CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCNC20231287


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCNC20231287
Commercial - New Construction
Returned for Correction
PUYALLUP TT LLC
New
Construction of a new Taco Time with drive-through on existing site.
09/01/2023

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Fire Review Approved 04/08/2024 04/04/2024
Building Review Failed 04/08/2024 03/27/2024
Planning Review Failed 04/08/2024 03/27/2024
Engineering Review Approved 04/08/2024 03/26/2024
Engineering Traffic Review Approved 04/08/2024 03/21/2024
Building Review Failed 01/26/2024 01/24/2024
Planning Review Failed 01/26/2024 01/24/2024
Fire Review Approved 01/26/2024 01/23/2024
Engineering Review Failed 01/26/2024 01/18/2024
Engineering Traffic Review Approved 01/26/2024 01/09/2024
Planning Review Failed 12/01/2023 11/30/2023
Fire Review Failed 12/01/2023 11/17/2023
Engineering Traffic Review Approved 12/01/2023 11/15/2023
Building Review Failed 12/01/2023 11/07/2023
Engineering Review Approved 12/01/2023 10/09/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Backflow Preventor Fee $78.00 $78.00 Paid 09/05/2023
Building Plan Review Fee $3,491.31 $3,491.31 Paid 09/05/2023
Mechanical Plan Review Fee $190.55 $190.55 Paid 09/05/2023
Plumbing Plan Review Fee $322.56 $322.56 Paid 09/05/2023
Resubmittal Fee $180.00 $180.00 Paid 12/22/2023
Resubmittal Fee $180.00 $180.00 Paid 03/07/2024
Outstanding Fees Amount Paid Owing Date Paid
Resubmittal Fee $180.00 $0.00 $180.00 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$180.00    Add Fees to My Cart

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard commercial conditions: ** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** ** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See civil permit PRCCP20231136 for specifications ** ** Stormwater control of roof downspouts must be controlled. See civil permit PRCCP20231136 for specifications ** ** Trash enclosure will adhere to City Standard 208 Pollution Prevention ** ** The floor of the trash enclosure shall slope towards the point of sanitary sewer floor drain. The interior Type 1 Catch Basin drains to the onsite sewer system See civil permit PRCCP20231136 ** ** A grade break shall be provided around the trash enclosure to prevent runoff from entering the enclosure ** ** Stormwater control of the trash enclosure's roof downspouts must be controlled. See civil permit PRCCP20231136 ** **A separate building permit is required for the proposed retaining wall ** - Occupancy will not be granted until all civil work associated with PRCCP20231136 has been completed and approval has been provided. - All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Miscellaneous Condition Open Engineering Division Prior to Issuance
: Civil permit PRCCP20231136 must be issued prior to the building permit issued. Once issued I will review the two site plans for accuracy. L 09/28/2023
Miscellaneous Condition Open Engineering Division Prior to Occupancy
: All work associated with civil permit PRCCP20231136 must be completed and a final engineering inspection approved prior to occupancy. LL 09/28/2023
Miscellaneous Condition Open Planning Division SEPA Condition
: The Puyallup Tribe of Indians has requested that Archaeological Monitoring be present during ground disturbance as 1115 E Main is located within a high probability area for impacting cultural resources. The city is identifying this as a mitigation measure in the preparation of a SEPA MDNS. Such a condition would require the applicant to identify this requirement in the civil and building permit applications and to ensure that Archaeological Monitoring is present during ground disturbance.

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20231136 Returned for Correction Civil Construction Permit
PRCWSA20240524 In Plan Check Certificate of Water/Sewer Availability
PLDDG20220115 Canceled Downtown Design Review
PLPSP20220120 Waiting for Conditions Preliminary Site Plan

Documents & Images

Date Uploaded File Type Name
12/01/2023 Report Taco Time Main Puyallup - Building Permit - Revised Structural Calculations (Flattened)
12/01/2023 Form Taco Time Main Puyallup - Building Permit - Application (Flattened)
04/04/2024 Plans Taco Time Main Puyallup - Building Permit - Revised Plan Set (Flattened)
09/05/2023 Letter Incomplete Application Notice
09/05/2023 Receipt Receipt for transaction:2023-001711
09/25/2023 Other Taco Time Main Puyallup - Building Permit - Traffic Scoping Worksheet
09/25/2023 Report Taco Time Main Puyallup - Building Permit - Hazardous Material Inventory Statement
09/25/2023 Report Taco Time Main Puyallup - Building Permit - Trusses
09/25/2023 Plans Taco Time Main Puyallup - Building Permit - Trusses
09/25/2023 Plans Taco Time Main Puyallup - Building Permit - Trusses
01/24/2024 Plans SITE PLAN - RESUB (Flattened)
12/01/2023 Form Taco Time Main Puyallup - Building Permit - Lighting Compliance Summary (Flattened)
09/26/2023 Form Taco Time Main Puyallup - Building Permit - Electrical Drawings
12/01/2023 Form Taco Time Main Puyallup - Building Permit - Plumbing Fixture Worksheet0 (Flattened)
09/27/2023 Report Taco Time East Main Scoping 7-12-2023 (Flattened) (1)
12/01/2023 Letter Permit Review Correction Letter
01/24/2024 Form Taco Time Main Puyallup - Building Permit - First Correction Response Letter (Flattened)
01/24/2024 Other Taco Time Main Puyallup - Building Permit - Exhibit C Condensor Submittal (Flattened)
01/24/2024 Other Taco Time Main Puyallup - Building Permit - Exhibit D Kitchen Hood Plans (Flattened)
12/22/2023 Other Taco Time Main Puyallup - Building Permit - Structural Correction Letter
12/22/2023 Receipt Receipt for transaction:2023-002384
01/24/2024 Report SOILS REPORT - Exhibit A Soils Report (Flattened)
01/24/2024 Plans Taco Time Main Puyallup - Building Permit - Exhibit B Freezer Submittal0 (Flattened)
01/24/2024 Letter Permit Review Correction Letter
04/04/2024 Other Taco Time Main Puyallup - Building Permit - Exhibit A Freezer Submittal (Flattened)
04/04/2024 Report Taco Time Main Puyallup - Building Permit - Exhibit C Additional Structural Calculations (Flattened)
03/05/2024 Form Taco Time Main Puyallup - Building Permit - Second Correction Response Letter
04/04/2024 Other Taco Time Main Puyallup - Building Permit - Exhibit B Recorded Easment Release (Flattened)
03/07/2024 Receipt Receipt for transaction:2024-000443
04/04/2024 Letter Permit Review Correction Letter


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.