CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCTI20230098


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20230098
Commercial - Tenant Improvement/Remodel
Finaled
BCC PUYALLUP LLC
Alteration/Remodel
Tenant improvement and finish out of the North side of level 1. Improvements include offices, meeting rooms, cardio area, and break rooms. The interior alterations do not increase the building's area, nor do they alter the building egress and/or circulation outside the renovated space. REVISION (1) - 03/17/2023 - OPEN CEILING IN SOME AREAS, CEILING DETAILS, DOOR & WINDOW SCHEDULE UPDATES
01/30/2023
03/10/2023
08/26/2024

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Building Review Approved 03/31/2023 03/21/2023
Building Review Approved 03/10/2023 03/10/2023
Engineering Traffic Review Approved 03/10/2023 03/09/2023
Building Review Failed 03/10/2023 03/09/2023
Fire Review Approved 03/10/2023 03/08/2023
Engineering Review Approved 03/10/2023 02/22/2023
Planning Review Approved 03/10/2023 02/08/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 03/10/2023
Exhaust Vent Fan (Bath) Fee $28.20 $28.20 Paid 03/10/2023
Building Permit Fee $7,433.75 $7,433.75 Paid 03/10/2023
Mechanical Permit Fee $40.00 $40.00 Paid 03/10/2023
Backflow Preventor Fee $52.00 $52.00 Paid 01/30/2023
Plumbing Permit Fee $40.00 $40.00 Paid 03/10/2023
Drinking Fountain, Water Cooler, Ice Machine Fee $40.25 $40.25 Paid 03/10/2023
Water Heater Fee $13.00 $13.00 Paid 03/10/2023
Building Plan Review Fee $4,831.94 $4,831.94 Paid 01/30/2023
Mechanical Plan Review Fee $44.33 $44.33 Paid 01/30/2023
Plumbing Plan Review Fee $94.41 $94.41 Paid 01/30/2023
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 03/10/2023
Resubmittal Fee $130.00 $130.00 Paid 03/23/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Hydronic Piping Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Pending
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
03/22/2023
1 ; provide as built below slab plumbing plans prior to final. 2 ; provide run test as discussed with contractor.

Foundation/Rebar Inspection Pending
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Shear Wall Inspection Pending
Shannon King ((253) 840-6684)
Roof Sheathing Inspection Pending
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Pending
Shannon King ((253) 840-6684)
Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection Pending
Refrigeration Line Test Inspection Pending
Shannon King ((253) 840-6684)
Exhaust Hood Inspection Pending
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Pending
Shannon King ((253) 840-6684)
Medical Gas Inspection Pending
Shannon King ((253) 840-6684)
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Combination Frame And Rough In Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Pending
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
06/21/2023
1:complete siezmic bracing of main trunks.

Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
06/21/2023
north side grid ok .

Fire Final Inspection Pending
David Drake ((253) 864-4171)
Plumbing Below Slab Inspection Partial Pass 3/22/2023 3/22/2023 03/22/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
03/22/2023
1 ; provide as built below slab plumbing plans prior to final. 2 ; provide run test as discussed with contractor.

Plumbing Below Slab Inspection Passed w/ Conditions 3/23/2023 3/23/2023 03/23/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
03/23/2023
1 ; approved pending as built plumbing plans prior to final.

Foundation/Rebar Inspection Partial Pass 3/29/2023 3/29/2023 03/29/2023
Shannon King ((253) 840-6684)
Frame Inspection Not Ready 3/30/2023 3/30/2023 03/30/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 3/30/2023 3/30/2023 03/30/2023
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 4/13/2023 4/13/2023 04/13/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 4/13/2023 4/13/2023 04/13/2023
Shannon King ((253) 840-6684)
Cover Inspection/Thrust Blocks Inspection VOID 4/13/2023 4/13/2023 04/13/2023
Jason Little ((253) 435-3636)
Plumbing Rough In Inspection Not Ready 4/28/2023 4/28/2023 04/28/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/28/2023
1. Canceled on site by contractor

