CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

PRCCP20250462


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCCP20250462
Civil Construction Permit
Closed
BPLC PROPERTIES LLC
Site development work including site distance and wall design for the site for parking area. This will resolve the violation against the property.
04/04/2025
08/20/2025
07/29/2026
01/30/2026

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
07/22/2025 CIVIL PLANS - RESUB (Stamped)
07/22/2025 LANDSCAPE PLAN (Stamped)
Review Type Outcome Est. Completion Date Completed
Engineering Civil Review Approved 07/17/2025 07/17/2025
Public Works Water Review Approved 07/17/2025 07/17/2025
Public Works Streets Review Approved 07/17/2025 07/16/2025
Engineering Traffic Review Approved 07/17/2025 07/15/2025
Public Works Collection Review Approved 07/17/2025 07/11/2025
Fire Review Approved 07/17/2025 07/10/2025
Planning Review Approved 07/17/2025 07/09/2025
Public Works Streets Review Approved 06/11/2025 06/10/2025
Engineering Civil Review Failed 06/11/2025 06/10/2025
Engineering Traffic Review Failed 06/11/2025 06/10/2025
Public Works Collection Review Approved 06/11/2025 06/09/2025
Fire Review Approved 06/11/2025 06/09/2025
Planning Review Approved 06/11/2025 06/05/2025
Public Works Water Review Failed 06/11/2025 06/05/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Engineering Inspection Fee (3%) $11,000.79 $11,000.79 Paid 07/25/2025
Engineering Permit Fee $300.00 $300.00 Paid 07/25/2025
Traffic Control Permit Fee $50.00 $50.00 Paid 04/08/2025
Traffic Control Plan Review Fee $40.00 $40.00 Paid 04/08/2025
Civil Review Fee $470.00 $470.00 Paid 04/08/2025
Record Drawing Review Fee $200.00 $200.00 Paid 04/08/2025
Storm System Development Charge - Commercial $62,197.50 $62,197.50 Paid 07/25/2025
Civil Review Additional Fee $720.00 $720.00 Paid 07/02/2025
Planning Landscape Review Fee $300.00 $300.00 Paid 07/25/2025
Miscellaneous Fee $347.50 $347.50 Paid 01/27/2026
$180.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Engineering Daily Inspection Partial Pass 8/29/2025 08/29/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/2/2025 09/02/2025
Jeff Hill ((253) 204-5633)
Engineering Daily Inspection Partial Pass 9/3/2025 09/03/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/4/2025 09/05/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/5/2025 09/08/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/8/2025 09/08/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/9/2025 09/09/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/10/2025 09/10/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/11/2025 09/11/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/12/2025 09/12/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/15/2025 09/16/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/16/2025 09/16/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/17/2025 09/17/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/18/2025 09/18/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/19/2025 09/22/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/22/2025 09/22/2025
Michael Rosenau ((253) 344-6753)
Erosion And Sediment Inspection Partial Pass 9/23/2025 09/23/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/23/2025 09/23/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/24/2025 09/24/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/25/2025 09/25/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/26/2025 09/26/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/29/2025 09/29/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 9/30/2025 09/30/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/1/2025 10/01/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/2/2025 10/02/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/3/2025 10/03/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/6/2025 10/06/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/7/2025 10/07/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/8/2025 10/08/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/9/2025 10/09/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/10/2025 10/10/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/13/2025 10/13/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/14/2025 10/14/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/15/2025 10/15/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/16/2025 10/16/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/17/2025 10/17/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/20/2025 10/20/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/23/2025 10/23/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/28/2025 10/28/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/29/2025 10/29/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/30/2025 10/30/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 10/31/2025 10/31/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/3/2025 11/03/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/4/2025 11/04/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/5/2025 11/05/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/6/2025 11/06/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/7/2025 11/07/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/10/2025 11/10/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/12/2025 11/12/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/13/2025 11/13/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/14/2025 11/14/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/17/2025 11/17/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/18/2025 11/18/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/24/2025 11/24/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/25/2025 11/25/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 11/26/2025 11/26/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/1/2025 12/01/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/3/2025 12/03/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/4/2025 12/04/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/5/2025 12/05/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/8/2025 12/08/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/9/2025 12/10/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/12/2025 12/12/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/19/2025 12/19/2025
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Partial Pass 12/24/2025 12/24/2025
Michael Rosenau ((253) 344-6753)
Erosion And Sediment Inspection Passed 01/16/2026
Michael Rosenau ((253) 344-6753)
Job Start Inspection Passed 01/16/2026
Michael Rosenau ((253) 344-6753)
Engineering Preconstruction Inspection (Pre-Con Meeting) Passed 01/16/2026
Michael Rosenau ((253) 344-6753)
Engineering Daily Inspection Passed 1/16/2026 01/16/2026
Michael Rosenau ((253) 344-6753)
Planning Landscape Inspection Passed 1/20/2026 1/27/2026 01/28/2026
Rachael N. Brown ((253) 770-3363)
Engineering Punchlist Inspection Passed 01/30/2026
Robin Loewen ((253) - )
Engineering Final Inspection Passed 01/30/2026
Robin Loewen ((253) - )

