CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCNC20250116
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Backflow Preventor Fee | $26.00 | $26.00 | Paid | 01/27/2025 |
Building Plan Review Fee | $1,053.62 | $1,053.62 | Paid | 01/27/2025 |
Mechanical Plan Review Fee | $135.17 | $135.17 | Paid | 01/27/2025 |
Plumbing Plan Review Fee | $203.45 | $203.45 | Paid | 01/27/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Fire Review Fee (Commercial Building) | $265.00 | $0.00 | Not payable | Not Paid |
Planning Landscape Review Fee | $90.00 | $0.00 | Not payable | Not Paid |
Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee | $38.80 | $0.00 | Not payable | Not Paid |
Mechanical Duct Work Fee | $19.55 | $0.00 | Not payable | Not Paid |
Suspended, Recessed Wall, or Floor unit Heater Fee | $39.10 | $0.00 | Not payable | Not Paid |
Ventilation System (apart from Heating/AC) Fee | $56.40 | $0.00 | Not payable | Not Paid |
Building Permit Fee | $1,620.95 | $0.00 | Not payable | Not Paid |
Planning Building Permit Fee | $30.00 | $0.00 | Not payable | Not Paid |
Mechanical Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
Plumbing Permit Fee | $40.00 | $0.00 | Not payable | Not Paid |
Plumbing Fixtures Fee | $195.00 | $0.00 | Not payable | Not Paid |
Water Heater Fee | $52.00 | $0.00 | Not payable | Not Paid |
WA State Building Code Council Fee (Commercial) | $25.00 | $0.00 | Not payable | Not Paid |
Sewer System Development Charge | $14,021.12 | $0.00 | Not payable | Not Paid |
Water System Development Charge | $6,294.67 | $0.00 | Not payable | Not Paid |
Sewer Permit Fee for Stub Onsite Inspection | $170.00 | $0.00 | Not payable | Not Paid |
Sewer CCTV (Lateral) Fee | $528.00 | $0.00 | Not payable | Not Paid |
Traffic Impact Fee (Commercial) | $13,500.00 | $0.00 | Not payable | Not Paid |
Resubmittal Fee | $180.00 | $0.00 | $180.00 | Not Paid |
Totals: | $38,623.83 | $1,418.24 | $180.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$180.00 Add Fees to My Cart
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS.
2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE.
3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE.
4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY"
5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard commercial conditions:
- Prior to starting site work request an inspection for erosion and sediment.
- Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20250119 for approved method of control.
- Stormwater control of roof downspouts required.
- Steps shall be taken to prevent drainage onto adjacent lots.
- The applicant is responsible to schedule all utility inspections prior to backfilling
- Curb, gutter, sidewalk, and approach must be poured per city standards.
- Driveway approach must be a minimum of 30' wide.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right-of-way or civil construction permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
||
Stormwater Maintenance Agreement (SWA) | Open | Prior to Occupancy |
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
|
||
Plat Conditions | Open | Standard Conditions |
Engineering Division
Applicable plat conditions from AFN 201405145001:
- Design and construction of new utilities and road improvements (infrastructure improvements) complying with the Puyallup Municipal Code will be necessary to serve each proposed lot. Infrastructure improvements must be permitted, approved, and constructed prior to issuance of the first building permit on either lot 1 or 2.
- A separate stormwater management & BMP facilities agreement approved by the City of Puyallup shall be executed and recorded prior to issuance of the first building permit on either lot 1 or lot 2. [Yianni Charitou @ 03/28/2025 8:33 AM]
|
||
Right-of-Way (ROW) Dedication | Open | Prior to Occupancy |
Engineering Division
Right-of-way dedication to match the abutting street classification shall be required as determined by Development Engineering. No building permit or development permit shall be granted for the construction or substantial improvement of any industrial, commercial, or residential building, or plat unless the plans and specifications contain provisions for the dedication to the City of sufficient street right of way for the classification of the street abutting the property according to the street plans and street development needs of the city for that street. In accordance with Puyallup Municipal Code Chapter 11.08.120, the subject site property owner shall dedicate approximately 2’ of right-of-way to match the 20’ street classification of the abutting alleyway. Please fill out the attached REETA template form and the Right of Way Dedication Deed form. The Deed form must include a legal description and be accompanied by an exhibit (survey completed by licensed surveyor) depicting the right-of-way dedication. Once drafted, please return these documents to me to review with the Engineering Support Specialist and City Engineer. If accepted, the City Engineer will sign the Deed so that it can be recorded with Pierce County. [Yianni Charitou @ 03/28/2025 8:32 AM]
|
||
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings | Open | Prior to Issuance |
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, new commercial projects that have a structure improvement value exceeding $200,000 in valuation are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and civil permit PRCCP20250119 has been issued. [Yianni Charitou @ 03/28/2025 8:32 AM]
|
||
Frontage Improvements - New Commercial/Industrial Buildings or Expansion of Existing Buildings | Open | Prior to Occupancy |
Engineering Division
Occupancy will not be granted until all civil work associated with PRCCP20250119 has been completed and final approval has been provided. [Yianni Charitou @ 03/28/2025 8:32 AM]
|
||
Backflow Protection Device - Commercial DCVA | Open | Prior to Occupancy |
Engineering Division
An approved double check valve assembly (DCVA) backflow device is required to be installed on the commercial water service per City Standard Detail 03.04.01. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
Fire Sprinkler Protection System Water Service and Backflow Protection Device | Open | Prior to Occupancy |
Engineering Division
A 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal.
Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
Side Sewer Sample Tee | Open | Prior to Occupancy |
Engineering Division
A side sewer sampling connection is required to be installed on the commercial sanitary side sewer service in accordance with City policy ENG 21-03 and City Standard Detail 04.03.04. [Yianni Charitou @ 03/28/2025 8:44 AM]
|
Reference Number | Status | Type |
---|---|---|
PRCCP20250119 | Returned for Correction | Civil Construction Permit |
P-21-0078 | File Closed | Pre-Application |
PLCUP20220162 | Waiting for Conditions | Conditional Use Permit |
Date Uploaded | File Type | Name |
---|---|---|
01/24/2025 | Other | TRAFFIC SCOPING WORKSHEET |
01/27/2025 | Receipt | Receipt for transaction:2025-000169 |
01/27/2025 | Letter | Incomplete Application Notice |
03/28/2025 | AFN 201405145001 | |
03/28/2025 | CoP Right of Way Dedication Deed & REETA | |
04/04/2025 | Letter | Permit Review Correction Letter |
04/04/2025 | Drawing | ArchitecturalElevations (Flattened) |
04/04/2025 | Plans | LandscapePlan (Flattened) |
04/04/2025 | Report | StructuralCalculations (Flattened) |
04/04/2025 | Form | EnergyComplianceWorksheetLighting (Flattened) |
04/04/2025 | Form | ApplicationForm (Flattened) |
04/04/2025 | Other | Narrative (Flattened) |
04/04/2025 | Plans | ConstructionPlanSetRevised (Flattened) |
04/04/2025 | Plans | SitePlanRevised (Flattened) |
04/04/2025 | Form | PLUMBING FIXTURE WORKSHEET (Flattened) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.