CITY OF PUYALLUP PERMITTING PORTAL
Engineering Permit Application Status
E-21-0440
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Engineering Inspection Fee (3%) | $1,665.72 | $1,665.72 | Paid | 01/24/2022 |
Engineering Permit Fee | $300.00 | $300.00 | Paid | 01/24/2022 |
Civil Review Fee | $470.00 | $470.00 | Paid | 01/24/2022 |
Record Drawing Review Fee | $200.00 | $200.00 | Paid | 01/24/2022 |
Civil Review Additional Fee | $1,820.00 | $1,820.00 | Paid | 01/24/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $4,455.72 | $4,455.72 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Engineering Preconstruction Inspection (Pre-Con Meeting) | VOID | 01/25/2022 | ||
Robyn Buck ((253) 435-3617) | ||||
Erosion And Sediment Inspection | Passed w/ Conditions | 02/01/2022 | ||
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Outstanding
02/01/2022
Contractor need to pay attention to the run off in the parking lot and the pond.
|
||||
Job Start Inspection | Passed w/ Conditions | 02/01/2022 | ||
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Outstanding
02/01/2022
Contractor changed 3" FM location on site. This needs to be picked up on the as-builts.
|
||||
Engineering Daily Inspection | Partial Pass | 2/2/2022 | 02/02/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/3/2022 | 02/03/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/4/2022 | 02/04/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/7/2022 | 02/07/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/9/2022 | 02/09/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | VOID | 02/09/2022 | ||
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/10/2022 | 02/10/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/11/2022 | 02/11/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 02/11/2022 | ||
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/14/2022 | 02/14/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/18/2022 | 02/18/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/21/2022 | 02/21/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/23/2022 | 02/23/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 2/28/2022 | 02/28/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 3/1/2022 | 03/01/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/20/2022 | 04/20/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | VOID | 04/20/2022 | ||
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/21/2022 | 04/21/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/22/2022 | 04/22/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | VOID | 04/25/2022 | ||
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/25/2022 | 04/25/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/26/2022 | 04/26/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/27/2022 | 04/27/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/28/2022 | 04/28/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 4/29/2022 | 04/29/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Failed | 5/4/2022 | 05/04/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/5/2022 | 05/05/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/6/2022 | 05/06/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/9/2022 | 05/09/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/10/2022 | 05/10/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/11/2022 | 05/11/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/12/2022 | 05/16/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/17/2022 | 05/17/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/18/2022 | 05/18/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/19/2022 | 05/19/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/20/2022 | 05/20/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/23/2022 | 05/23/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/24/2022 | 05/24/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/25/2022 | 05/25/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/26/2022 | 05/26/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 5/31/2022 | 05/31/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/2/2022 | 06/02/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/14/2022 | 06/14/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Engineering Daily Inspection | Partial Pass | 6/15/2022 | 06/15/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Engineering Daily Inspection | Partial Pass | 6/16/2022 | 06/16/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Engineering Daily Inspection | Partial Pass | 6/17/2022 | 06/17/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Engineering Daily Inspection | Partial Pass | 6/21/2022 | 06/21/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Engineering Daily Inspection | Partial Pass | 6/24/2022 | 06/24/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/27/2022 | 06/27/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 6/30/2022 | 06/30/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/1/2022 | 07/01/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/5/2022 | 07/05/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/6/2022 | 07/06/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/7/2022 | 07/07/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/8/2022 | 07/11/2022 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Daily Inspection | Partial Pass | 7/11/2022 | 07/11/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/13/2022 | 07/13/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/14/2022 | 07/14/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/18/2022 | 07/18/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/20/2022 | 07/20/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/21/2022 | 07/21/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/22/2022 | 07/22/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/25/2022 | 07/25/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/27/2022 | 07/27/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 7/29/2022 | 07/29/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/1/2022 | 08/01/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/11/2022 | 08/11/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Daily Inspection | Partial Pass | 8/16/2022 | 08/16/2022 | |
Jason Little ((253) 244-0387) | ||||
Engineering Punchlist Inspection | VOID | 08/23/2022 | ||
Jason Little ((253) 244-0387) | ||||
Engineering Punchlist Inspection | Failed | 8/23/2022 | 8/24/2022 | 08/24/2022 |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/24/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Failed | 8/24/2022 | 08/24/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/24/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 8/26/2022 | 08/26/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/26/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 8/30/2022 | 08/30/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/30/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 8/31/2022 | 08/31/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/31/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/1/2022 | 09/01/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/01/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/2/2022 | 09/02/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/02/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/6/2022 | 09/06/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/06/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/7/2022 | 09/07/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/07/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/9/2022 | 09/09/2022 | |
Michael Rosenau ((253) 344-6753) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/09/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Failed | 9/12/2022 | 09/12/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/12/2022
Punch List "A"
