E-19-0574


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

E-19-0574
Civil Construction Permit
Closed
PUYALLUP SCHOOL DIST NO 3
Other
CIVILS ~ PSD KESSLER CENTER 2-STORY EDUCATIONAL BUILDING
12/24/2019
06/11/2020
04/25/2023
10/27/2022

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 06/20/2020
Engineering Storm Review Approved 12/24/2019 06/11/2020
Public Works Water Review Approved 12/24/2019 06/11/2020
Engineering Traffic Review Approved 05/04/2020 06/11/2020
Engineering Traffic Review Approved 12/24/2019 06/11/2020
Public Works Streets Review Approved 12/24/2019 06/11/2020
Engineering Civil Review Approved 12/24/2019 06/11/2020
Public Works Collection Review Approved 06/08/2020
Engineering Civil Review Approved 04/07/2020 05/20/2020
Planning Review Approved 04/21/2020 04/21/2020
Planning Review Approved 12/24/2019 03/18/2020

Fees

Paid Fees Amount Paid Owing Date Paid
Traffic Control Plan Review Fee $40.00 $40.00 Paid 06/11/2020
No
Traffic Control Permit Fee $50.00 $50.00 Paid 06/11/2020
No
Planning Landscape Review Fee $300.00 $300.00 Paid 06/11/2020
No
Engineering Inspection Fee (3%) $26,974.83 $26,974.83 Paid 06/11/2020
No
Engineering Permit Fee $300.00 $300.00 Paid 06/11/2020
No
Storm System Development Charge $159,397.00 $159,397.00 Paid 06/11/2020
No
Civil Review Additional Fee $5,590.00 $5,590.00 Paid 06/11/2020
No
Record Drawing Review Fee $200.00 $200.00 Paid 12/26/2019
No
Civil Review Fee $470.00 $470.00 Paid 12/26/2019
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Daily Inspection Partial Pass 12/14/2021 01/25/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/25/2022 01/25/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/26/2022 01/26/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/27/2022 01/28/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 1/31/2022 02/01/2022
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 2/28/2022 02/28/2022
Michael Rosenau ((253) 344-6753)