Mechanical Rough In Inspection Not Ready 4/28/2023 4/28/2023 04/28/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
04/28/2023
.canceled by contractor on site

Combination Frame And Rough In Inspection Partial Pass 5/1/2023 5/1/2023 05/01/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 5/1/2023 5/1/2023 05/01/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 5/4/2023 5/4/2023 05/04/2023
Shannon King ((253) 840-6684)
Comment Building Div Inspection Partial Pass 5/8/2023 5/8/2023 05/08/2023
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Partial Pass 5/8/2023 5/8/2023 05/08/2023
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 5/9/2023 5/9/2023 05/09/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 5/9/2023 5/9/2023 05/09/2023
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection Not Ready 5/9/2023 5/10/2023 05/10/2023
David Drake ((253) 864-4171)
Energy (Insulation) Inspection Partial Pass 5/12/2023 5/12/2023 05/12/2023
Shannon King ((253) 840-6684)
Frame Inspection Failed 5/12/2023 5/12/2023 05/12/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/12/2023
1 ;complete framing of fire/smoke dampers as per install instructions.

Wallboard / Drywall Inspection Not Ready 5/16/2023 5/16/2023 05/16/2023
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection Partial Pass 5/16/2023 5/16/2023 05/16/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Partial Pass 5/16/2023 5/16/2023 05/16/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
05/16/2023
.canceled by contractor on site

Wallboard / Drywall Inspection Partial Pass 5/17/2023 5/17/2023 05/17/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 5/22/2023 5/22/2023 05/22/2023
Shannon King ((253) 840-6684)
Fire Access Inspection VOID 5/24/2023 05/24/2023
David Drake ((253) 864-4171)
Frame Inspection Not Ready 5/24/2023 5/24/2023 05/24/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
05/24/2023
1 ;complete framing of fire/smoke dampers as per install instructions.

Ceiling Grid/T-Bar Inspection Not Ready 5/30/2023 5/30/2023 05/30/2023
Kevin Spruell ((253) 841-5590)
Mechanical Rough In Inspection Partial Pass 5/30/2023 5/30/2023 05/30/2023
Kevin Spruell ((253) 841-5590)
Combination Frame And Rough In Inspection Partial Pass 5/31/2023 5/31/2023 05/31/2023
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Failed 5/31/2023 5/31/2023 05/31/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
05/31/2023
1 ; complete firestop at penetration of shaftwall as discussed with contractor.

Frame Inspection Partial Pass 6/1/2023 6/1/2023 06/01/2023
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Failed 6/1/2023 6/1/2023 06/01/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/01/2023
1 ; complete firestop at penetration of shaftwall as discussed with contractor.

Other/Miscellaneous
Carried Forward
06/01/2023
1 ; complete firestop at penetration of shaft wall as discussed with contractor.

Frame Inspection Partial Pass 6/2/2023 6/2/2023 06/02/2023
Kevin Spruell ((253) 841-5590)
Firewall/Firestop Inspection Partial Pass 6/2/2023 6/2/2023 06/02/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Resolved
06/02/2023
1 ; complete firestop at penetration of shaftwall as discussed with contractor.

Other/Miscellaneous
Resolved
06/02/2023
1 ; complete firestop at penetration of shaft wall as discussed with contractor.

Wallboard / Drywall Inspection Partial Pass 6/5/2023 6/5/2023 06/05/2023
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Partial Pass 6/6/2023 6/6/2023 06/06/2023
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Partial Pass 6/6/2023 6/6/2023 06/06/2023
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Partial Pass 6/12/2023 6/12/2023 06/12/2023
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Partial Pass 6/12/2023 6/12/2023 06/12/2023
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Failed 6/12/2023 6/12/2023 06/12/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/12/2023
1 ; complete positive attachment of diffusers to main and cross-tee of ceiling grid.

