Civil Standard Conditions
|
Resolved
|
Engineering Division
|
Standard Conditions
|
|
|
:
1. Construction permitted as per approved civil plans.
2. Construction permit shall expire by limitation and be declared void if:
* Work is not started within 180 days of obtaining the permit
* Work is abondoned for 180 days or more after beginning work
* After two years from the date of permit issuance, regardless of whether work is finished
3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review.
5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
|
Landscape Assignment
|
Resolved
|
Development & Permitting Services
|
|
|
|
:
Note: This will add another inspection prior to occupancy if not resolved
|
Pipeline Notfication Rcw 19.122.033
|
Resolved
|
Engineering Division
|
Standard Conditions
|
|
|
:
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
|
Certificate of Insurance/CG2012
|
Resolved
|
Engineering Division
|
Prior to Issuance
|
|
|
:
Certificate or Insurance/CG2012 must be received prior to issuance
|
Engineering Cost Breakdown Fee Calculation
|
Resolved
|
Engineering Division
|
Prior to Issuance
|
|
|
:
Engineering Cost Breakdown Fee Calculation must be received for Reviewer to verify valuation for fee calculations
|
Letter of Authorization to Apply Permit
|
Resolved
|
Engineering Division
|
Prior to Issuance
|
|
|
:
Letter of Authorization to Apply for Permit must be received prior to issuance
|
Right-of-Way Occupation Bond
|
Resolved
|
Engineering Division
|
Prior to Issuance
|
|
|
:
Street Obstruction Bond must be received prior to issuance
|
Punchlist: Complete all required street monumentation
|
Resolved
|
Development & Permitting Services
|
Street Punchlist Section B
|
|
|
:
Complete all required street monumentation.
|
Punchlist: Developer/Contractor to secure all street-lighting J-boxes
|
Resolved
|
Development & Permitting Services
|
Street Punchlist Section B
|
|
|
:
Developer/contractor shall be responsible to secure all street-lighting j-boxes by placing an ecology block temporarily over the top of the boxes until such time as the sidewalks adjacent to the j-boxes are poured and the boxes are incorporated into the permanent concrete sidewalks. (Alternate: Developer/contractor shall be responsible to secure all street-lighting j-boxes from vandalism and theft until such time that the street lighting is accepted and under operation by the City. J-boxes shall be secured by placing an ecology block temporarily over the top of the boxes, tack welding the lids, or other means which will not permanently damage the j-boxes. Upon request of the City, temporary protection measures shall be removed and the j-boxes restored, as necessary, to their original installed condition.)
|
Miscellaneous Condition
|
Resolved
|
Engineering Division
|
Prior to Completion
|
|
|
:
8. Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
|
Miscellaneous Condition
|
Resolved
|
Engineering Division
|
Prior to Completion
|
|
|
:
10. Verify that all overtime fees have been paid. Contact Engineering Support Specialist Robyn Buck at 253.435.3617, or via email at RBuck@ci.puyallup.wa.us.
|
Miscellaneous Condition
|
Resolved
|
Engineering Division
|
Prior to Completion
|
|
|
:
11. Provide the City with an electronic version of the record drawings
|
Miscellaneous Condition
|
Resolved
|
Engineering Division
|
Prior to Completion
|
|
|
:
12. Provide the City with a DRAFT copy of the Stormwater Management & BMP Facilities Agreement associated with the Kessler Project.
|
Landscape Assignment
|
Resolved
|
Planning Division
|
Prior to Completion
|
|
|
:
Note: This will add another inspection prior to occupancy if not resolved
|
Miscellaneous Condition
|
Resolved
|
Engineering Division
|
Prior to Completion
|
|
|
:
13. Provide a recorded copy of the agreed upon and executed stormwater easement and maintenance agreement associated with discharge of 17th St SW stormwater into the District’s conveyance system as part of the original ITC project.
|
Miscellaneous Condition
|
Resolved
|
Engineering Division
|
Prior to Completion
|
|
|
:
14. Execute and record any water easement(s) associated with Fruitland Mutual Water Company’s water system. Provide acknowledgment from Fruitland Mutual Water Company that the work is complete and the project can be closed.
|
Miscellaneous Condition
|
Resolved
|
Engineering Division
|
Prior to Completion
|
|
|
:
15. Execute and record a “revised” maintenance access and utility easement which provides adequate accessibility to the City maintained sewer lift station.
|
Miscellaneous Planning Condition
|
Resolved
|
Planning Division
|
Prior to Completion
|
|
|
:
Paved area east of the Summit modular building failed to be recorded with the City as a plan change request. All changes from approved civil permit shall be included on final record drawings.
|