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Resolved Engineering Division Standard Conditions
: 1. Construction permitted as per approved civil plans. 2. Construction permit shall expire by limitation and be declared void if: * Work is not started within 180 days of obtaining the permit * Work is abondoned for 180 days or more after beginning work * After two years from the date of permit issuance, regardless of whether work is finished 3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. 6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. The Applicant shall defend, indemnify, and hold the City, its officers, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Applicant or on the Applicant's behalf out of issuance of this permit.
Landscape Assignment Resolved Development & Permitting Services
: Note: This will add another inspection prior to occupancy if not resolved
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Certificate of Insurance/CG2012 Resolved Engineering Division Prior to Issuance
: Certificate or Insurance/CG2012 must be received prior to issuance
Engineering Cost Breakdown Fee Calculation Resolved Engineering Division Prior to Issuance
: Engineering Cost Breakdown Fee Calculation must be received for Reviewer to verify valuation for fee calculations
Letter of Authorization to Apply Permit Resolved Engineering Division Prior to Issuance
: Letter of Authorization to Apply for Permit must be received prior to issuance
Right-of-Way Occupation Bond Resolved Engineering Division Prior to Issuance
: Street Obstruction Bond must be received prior to issuance
Punchlist: Complete all required street monumentation Resolved Development & Permitting Services Street Punchlist Section B
: Complete all required street monumentation.
Punchlist: Developer/Contractor to secure all street-lighting J-boxes Resolved Development & Permitting Services Street Punchlist Section B
: Developer/contractor shall be responsible to secure all street-lighting j-boxes by placing an ecology block temporarily over the top of the boxes until such time as the sidewalks adjacent to the j-boxes are poured and the boxes are incorporated into the permanent concrete sidewalks. (Alternate: Developer/contractor shall be responsible to secure all street-lighting j-boxes from vandalism and theft until such time that the street lighting is accepted and under operation by the City. J-boxes shall be secured by placing an ecology block temporarily over the top of the boxes, tack welding the lids, or other means which will not permanently damage the j-boxes. Upon request of the City, temporary protection measures shall be removed and the j-boxes restored, as necessary, to their original installed condition.)
Miscellaneous Condition Resolved Engineering Division Prior to Completion
: 8. Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
Miscellaneous Condition Resolved Engineering Division Prior to Completion
: 10. Verify that all overtime fees have been paid. Contact Engineering Support Specialist Robyn Buck at 253.435.3617, or via email at RBuck@ci.puyallup.wa.us.
Miscellaneous Condition Resolved Engineering Division Prior to Completion
: 11. Provide the City with an electronic version of the record drawings
Miscellaneous Condition Resolved Engineering Division Prior to Completion
: 12. Provide the City with a DRAFT copy of the Stormwater Management & BMP Facilities Agreement associated with the Kessler Project.
Landscape Assignment Resolved Planning Division Prior to Completion
: Note: This will add another inspection prior to occupancy if not resolved
Miscellaneous Condition Resolved Engineering Division Prior to Completion
: 13. Provide a recorded copy of the agreed upon and executed stormwater easement and maintenance agreement associated with discharge of 17th St SW stormwater into the District’s conveyance system as part of the original ITC project.
Miscellaneous Condition Resolved Engineering Division Prior to Completion
: 14. Execute and record any water easement(s) associated with Fruitland Mutual Water Company’s water system. Provide acknowledgment from Fruitland Mutual Water Company that the work is complete and the project can be closed.
Miscellaneous Condition Resolved Engineering Division Prior to Completion
: 15. Execute and record a “revised” maintenance access and utility easement which provides adequate accessibility to the City maintained sewer lift station.
Miscellaneous Planning Condition Resolved Planning Division Prior to Completion
: Paved area east of the Summit modular building failed to be recorded with the City as a plan change request. All changes from approved civil permit shall be included on final record drawings.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
02/14/2022 Letter Inspection Punch List
06/09/2022 Agreement 015 PSD WAREHOUSE EXPANSION RECORDED SWA
08/01/2022 Agreement 021 PSD KESSLER CENTER RECORDED STORMWATER AGREEMENT
10/18/2022 Easement PSD SANITARY SEWER LIFT STATION EASEMENT
10/27/2022 Report 2022-10-25 E-19-0574 Kessler Center Storm Cert Letter
10/27/2022 Plans E-19-0574 Kessler Center Construction As-Built Drawings rev1
10/27/2022 Easement PSD_Fruitland Mutual Water Agrmt._Kessler Center Project_Recorded
10/28/2024 Letter Bond Release Letter
12/24/2019 Plans bioretention.docx
12/24/2019 Plans e-19-0574 resub kessler sight distance analysis.pdf
12/24/2019 Plans e-19-0574 approved landscape plans-f.pdf
12/24/2019 Plans e-19-0574 cswppp.pdf
12/24/2019 Plans e-19-0574 kessler storm water report review.pdf
12/24/2019 Plans e-19-0574 resub delivery truck-layout1.pdf
12/24/2019 Plans e-19-0574 resub fire truck-layout1.pdf
12/24/2019 Plans e-19-0574 resub 1 geotech report addend1.pdf
12/24/2019 Plans e-19-0574 resub 1 geotech report addend1.pdf
12/24/2019 Plans e-19-0574 resub 1 geotech report addend2 (infiltration).pdf
12/24/2019 Plans e-19-0574 resub 1 geotech report addend2 (infiltration).pdf
12/24/2019 Plans e-19-0574 resub bus-layout1.pdf
12/24/2019 Plans e-19-0574 resub kessler stormwater site plan.pdf
12/24/2019 Plans e-19-0574 stormwater site plan.pdf
12/24/2019 Plans infiltration trench.docx


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.