Ceiling Grid/T-Bar Inspection Failed 6/12/2023 6/12/2023 06/12/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/12/2023
1 ; complete perimeter tie wires as discussed with ceiling contractor. 2 ; provide min 3 complete turns at all tie wires of lights. 3 ; complete positive attachment of diffusers to main and cross-tee of ceiling grid. 4 ; complete wall angles at smoke/fire dampers. ( complete fire damper labels as discussed with contractor prior to ceiling cover inspection approval.) 6 ; complete marking of firewalls as discussed with contractor. 7 ; inspection at north side of building only.

Firewall/Firestop Inspection Not Ready 6/13/2023 6/13/2023 06/13/2023
Kevin Spruell ((253) 841-5590)
Mechanical Rough In Inspection Failed 6/13/2023 6/13/2023 06/13/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
06/13/2023
1. complete diffuser attachment as discussed with contractor

Ceiling Grid/T-Bar Inspection Not Ready 6/13/2023 6/13/2023 06/13/2023
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
06/13/2023
1 ; complete perimeter tie wires as discussed with ceiling contractor. 2 ; provide min 3 complete turns at all tie wires of lights. 3 ; complete positive attachment of diffusers to main and cross-tee of ceiling grid. 4 ; complete wall angles at smoke/fire dampers. ( complete fire damper labels as discussed with contractor prior to ceiling cover inspection approval.) 6 ; complete marking of firewalls as discussed with contractor. 7 ; inspection at north side of building only.

Other/Miscellaneous
Carried Forward
06/13/2023
1.complete items from previous list

Mechanical Rough In Inspection Partial Pass 6/14/2023 6/14/2023 06/14/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
06/14/2023
1. complete diffuser attachment as discussed with contractor

Ceiling Grid/T-Bar Inspection Partial Pass 6/14/2023 6/14/2023 06/14/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Resolved
06/14/2023
1 ; complete perimeter tie wires as discussed with ceiling contractor. 2 ; provide min 3 complete turns at all tie wires of lights. 3 ; complete positive attachment of diffusers to main and cross-tee of ceiling grid. 4 ; complete wall angles at smoke/fire dampers. ( complete fire damper labels as discussed with contractor prior to ceiling cover inspection approval.) 6 ; complete marking of firewalls as discussed with contractor. 7 ; inspection at north side of building only.

Other/Miscellaneous
Resolved
06/14/2023
1.complete items from previous list

Exit Lighting Test Inspection Failed 6/16/2023 6/16/2023 06/16/2023
David Drake ((253) 864-4171)
Exit Light Test
Carried Forward
06/16/2023
Add Exit sign NW corner of hallway by stairwell, make visible for North offices. Add emergency lighting Westside of building in hallway that travels North to South at mid point.

Firewall/Firestop Inspection Passed w/ Conditions 6/16/2023 6/16/2023 06/16/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
06/16/2023
all walls above grid on north side minus 1 exterior wall that was getting sealed at time of inspection

Planning Final Inspection VOID 6/15/2023 06/20/2023
Nabila Comstock ((253) 770-3361)
Mechanical Rough In Inspection Not Ready 6/16/2023 6/16/2023 06/21/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
06/21/2023
1:complete siezmic bracing of main trunks.

Ceiling Grid/T-Bar Inspection Partial Pass 6/16/2023 6/16/2023 06/21/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
06/21/2023
north side grid ok .