1. GI needs to be cleaned and filled, inspector on site to verify.
2. ALL sewer c/o's need to be inspected, covers and caps removed prior.
3. ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify.
4. ALL storm structures need to be grouted.
5. ALL landscape areas need to be soil amended, inspector on site to verify.
6. Need ALL disturbed areas stabilized.
7. Need water service RPBA cert.
8. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/13/2022 | 09/13/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/13/2022
Punch List "A"
1. ALL sewer c/o's need to be inspected, covers and caps removed prior.
2. ALL storm structures need to be grouted.
3. ALL landscape areas need to be soil amended, inspector on site to verify.
4. Need ALL disturbed areas stabilized.
5. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-routs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/14/2022 | 09/14/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/14/2022
Punch List "A"
1. ALL sewer c/o's need to be inspected, covers and caps removed prior.
2. ALL storm structures need to be grouted.
3. ALL landscape areas need to be soil amended, inspector on site to verify.
4. Need ALL disturbed areas stabilized.
5. Need fire line RPBA cert.
9. Need fire line final, tamper switches tested and passed by fire inspector, WSP form filled out, and bushes removed 3' minimum clear around hydrant and 10' around FDC.
10. Seal ALL trench patches, sewer and fire.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-routs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/15/2022 | 09/15/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/15/2022
Punch List "A"
1. ALL sewer c/o covers need to be installed.
2. Sewer pump riser needs to be sealed.
3. Need ALL disturbed areas stabilized.
4. Need fire line RPBA cert.
5. Need fire line final, tamper switches tested and passed by fire inspector.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-routs are accessible.
|
||||
Engineering Punchlist Inspection | Partial Pass | 9/15/2022 | 09/15/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/15/2022
Punch List "A"
1. ALL sewer c/o's need covers installed.
2. Need ALL disturbed areas stabilized.
3. Need fire line RPBA cert.
4. Need fire line final, tamper switches tested and passed by fire inspector.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Punchlist Inspection | Partial Pass | 9/16/2022 | 09/16/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/16/2022
Punch List "A"
1. ALL sewer c/o's need covers installed.
2. Need ALL disturbed areas stabilized.
3. Need fire line final, tamper switches tested and passed by fire inspector.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-outs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/16/2022 | 09/16/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/16/2022
Punch List "A"
1. Need ALL disturbed areas stabilized.
2. Need fire line final, tamper switches tested and passed by fire inspector.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-routs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/19/2022 | 09/19/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/19/2022
Punch List "A"
1. Need ALL disturbed areas stabilized.
2. Need fire line final, tamper switches tested and passed by fire inspector.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-routs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/20/2022 | 09/20/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/20/2022
Punch List "A"
1. Need ALL disturbed areas stabilized.
2. Need fire line final, tamper switches tested and passed by fire inspector.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-routs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/22/2022 | 09/22/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/22/2022
Punch List "A"
1. Need ALL disturbed areas stabilized.
2. Need fire inspection card stamped and signed..
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-routs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/23/2022 | 09/23/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/23/2022
Punch List "A"
