Summary

PRRWF20250845
Retaining Wall
Permit(s) Issued
BPLC PROPERTIES LLC
CONSTRUCTION OF RETAINING WALL - 9/4 REVISION (1) - CHANGING POND WALLS FROM ULTRA BLOCKS TO REINFORCED CONCRETE
06/24/2025
09/02/2025
03/31/2026

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 09/15/2025 09/04/2025
Engineering Civil Review Approved 07/15/2025 07/16/2025
Engineering Review Approved 07/15/2025 07/15/2025
Planning Review Approved 07/15/2025 07/09/2025
Building Review Approved 07/15/2025 06/26/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $1,245.75 $1,245.75 Paid 07/17/2025
Building Plan Review Fee $809.74 $809.74 Paid 06/25/2025
Resubmittal Fee $180.00 $180.00 Paid 09/04/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection Pending
Shannon King ((253) 840-6684)
Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Pending
Shannon King ((253) 840-6684)
Erosion And Sediment Inspection Passed 9/23/2025 09/23/2025
Michael Rosenau ((253) 344-6753)
Footing/Setback Inspection Failed 9/23/2025 9/23/2025 09/23/2025
James LaVergne ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/23/2025
1. Provide geo tech report at time of inspection. 2. Provide engineers approval on south side form jog. Footing does not match print.

Foundation/Rebar Inspection Partial Pass 9/24/2025 9/24/2025 09/24/2025
James LaVergne ((253) 841-5590)
Footing/Setback Inspection Partial Pass 9/25/2025 9/25/2025 09/25/2025
James LaVergne ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
09/25/2025
1. Provide geo tech report at time of inspection. 2. Provide engineers approval on south side form jog. Footing does not match print.

Foundation/Rebar Inspection Partial Pass 10/1/2025 10/1/2025 10/01/2025
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Passed w/ Conditions 10/2/2025 10/2/2025 10/02/2025
James LaVergne ((253) 841-5590)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
PRRWF20250845 shall not be issued until PRCCP20250462 is approved and issued.
Miscellaneous Condition Open Standard Conditions
Engineering Division
These plans shall be read and interpreted along with the approved civil plans (PRCCP20250462). See specifically Sheets C7 and C8 of the approved civil plans.
Ready to Issue - Need Contractor Info Resolved Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.

Related Permit & Planning Applications

Reference Number Status Type
E-20-0067 Canceled Civil Construction Permit
PRCCP20250462 Permit(s) Issued Civil Construction Permit
P-20-0015 File Closed SEPA Standalone
PLLC20250053 File Closed Lot Combination

Documents & Images

Date Uploaded File Type Name
06/24/2025 Form APPLICATION FORM
06/25/2025 Receipt Receipt for transaction:2025-001244
07/17/2025 Plans SITE PLAN (Stamped)
07/17/2025 Plans STRUCTURAL PLAN (Stamped)
07/17/2025 Report STRUCTURAL CALCS (Stamped)
07/17/2025 Receipt Receipt for transaction:2025-001414
09/02/2025 Permit Permit - Detailed
09/02/2025 Letter Permit Job Card
09/04/2025 Form Revisions to Existing Residential or Commercial Applications (PDF)
09/04/2025 Receipt Receipt for transaction:2025-001745
09/05/2025 Report STRUCTURAL CALCS FOR REVISION (1) (Stamped)
09/05/2025 Plans STRUCTURAL PLANS FOR REVISION (1) (Stamped)
10/01/2025 Report Inspection Report (Foundation/Rebar Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.