Conditions

Condition Status Category
Civil Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard civil construction conditions: 1.            Construction permitted as per approved civil plans. 2.            Construction permit shall expire by limitation and be declared void if: a.            Work is not started within 180 days of obtaining the permit. b.            Work is abandoned for 180 days or more after beginning work. c.             After two years from the date of permit issuance, regardless of whether work is finished. 3.            Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 4.            Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with an application fee to the Engineering Services Staff for review. 5.            The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation.  Call before you dig, it's the law. NOTE:  Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811.  Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation.  If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.  6.            It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority. 7.            Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval. 8.            All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits. 9.            I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder.   It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification.  This waiver has been mutually negotiated by the parties.  The provisions of this section shall survive the expiration or termination of this Agreement. to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pre-Construction Meeting Resolved Prior to Issuance
Engineering Division
Please contact the DPS Support Specialist, Robin Loewen at RLOEWEN@PUYALLUPWA.GOV to request a pre-construction meeting prior to starting site work.
Performance Bond Resolved Prior to Issuance
Engineering Division
A Performance Bond must be received by the City of Puyallup prior to permit issuance. The Performance Bond shall be 150% of the estimated cost of work in the ROW per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/16622/Performance-Bond-51122-appvd-by-Legal for more information.
Inadvertent Discovery Plan (IDP) Resolved Prior to Issuance
Engineering Division
Email a signed Inadvertent Discovery Plan to RLOEWEN@PUYALLUPWA.GOV.
Overtime Inspection and Watermain Shutdown Fee Resolved Prior to Issuance
Engineering Division
Overtime Inspection Fees / Main Shutdown Fees form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
Certificate of Insurance/CG2012 Resolved Prior to Issuance
Engineering Division
Certificate or Insurance/CG2012 must be received prior to issuance
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
A Stormwater Performance Bond must be received by the City of Puyallup prior to permit issuance. The Stormwater Performance Bond shall be 125% of the estimated cost of stormwater facility construction or improvement per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/18269/STORMWATER-Performance-Bond- for more information.
Miscellaneous Condition Resolved Standard Conditions
Development & Permitting Services
Review and adhere to Detention Pond Liner & Pavement Section Recommendations from Earth Solutions NW dated August 3, 2021.
Miscellaneous Condition Resolved Standard Conditions
Development & Permitting Services
If, through a combination of lowering the existing hydrant and constructing a curb around the hydrant, the required breakaway flange height depicted in detail 03.05.01 cannot be acheived then a new low bury hydrant shall be installed.
Miscellaneous Condition Resolved Prior to Completion
Development & Permitting Services
Lot combination required. Complete the Lot Combo appliation prior to permit completion.
Punchlist: Miscellaneous B Item Resolved Misc. Punchlist Section B
Engineering Division
Miscellaneous Condition Resolved Standard Conditions
Development & Permitting Services
A Traffic Control Plan stamped by a Traffic Control Supervisor shall be submitted to the design engineer through email. Submit at least 2 weeks prior to scheduled right of way work. No ROW work can commence without an approved TCP.
Miscellaneous Condition Resolved Standard Conditions
Development & Permitting Services
Attention to Permit #PRRWF20250845 for construction of the pond walls.
Ready to Issue - Need Contractor Info Resolved Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Punchlist: Miscellaneous Water A Item Resolved Water Punchlist Section A
Development & Permitting Services
Raise box for irrigation double check backflow to meet clearance requirements of City Standard 03.04.01 on sheet C10 of the approved plans.
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
Align C.O./Observation casting on CB # 1 over the top of the flow control tee and install 6" PVC sleeve per City Standard 02.01.07 on sheet C8 of the approved plans.
Punchlist: Miscellaneous Stormwater A Item Resolved Storm Punchlist Section A
Development & Permitting Services
Install catch basin markers per City Standard 02.01.02 on sheet C9 of the approved plans. City will provide markers and adhesive.
Punchlist: Miscellaneous A Item Resolved Misc. Punchlist Section A
Development & Permitting Services
Complete the installation of irrigation and landscaping per approved drawings.
Punchlist: Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection Resolved Misc. Punchlist Section A
Development & Permitting Services
Engineering staff to contact the Planning Department project reviewer to request landscape walkthrough inspection. Landscape requirements to be added to the punchlist.
Punchlist: Provide the City with an electronic version of the record drawings Resolved Misc. Punchlist Section B
Development & Permitting Services
Provide the City with an electronic version of the record drawings in PDF format and in AutoCAD Map 2007 or newer in State Plane South Projection format.
Punchlist: Maintenance Bond Resolved Misc. Punchlist Section B
Engineering Division
Maintenance Bond shall be a minimum of 10% of the estimated cost of work in the ROW, not less than $5,000
Punchlist: Provide DCVA Test Results Resolved Water Punchlist Section A
Engineering Division
Provide the City with the test results for the irrigation Double Check Valve Assembly (DCVA).
Punchlist: Provide the City a letter from the Design Engineer for the proper install of the stormwater BMP’s Resolved Storm Punchlist Section A
Engineering Division
Provide the City with a letter from the design engineer certifying the proper installation of permanent stormwater controls and compliance with the stormwater site plan.
Punchlist: Provide the City with a signed stormwater agreement Resolved Storm Punchlist Section B
Engineering Division
Provide the City with a recorded copy of the Stormwater Management & BMP Facilities Agreement. With the operation and maintenance manual described in item 3 as a recorded exhibit.
Miscellaneous Condition Resolved Prior to Completion
Development & Permitting Services
Pierce County Auditor's recording fee for SWA must be paid prior to closing the permit. [Robin Loewen @ 01/27/2026 11:10 AM]

