CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRRWF20250845
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Building Permit Fee | $1,245.75 | $1,245.75 | Paid | 07/17/2025 |
| Building Plan Review Fee | $809.74 | $809.74 | Paid | 06/25/2025 |
| Resubmittal Fee | $180.00 | $180.00 | Paid | 09/04/2025 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $2,235.49 | $2,235.49 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Building Final Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Footing/Setback Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Foundation/Rebar Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Erosion And Sediment Inspection | Passed | 9/23/2025 | 09/23/2025 | |
| Michael Rosenau ((253) 344-6753) | ||||
| Footing/Setback Inspection | Failed | 9/23/2025 | 9/23/2025 | 09/23/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/23/2025
1. Provide geo tech report at time of inspection.
2. Provide engineers approval on south side form jog. Footing does not match print.
|
||||
| Foundation/Rebar Inspection | Partial Pass | 9/24/2025 | 9/24/2025 | 09/24/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Footing/Setback Inspection | Partial Pass | 9/25/2025 | 9/25/2025 | 09/25/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
09/25/2025
1. Provide geo tech report at time of inspection.
2. Provide engineers approval on south side form jog. Footing does not match print.
|
||||
| Foundation/Rebar Inspection | Partial Pass | 10/1/2025 | 10/1/2025 | 10/01/2025 |
| Shannon King ((253) 840-6684) | ||||
| Foundation/Rebar Inspection | Passed w/ Conditions | 10/2/2025 | 10/2/2025 | 10/02/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Engineering Division
PRRWF20250845 shall not be issued until PRCCP20250462 is approved and issued.
|
||
| Miscellaneous Condition | Open | Standard Conditions |
|
Engineering Division
These plans shall be read and interpreted along with the approved civil plans (PRCCP20250462). See specifically Sheets C7 and C8 of the approved civil plans.
|
||
| Ready to Issue - Need Contractor Info | Resolved | Prior to Issuance |
|
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
| Reference Number | Status | Type |
|---|---|---|
| E-20-0067 | Canceled | Civil Construction Permit |
| PRCCP20250462 | Permit(s) Issued | Civil Construction Permit |
| P-20-0015 | File Closed | SEPA Standalone |
| PLLC20250053 | File Closed | Lot Combination |
| Date Uploaded | File Type | Name |
|---|---|---|
| 06/24/2025 | Form | APPLICATION FORM |
| 06/25/2025 | Receipt | Receipt for transaction:2025-001244 |
| 07/17/2025 | Plans | SITE PLAN (Stamped) |
| 07/17/2025 | Plans | STRUCTURAL PLAN (Stamped) |
| 07/17/2025 | Report | STRUCTURAL CALCS (Stamped) |
| 07/17/2025 | Receipt | Receipt for transaction:2025-001414 |
| 09/02/2025 | Permit | Permit - Detailed |
| 09/02/2025 | Letter | Permit Job Card |
| 09/04/2025 | Form | Revisions to Existing Residential or Commercial Applications (PDF) |
| 09/04/2025 | Receipt | Receipt for transaction:2025-001745 |
| 09/05/2025 | Report | STRUCTURAL CALCS FOR REVISION (1) (Stamped) |
| 09/05/2025 | Plans | STRUCTURAL PLANS FOR REVISION (1) (Stamped) |
| 10/01/2025 | Report | Inspection Report (Foundation/Rebar Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView