Stantec Consultants Inc. will have Cascade Drilling bore two (2) Soil Borings (SB-34, SB-35), and two (2) Monitoring Wells (MW-22, MW-23). MW-22 will be hand cleared to 8ft Bgs using an air knife, vacuum, and hand auger, drilled using geoprobe to a total depth of 15ft bgs. A permanent 2-inch monitoring well screened between 3-10ft, completed with a traffic-rated monument. MW-23 will be drilled with the same specifications, using the same equipment, but to a depth of 17ft. SB-34 will be hand cleared to 6 feet using an air knife, vacuum, and hand auger to a total depth of 6ft bgs. Boring will be decommissioned, patched with concreate and dyed to match surrounding pavement. SB-35 will be hand cleared to 8ft bgs using an air knife, vacuum, and hand auger, drilled using a geoprobe to a total depth of 17ft bgs. The boring will be decommissioned, patched with concrete and dyed to match the surrounding pavement.
|