Permit Application Status

PRCTI20251445


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20251445
Commercial - Tenant Improvement/Remodel
Returned for Correction
EAST TOWN CROSSING LLC
Alteration/Remodel
HotWorx tenant improvements for Suite 2 at East Town Crossing commercial Lot 1 - HOTWORX -- 727 SHAW RD, EAST TOWN CROSSING COMMERCIAL BLDG.
11/04/2025

Locations

Property
0420264021

Property
0420264071

Address
727 SHAW RD, Unit: B, PUYALLUP, WA 98372

0420264021

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 12/24/2025 12/19/2025
Engineering Review Failed 12/24/2025 12/18/2025
Engineering Traffic Review Approved 12/24/2025 12/16/2025
Building Review Failed 12/24/2025 12/15/2025
Fire Review Approved 12/24/2025 12/08/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $427.54 $427.54 Paid 11/04/2025
Outstanding Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $0.00 Not payable Not Paid
Building Permit Fee $657.75 $0.00 Not payable Not Paid
WA State Building Code Council Fee (Commercial) $25.00 $0.00 Not payable Not Paid
Boilers & Compressors/Heat Pump (100,001 - 500,000 BTU or 3 - 15 HP) Fee $71.90 $0.00 Not payable Not Paid
Mechanical Duct Work Fee $14.10 $0.00 Not payable Not Paid
Ventilation System (apart from Heating/AC) Fee $155.10 $0.00 Not payable Not Paid
Mechanical Permit Fee $40.00 $0.00 Not payable Not Paid
Plumbing Fixtures Fee $130.00 $0.00 Not payable Not Paid
Plumbing Permit Fee $40.00 $0.00 Not payable Not Paid
Backflow Preventor Fee $26.00 $0.00 Not payable Not Paid
Water Heater Fee $13.00 $0.00 Not payable Not Paid
Grease Trap or Interceptor Fee $13.00 $0.00 Not payable Not Paid
Mechanical Plan Review Fee $182.72 $0.00 $182.72 Not Paid
Plumbing Plan Review Fee $144.30 $0.00 $144.30 Not Paid
Resubmittal Fee $180.00 $0.00 $180.00 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$507.02    Add Fees to My Cart

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
• Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of Puyallup • L&I Final required prior to Fire Final • Exit lighting test required contractor to provide light meter • Separate permits required for fire alarm and fire sprinkler • RTU’S will be required to be tested for shut down. • Fire extinguishers required per code • A Knox box is required at the front entry on the exterior of the building • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Ready to Issue - Need Business License Endorsement Open Prior to Issuance
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Ready to Issue - Need Contractor Info Open Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Miscellaneous Condition Open Prior to Completion
Engineering Division
Occupancy for building permit PRCTI20251445 shall not be granted until building permit PRCNC20250094 is closed first.
Right-of-Way (ROW) Dedication Resolved Prior to Completion
Engineering Division
Right-of-way dedication to match the abutting street classification shall be required as determined by Development Engineering. No building permit or development permit shall be granted for the construction or substantial improvement of any industrial, commercial, or residential building, or plat unless the plans and specifications contain provisions for the dedication to the City of sufficient street right of way for the classification of the street abutting the property according to the street plans and street development needs of the city for that street. Building permit PRCNC20241917 cannot be issued until boundary line adjustment PLBDJ20240103 is approved and recorded which depicts the required right-of-way dedication. The building permit site plan must match the approved boundary line adjustment. [Yianni Charitou @ 12/18/2025 3:00 PM] Boundary line adjustment PLBDJ20240103 was approved on 4/14/2025 and recorded on 5/29/2025 under AFN 202505295001. [Yianni Charitou @ 12/18/2025 3:00 PM]
Frontage Improvements - Non-Residential Tenant Improvements Resolved Prior to Issuance
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, non-residential tenant improvement projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) and when the remodel valuation exceeds $500,000 are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and civil construction permit application PRCCP20240569 has been issued. [Yianni Charitou @ 12/18/2025 3:00 PM] PRCCP20240569 issued 4/22/2025. [Yianni Charitou @ 12/18/2025 3:00 PM]
Frontage Improvements - Non-Residential Tenant Improvements Open Prior to Completion
Engineering Division
Your project is required to install frontage improvements in accordance with Puyallup Municipal Code 11.08.135. Building permit occupancy shall not be granted until the frontage improvements are completed and accepted, and civil construction permit PRCCP20240569 is finaled/closed. [Yianni Charitou @ 12/18/2025 3:01 PM]
Latecomer Agreement Open Prior to Issuance
Engineering Division
Per Puyallup Municipal Code Chapter 11.24, the property is subject to two recorded sanitary sewer latecomer's agreements. The property owner will be required to submit a development contribution latecomer fee for the Viking JV, LLC sanitary sewer main extension and sanitary sewer lift station/force main as defined in latecomer's agreements recorded under AFNs 202107061306 and 202406210039, respectively. The latecomer's development contribution fees have been assessed on building permit application PRCNC20241917. [Yianni Charitou @ 12/18/2025 3:02 PM] Latecomer contribution fees paid under PRCNC20241917 on 3/13/2025. [Yianni Charitou @ 12/18/2025 3:02 PM]
Backflow Protection Device - Commercial RPBA Open Prior to Completion
Engineering Division
As depicted on civil construction permit PRCCP20230970, an approved reduced pressure backflow assembly (RPBA) device is required to be installed on the commercial water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building. [Yianni Charitou @ 12/18/2025 3:03 PM]
Fire Sprinkler Protection System Water Service and Backflow Protection Device Open Prior to Completion
Engineering Division
A minimum 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal. Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building. [Yianni Charitou @ 12/18/2025 3:04 PM]
FEMA Floodplain - AE Flood Zone - Commercial Resolved Prior to Completion
Engineering Division
This property lies within a regulated flood zone. According to the FEMA LOMR Case Number 21-10-0191P issued on April 27, 2022 and effective September 8, 2022, the flooding zone has been revised and the proposed building is no longer within the AE flood zone. [Yianni Charitou @ 12/18/2025 3:05 PM]

Related Permit & Planning Applications

Reference Number Status Type
PRCNC20250094 Permit(s) Issued Commercial - New Construction
PRRWF20251393 In Plan Check Retaining Wall
PRSG20251438 Permit(s) Issued Sign/Awning
PRFS20251604 In Plan Check Fire Sprinklers

Documents & Images

Date Uploaded File Type Name
11/04/2025 Receipt Receipt for transaction:2025-002130
11/05/2025 Letter Incomplete Submittal Notice
11/26/2025 Letter Incomplete Submittal Notice
12/22/2025 Letter Permit Review Correction Letter
12/22/2025 Form Building Permit App_ETC_Suite 2_Commercial Lot 1_OUTDATED (Flattened)
12/22/2025 Plans Construction Set_ETC_Suite 2_Commercial Lot 3 (Flattened)
12/22/2025 Form Original Energy Model_ETC_Commercial Lot 1 (Flattened)
12/22/2025 Form Plumbing Fixture Worksheet_ETC_Suite 2_Commercial Lot 1 (Flattened)
12/22/2025 Other Submittal Checklist_ETC_Lot1_Suite 2 (Flattened)