Fire Final Inspection Partial Pass 6/22/2023 06/22/2023
Ray Cockerham ((253) 841-5585)
Fire Final
Carried Forward
06/22/2023
Fire Final Required TCO for final - resolve fire alarm permit. corrections. 10 days

Fire Final Inspection Failed 6/20/2023 6/21/2023 06/22/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Resolved
06/21/2023
Fire Alarm test incomplete

Building Final Inspection Partial Pass 6/22/2023 6/22/2023 06/22/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
06/22/2023
1 ; complete fire caulking of penetrations at rated walls of electrical room and corridor. 2 ; complete occupancy load signage as per City approved plans. 3 ; complete lower strap at hot water heater as discussed with contractor. 4 ; provide accessible signage at restroom 102. 5 ; complete fire caulking of penetrations at rated walls of elevator equipment room. 6 ; complete smoke seal at rated door at elevator equipment rooms. 7 ;complete fire caulking above ceiling at conference room rated walls. 8 ; complete threshold at exterior exit door at n.e. corner of building . 9 ; complete fire caulking of penetrations at rated walls at fire sprinkler room. 10 ; provide accessible toilets 17-19 above finish floor as per City approved plans. 11 ; provide 1/2'' max threshold at accessible shower. 12 ; provide clarification of rear accessible grab bar requirements at shower. 13 ; provide min. 10' separation from air intake of R.T.U.to plumbing vent. 14 ; complete 3 clouds as discussed with contractor. 15 ; provide fire final prior to building final inspection. 16 ; T.C.O. approved for 10 working days from 6/22/2023

Mechanical Final Inspection Failed 6/22/2023 6/22/2023 06/22/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/22/2023
1; provide min. 10' separation from air intake of R.T.U.to plumbing vent.

Plumbing Final Inspection Failed 6/22/2023 6/22/2023 06/22/2023
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/22/2023
1 ; complete lower strap at hot water heater as discussed with contractor. 2 ; provide accessible toilets 17-19 above finish floor as per City approved plans. 3 ; provide 1/2'' max threshold at accessible shower. 4 ; provide clarification of rear accessible grab bar requirements at shower. 5 ; provide min. 10' separation from air intake of R.T.U.to plumbing vent.

Building Final Inspection Failed 7/12/2023 7/12/2023 07/14/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Carried Forward
07/14/2023
From previous inspection: 10 ; provide accessible toilets 17-19 above finish floor as per City approved plans. 14 ; complete 3 clouds as discussed with contractor. 16 ; T.C.O. approved for 180 working days from 7/14/2023 Generator installation is not completed. Complete with fire inspection and provide commissioning report for review. New Complete accordion door installation (on backorder)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code • Elevators – L&I Final required prior to inspection; Fire Alarm contractor required for inspection. • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard commercial conditions: - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Miscellaneous Condition Resolved Engineering Division Prior to Occupancy
: A sewer sampling tee must be installed if one currently does not exit. The applicant was notifed by email on 02/21/2023. LL After a site visit it was determined that a sampling tee would not be required. See attached email. 03/09/2023 LL

Related Permit & Planning Applications

Reference Number Status Type
PRFA20230119 Closed Fire Alarms
PRFS20230429 Closed Fire Sprinklers

