Permitting Services
Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection. Landscape requirements to be added to the punchlist.
|
||
Punchlist: Miscellaneous Streets A Item | Open | Street Punchlist Section A |
Development & Permitting Services
relocate the flower pots on Meridian out of the ADA pathway.
|
||
Punchlist: Provide the City a letter from the Design Engineer for the proper install of the stormwater BMP’s | Open | Storm Punchlist Section A |
Engineering Division
Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
|
||
Punchlist: Provide the City with an electronic version of the record drawings | Open | Misc. Punchlist Section B |
Engineering Division
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
|
||
Punchlist: Provide the City with a signed stormwater agreement | Open | Storm Punchlist Section B |
Engineering Division
Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described in item 3 as a recorded exhibit.
|
Reference Number | Status | Type |
---|---|---|
PRCNC20231607 | Permit(s) Issued | Commercial - New Construction |
PRSG20240960 | Permit(s) Issued | Sign/Awning |
PRFN20241193 | Permit(s) Issued | Fence |
PRROW20241250 | Closed | Right-of-Way Permit |
PRCA20241630 | Permit(s) Issued | Commercial - Addition |
PRCTI20241753 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PLPRE20230085 | File Closed | Pre-Application |
PLSSP20230129 | File Closed | SEPA Standalone |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.