CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCNC20240061
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 04/02/2024 |
Planning Landscape Review Fee | $300.00 | $300.00 | Paid | 04/02/2024 |
Building Permit Fee | $29,286.30 | $29,286.30 | Paid | 04/02/2024 |
Planning Building Permit Fee | $120.00 | $120.00 | Paid | 04/02/2024 |
Building Plan Review Fee | $19,036.10 | $19,036.10 | Paid | 02/02/2024 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 04/02/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 03/04/2024 |
AC Unit Fee | $39.10 | $39.10 | Paid | 04/03/2024 |
Mechanical Duct Work Fee | $14.10 | $14.10 | Paid | 04/03/2024 |
Ventilation System (apart from Heating/AC) Fee | $28.20 | $28.20 | Paid | 04/03/2024 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 04/03/2024 |
Mechanical Plan Review Fee | $78.91 | $78.91 | Paid | 04/03/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $49,412.71 | $49,412.71 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Building Div Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Comment Engineering Div Inspection | Pending | |||
Footing/Setback Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Foundation/Rebar Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Underfloor Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Slab/Insulation Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Block Wall Rebar Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Shear Wall Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Firewall/Firestop Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Energy (Insulation) Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Frame Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Ceiling Grid/T-Bar Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Wallboard / Drywall Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Mechanical Rough In Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Carbon Monoxide Detectors Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Refrigeration Line Test Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Exhaust/Vent Fans Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Fire Or Smoke Damper Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Cover Inspection/Thrust Blocks Inspection | Pending | |||
Hydrostatic Test 200Lbs 2Hrs | Pending | |||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Engineering Final Inspection | Pending | |||
Floodproof Certification Inspection | Pending | |||
Elevation Verification Inspection | Pending | |||
Planning Final Inspection | Pending | |||
Fire Final Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Mechanical Final Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) | ||||
Building Final Inspection | Pending | |||
Kevin Spruell ((253) 841-5590) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Civil Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard civil construction conditions:
1. Construction permitted as per approved civil plans.
2. Construction permit shall expire by limitation and be declared void if:
a. Work is not started within 180 days of obtaining the permit.
b. Work is abandoned for 180 days or more after beginning work.
c. After two years from the date of permit issuance, regardless of whether work is finished.
3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with an application fee to the Engineering Services Staff for review.
5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
6. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority.
7. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits.
|
|||||
Miscellaneous Condition | Open | Engineering Division | |||
:
No sediment shall be tracked out of the site. There is no construction entrance proposed, yet trackout must still be controlled. It is the responsibility of the contractor to remove sediment and mud from tires prior to entering city streets. The lack of a specific BMP on the plans does not relieve the contractor from this responsibility. Wheel washes or other means of controlling sediment shall be implemented if the inspector finds that track out is happening.
|
|||||
Miscellaneous Condition | Resolved | Engineering Division | |||
:
A Storm Water Pollution Prevention Plan shall be submitted to and approved by the city prior to ground disturbance as is detailed on Sheet C6, TESC Note 1.
|
|||||
Engineering Commercial Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard commercial conditions:
** Prior to STARTING work the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start **
** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See Stormwater Site Plan dated February 2024. Refer to the Stormwater Fact Sheet and City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. Attached in CityView **
** Call Before You Dig. It's the law. Locate all utilities prior to starting work Dial 811 or call 1-800-424-5555 **
** The applicant is responsible to schedule all utility inspections prior to backfilling **
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
- The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
|
|||||
Ready to Issue - Need Contractor Info | Resolved | Development & Permitting Services | Prior to Issuance | ||
:
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
|||||
Ready to Issue - Need Business License Endorsement | Resolved | Development & Permitting Services | Prior to Issuance | ||
:
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
Reference Number | Status | Type |
---|---|---|
PRAMR20231444 | Closed | Alternative Methods / Materials Request |
PLPRE20230022 | File Closed | Pre-Application |
PLLC20230059 | File Closed | Lot Combination |
PLCUV20230074 | Waiting for Conditions | CUP With Variance |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView