CITY OF PUYALLUP PERMITTING PORTAL

Development Permit Application Status

PRFA20230119


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRFA20230119
Fire Alarms
Closed
BCC PUYALLUP LLC
Addition
Tenant improvement on an existing fire alarm system. NFPA 72 2019 Edition, ADT Commercial adding 117 devices to existing FA system.- CENTRAL PIERCE FIRE AND RESCUE BLDG
02/06/2023
03/09/2023
01/07/2024
07/11/2023

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Fire Review Approved 03/08/2023 03/08/2023

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Alarm Systems (Alteration) Fee $517.50 $517.50 Paid 02/06/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Fire Alarm Cover Inspection VOID 06/15/2023
David Drake ((253) 864-4171)
Piv And Tamper Inspection VOID 06/15/2023
David Drake ((253) 864-4171)
Fire Alarm Test Inspection Failed 6/21/2023 6/21/2023 06/21/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Carried Forward
06/21/2023
Email sent June 21, 2023 1) Relocate smoke detectors above ceiling per code. Excerpt of NFPA 72 Standard is below. 2) Test of the fire alarm will be required to continue. 3) Okay to add furniture in single offices and other spaces with ceilings; subject to the fire alarm access. 4) Fire/Smoke damper testing is completed. 5) Tag and add Fire Extinguishers. 6) Test Exit lights added per David’s correction; Location is okay. 7) We will complete the final fire walkthrough tomorrow. 8) Building inspection – may be scheduled – at this time subject to Fire Prevention approval is outstanding. 9) Map at the annunciator –This item may be included on a TCO pending David Drakes review. MUST provide a FULL sized as-built set for the DOCUMENT BOX at the FACP. Permit set device plan is acceptable for tomorrows inspection at FACP.

Fire Alarm Final Inspection Partial Pass 6/22/2023 6/22/2023 06/22/2023
Ray Cockerham ((253) 841-5585)
Fire Alarm
Outstanding
06/22/2023
Fire alarm - 10 days to complete 1) Provide as built for the entire system a) provide beam depth calculations with floor clearance per NFPA 72 b) provide section view with beams c)provide device location and separation per NFPA 72 d) retest required 2) Update map at annunciator - not legible. Map at the annunciator –This item may be included on a TCO pending David Drakes review.

Conditions

Condition Status Department Category Expiration Date Due Date
New Fire Alarm System Conditions Open Standard Conditions
: • Appointment required for all inspections am/pm is not guaranteed without appointment. Larger systems taking more than 1 hour will require 48-72hr notice prior to scheduling. • Provide plans and permit on site for inspection. • Complete labor and industries inspections prior to requesting city inspection. • If there is an existing annunciator on the exterior of the building it will need to be moved inside the main entrance. Please contact fire inspector for further information. • Exterior fire bell required outside fire sprinkler room. • Above ceiling detection is required. • Device maps required at the annunciator and fire alarm panel prior to calling in final. The annunciator map will need to be weatherproof. • Total coverage is required, subject to field inspection. Comply with NFPA 72. • Fire alarm system shall be placarded per NFPA 72. The UL certificate shall be posted at time of final inspection. The system will need to be UL certified. • Pre-test shall be conducted with a printout for inspector at time of inspection. • Labeling of all devices above and below ceiling required. • Fire sprinkler tamper valves and PIV will be required to be tested at inspection. Fire sprinkler contractor to be onsite. • RTU’S and smoke dampeners will be required to be tested during inspection. • The city of Puyallup allows one FACP per building. The panel will need to be large enough to handle multiple tenants if applicable. • In existing buildings all above ceiling detection is to remain. Do not remove. • Due to unforeseeable construction design, all device locations to be field verified for compliance. Schedule your inspection online through the city of puyallup online permit system after requesting appointment from inspector. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov

Related Permit & Planning Applications

Reference Number Status Type
PRCTI20230098 Finaled Commercial - Tenant Improvement/Remodel