Documents & Images

Date Uploaded File Type Name
03/10/2023 Form Central Pierce FR - Plumbing Fixture Worksheet (Stamped)
03/10/2023 Report Central Pierce Fire & Rescue TI QCE Calcs (Stamped)
01/30/2023 Form Building Permit Application_Filled Out
03/10/2023 Other Plumbing Permit Application (Flattened)
03/10/2023 Other Mechanical Permit Application (Flattened)
03/10/2023 Other SHBTC - Central Pierce F&R HVAC Loads (Stamped)
01/30/2023 Receipt Receipt for transaction:2023-000137
03/10/2023 Report Traffic Scoping Worksheet_central pierce fire (Flattened)
03/10/2023 Plans CPFR Permit Set 2023-01-30 - ORIGINAL (Stamped)
03/10/2023 Plans ASHRAE 62.1 Ventilation Report Pierce County F&R (Stamped)
03/10/2023 Plans PRCTI20230098 - CPFR - Structural Revised 2023-03-08 (Flattened) (Stamped)
03/10/2023 Plans PRCTI20230098 -Restroom revision (Flattened) (Stamped)
03/10/2023 Letter Permit - Detailed
03/10/2023 Receipt Receipt for transaction:2023-000391
03/17/2023 Form Revisions to Existing Residential or Commercial Applications-ERE
03/17/2023 Form PRTCI20230096_Permit Revision Report
03/23/2023 Plans Benaroya_CPFR_Updated Permit Set_230321 (Stamped)
03/22/2023 Report Inspection Report (Plumbing Below Slab Inspection)
03/23/2023 Receipt Receipt for transaction:2023-000473
03/23/2023 Report Inspection Report (Plumbing Below Slab Inspection)
03/29/2023 Report Inspection Report (Foundation/Rebar Inspection)
03/30/2023 Report Inspection Report (Frame Inspection)
03/30/2023 Report Inspection Report (Energy (Insulation) Inspection)
04/13/2023 Report Inspection Report (Frame Inspection)
04/13/2023 Report Inspection Report (Energy (Insulation) Inspection)
04/28/2023 Report Inspection Report (Plumbing Rough In Inspection)
04/28/2023 Report Inspection Report (Mechanical Rough In Inspection)
05/01/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
05/01/2023 Report Inspection Report (Wallboard / Drywall Inspection)
05/01/2023 Report Inspection Report (Plumbing Rough In Inspection)
05/04/2023 Report Inspection Report (Wallboard / Drywall Inspection)
05/08/2023 Report Inspection Report (Comment Building Div Inspection)
05/08/2023 Report Inspection Report (Energy (Insulation) Inspection)
05/09/2023 Report Inspection Report (Frame Inspection)
05/12/2023 Report Inspection Report (Energy (Insulation) Inspection)
05/12/2023 Report Inspection Report (Frame Inspection)
05/16/2023 Report Inspection Report (Wallboard / Drywall Inspection)
05/16/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
05/16/2023 Report Inspection Report (Mechanical Rough In Inspection)
05/17/2023 Report Inspection Report (Wallboard / Drywall Inspection)
05/22/2023 Report Inspection Report (Wallboard / Drywall Inspection)
05/30/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
05/30/2023 Report Inspection Report (Mechanical Rough In Inspection)
05/31/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
05/31/2023 Report Inspection Report (Wallboard / Drywall Inspection)
05/31/2023 Report Inspection Report (Firewall/Firestop Inspection)
05/31/2023 Report Inspection Report (Frame Inspection)
06/01/2023 Report Inspection Report (Firewall/Firestop Inspection)
06/01/2023 Report Inspection Report (Frame Inspection)
06/02/2023 Report Inspection Report (Frame Inspection)
06/02/2023 Report Inspection Report (Firewall/Firestop Inspection)
06/06/2023 Report Inspection Report (Comment Building Div Inspection)
06/06/2023 Report Inspection Report (Wallboard / Drywall Inspection)
06/06/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
06/06/2023 Report Inspection Report (Firewall/Firestop Inspection)
06/12/2023 Report Inspection Report (Firewall/Firestop Inspection)
06/12/2023 Report Inspection Report (Wallboard / Drywall Inspection)
06/12/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
06/12/2023 Report Inspection Report (Mechanical Rough In Inspection)
06/13/2023 Report Inspection Report (Firewall/Firestop Inspection)
06/13/2023 Report Inspection Report (Mechanical Rough In Inspection)
06/13/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
06/14/2023 Report Inspection Report (Mechanical Rough In Inspection)
06/14/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
06/15/2023 Report Inspection Report (Engineering Final Inspection)
06/22/2023 Report Inspection Report (Exhaust/Vent Fans Inspection)
06/22/2023 Report Inspection Report (Building Final Inspection)
06/22/2023 Report Inspection Report (Mechanical Final Inspection)
06/22/2023 Report Inspection Report (Plumbing Final Inspection)
12/05/2023 Letter Permit Expiration Notice


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.