Related Permit & Planning Applications

Reference Number Status Type
E-20-0067 Canceled Civil Construction Permit
PRRWF20250845 Closed Retaining Wall
PRCTI20251564 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCCP20260391 In Plan Check Civil Construction Permit
P-20-0015 File Closed SEPA Standalone
PLLC20250053 File Closed Lot Combination

Documents & Images

Date Uploaded File Type Name
04/04/2025 Report GEOTECH REPORT
04/04/2025 Report CONSTRUCTION SWPPP
04/04/2025 Form APPLICATION
04/08/2025 Receipt Receipt for transaction:2025-000681
06/10/2025 Letter Permit Review Correction Letter
06/19/2025 Other Engineering Estimate of Cost Break Down, 2025_06_17
06/19/2025 Report O & M MANUAL - RESUB
06/19/2025 Form CORRECTION RESPONSE LETTER
07/02/2025 Receipt Receipt for transaction:2025-001313
07/17/2025 Other Engineering Estimate of Cost Break Down 2025.07.16_approvedPRCCP20250462
07/17/2025 Report 2412 Inter Ave Storm Drainage Report, 2025_06_19 (Flattened)
07/22/2025 Plans CIVIL PLANS - RESUB (Stamped)
07/22/2025 Plans LANDSCAPE PLAN (Stamped)
07/25/2025 Receipt Receipt for transaction: 2025-001480
08/20/2025 Permit Permit - Detailed
01/06/2026 DCVA Cert_
01/27/2026 Receipt Receipt for transaction:2026-000124
01/28/2026 SWA - PRCCP20250462 - RECORDED & CCO STAMPED


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.