1. Need ALL disturbed areas stabilized.
2. Need fire line final, tamper switches tested and passed by fire inspector.
Punch List "B"
1. ALL existing septic drain field needs to be decommissioned.
2. Need storm, sewer, and water as-builts.
3. Need storm water maintenance agreement.
4. Finish all concrete when pedestrian re-routs are accessible.
|
||||
Engineering Daily Inspection | Partial Pass | 9/26/2022 | 09/26/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/26/2022
Punch List "A"
1. Need fire inspection card stamped by installer.
Punch List "B"
1. Need storm, sewer, and water as-builts.
2. Need storm water maintenance agreement.
|
||||
Engineering Punchlist Inspection | Partial Pass | 9/26/2022 | 09/26/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/26/2022
Punch List "A"
1. Need fire inspection card stamped by installer.
Punch List "B"
1. Need storm, sewer, and water as-builts.
2. Need storm water maintenance agreement.
|
||||
Planning Landscape Inspection | VOID | 9/27/2022 | 09/27/2022 | |
Chris Beale ((253) 841-5418) | ||||
Engineering Daily Inspection | Partial Pass | 9/27/2022 | 09/27/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/27/2022
Punch List "A"
1. Need fire inspection card stamped by installer.
Punch List "B"
1. Need storm, sewer, and water as-builts.
2. Need storm water maintenance agreement.
|
||||
Engineering Daily Inspection | Partial Pass | 9/27/2022 | 09/27/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/27/2022
Punch List "B"
1. Need storm, sewer, and water as-builts.
|
||||
Engineering Punchlist Inspection | Partial Pass | 9/27/2022 | 09/27/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/27/2022
Punch List "B"
1. Need storm, sewer, and water as-builts.
|
||||
Engineering Punchlist Inspection | Not Ready | 11/28/2022 | 11/28/2022 | |
Jason Little ((253) 244-0387) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
11/28/2022
Punch List "B"
1. Need storm, sewer, and water as-builts.
|
||||
Engineering Punchlist Inspection | Passed | 04/03/2023 | ||
Robyn Buck ((253) 435-3617) | ||||
Corrections:
Other/Miscellaneous
Outstanding
11/28/2022
Punch List "B"
1. Need storm, sewer, and water as-builts.
|
||||
Engineering Final Inspection | Passed | 04/03/2023 | ||
Robyn Buck ((253) 435-3617) | ||||
Engineering Daily Inspection | VOID | 04/03/2023 | ||
Robyn Buck ((253) 435-3617) | ||||
Corrections:
Other/Miscellaneous
Outstanding
09/27/2022
Punch List "B"
1. Need storm, sewer, and water as-builts.
|
Condition | Status | Category |
---|---|---|
Certificate of Insurance/CG2012 | Resolved | Prior to Issuance |
Engineering Division
Certificate or Insurance/CG2012 must be received prior to issuance
|
||
Civil Standard Conditions | Open | Standard Conditions |
Engineering Division
1. Construction permitted as per approved civil plans.
2. Construction permit shall expire by limitation and be declared void if:
* Work is not started within 180 days of obtaining the permit
* Work is abandoned for 180 days or more after beginning work
* After two years from the date of permit issuance, regardless of whether work is finished
3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review.
5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
|
||
Engineering Cost Breakdown Fee Calculation | Resolved | Prior to Issuance |
Engineering Division
Engineering Cost Breakdown Fee Calculation must be received for Reviewer to verify valuation for fee calculations
|
||
Pipeline Notfication Rcw 19.122.033 | Open | Standard Conditions |
Engineering Division
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
|
||
Right-of-Way Occupation Bond | Resolved | Prior to Issuance |
Engineering Division
Street Obstruction Bond must be received prior to issuance
|
||
Miscellaneous Condition | Resolved | Standard Conditions |
Engineering Division
Payment of Sewer System Development Charges associated with each building onsite will be due prior to final approval/acceptance of the new sewer system. A separate Utility Connection Permit application will be required either wholly for the project site, or individually for each building, and must include a completed Plumbing Fixture Worksheet for each building (sewer only).
|
||
Miscellaneous Condition | Open | Standard Conditions |
Engineering Division
The property lies within a Sewer Latecomer’s Agreement designated area associated with the Pioneer Crossing Lift Station project. The latecomer’s charge is $60,470.39 which is payable and due prior to final approval/acceptance of the new sewer system.
|
||
Miscellaneous Condition | Resolved | Standard Conditions |
Engineering Division
The Permittee shall provide one full-size paper copy of the approved plans to the City Inspector at the time of the Pre-Construction Meeting.
|
||
Miscellaneous Condition | Resolved | Prior to Completion |
Engineering Division
The property lies within a Sewer Latecomer’s Agreement designated area associated with the Pioneer Crossing Lift Station project. The latecomer’s charge is $60,470.39 which is payable and due prior to final approval/acceptance of the new sewer system.
THIS WAS PAID UNDER PERMIT PRSC20220184.
|
||
Punchlist: Miscellaneous Sewer A Item | Resolved | Sewer Punchlist Section A |
Engineering Division
GI needs to be cleaned and filled, inspector on site to verify. (fill GI with water)
|
||
Punchlist: Miscellaneous Sewer A Item | Resolved | Sewer Punchlist Section A |
Engineering Division
ALL sewer c/o's need covers installed. And pump chamber riser sealed with sealant.
|
||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
Engineering Division
ALL storm, including roof drains, need to be jetted and sumps vacced, inspector on site to verify. (Half the storm was cleaned)
|
||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
Engineering Division
ALL storm structures need to be grouted.
|
||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
Engineering Division
ALL landscape areas need to be soil amended, inspector on site to verify.
|
||
Punchlist: Miscellaneous Stormwater A Item | Resolved | Storm Punchlist Section A |
Engineering Division
Need ALL disturbed areas stabilized.
|
||
Punchlist: Miscellaneous Water A Item | Resolved | Water Punchlist Section A |
Engineering Division
Need water service RPBA cert.
|
||
Punchlist: Miscellaneous Water A Item | Resolved | Water Punchlist Section A |
Engineering Division
Need fire line RPBA cert.
|
||
Punchlist: Miscellaneous Water A Item | Resolved | Water Punchlist Section A |
Engineering Division
Waiting for fire card to be stamped by installer. All tamper switches were passed last Thursday 9/22/22.
|
||
Punchlist: Miscellaneous Streets A Item | Resolved | Street Punchlist Section A |
Engineering Division
Seal ALL trench patches, sewer and fire.
|
||
Punchlist: Miscellaneous B Item | Resolved | Misc. Punchlist Section B |
Engineering Division
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Engineering Division
Pay any overtime inspection fees owing. Please contact Engineering Support Specialist, Robyn, at rbuck@puyallupwa.gov.
|
||
Punchlist: Provide the City a signed letter for the GI/OWS that it was installed correctly | Resolved | Sewer Punchlist Section A |
Engineering Division
Provide the City with a letter from the design engineer certifying that the installation of the grease interceptor or oil / water separator was performed in accordance with all regulations and the approved plans.
|
||
Punchlist: Miscellaneous B Item | Resolved | Misc. Punchlist Section B |
Engineering Division
Finish all concrete when pedestrian re-outs are accessible.
|
||
Punchlist: Miscellaneous A Item | Resolved | Misc. Punchlist Section A |
Engineering Division
Contact the Planning Department project reviewer, Chris Beale at cbeale@puyallupwa.gov to request Planning inspection and approval. VOID per Chris B.
|
||
Punchlist: Miscellaneous Sewer B Item | Resolved | Sewer Punchlist Section B |
Engineering Division
ALL existing septic drain field needs to be decommissioned.
|
||
Punchlist: Provide the City with an electronic version of the record drawings | Resolved | Misc. Punchlist Section B |
Engineering Division
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
|
There are no related items for this engineering permit application.
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.