CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRDE20221598


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRDE20221598
Demolition
Closed
ERNEST J. FERNANDEZ
Demolition
tear down existing 20' x 20' detached garage
10/11/2022
11/01/2022
10/15/2023

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
11/01/2022 SITE PLAN _20221024_125623 (Stamped)
11/01/2022 320PureAirApp (Stamped)
Review Type Outcome Est. Completion Date Completed
Building Review Approved 11/04/2022 11/01/2022
Planning Review Approved 11/04/2022 10/28/2022
Engineering Review Approved 11/04/2022 10/27/2022
Planning Review Approved 10/27/2022 10/24/2022
Building Review Approved 10/27/2022 10/24/2022
Engineering Review Failed 10/27/2022 10/20/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee (Demolition) $40.25 $40.25 Paid 10/11/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Utility Capping Inspection VOID 11/16/2022
Michael Rosenau ((253) 344-6753)
Erosion And Sediment Inspection Passed 11/16/2022
Michael Rosenau ((253) 344-6753)
Job Start Inspection Passed 11/16/2022
Michael Rosenau ((253) 344-6753)
Engineering Final Inspection Not Ready 11/16/2022
Michael Rosenau ((253) 344-6753)
Demolition Final Inspection Not Ready 11/16/2022 11/16/2022 11/16/2022
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
11/16/2022
1. complete engineering final approval prior to calling in this inspection

Demolition Final Inspection Not Ready 4/12/2023 4/12/2023 04/12/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
04/12/2023
1. complete engineering final approval prior to calling in this inspection

Other/Miscellaneous
Carried Forward
04/12/2023
1. complete engineering final with approval prior to calling in this inspection

Engineering Final Inspection Passed 4/18/2023 4/18/2023 04/18/2023
Michael Rosenau ((253) 344-6753)
Demolition Final Inspection VOID 12/09/2024
Joyce Kennedy ((253) 841-5405)
Corrections:


Other/Miscellaneous
Outstanding
04/12/2023
1. complete engineering final approval prior to calling in this inspection

Other/Miscellaneous
Outstanding
04/12/2023
1. complete engineering final with approval prior to calling in this inspection

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Demolition Standard Conditions Open Standard Conditions
Development Engineering standard demolition conditions: 1. All inspections shall be requested through the CityView portal. The job start and erosion and sediment inspections shall be passed prior to starting work. 2. Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. 3. The applicant shall call the Utility Notification Center at 1-800-424-5555 before beginning any work. Call 811 before you dig, it's the law. Site-specific Conditions: - No City utilities shall be removed, retired, or modified. All existing utilities shall remain to serve existing or remaining structures. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Open Standard Conditions
Planning Division
Demolition or clearing area is located in proximity a known or suspected critical area. Demolition or clearing must be limited to within 5 ft of all structes and a high visibility fence shall be erected along this perimeter. Please refer to the high visibility fencing detail available for download at: www.cityofpuyallup.org/DocumentCenter/View/13730/Tree-Protection-Detail?bidId=

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20250724 Returned for Correction Civil Construction Permit
PRCA20250966 Returned for Correction Commercial - Addition
PLPRE20220138 File Closed Pre-Application
PLCUV20240004 Waiting for Conditions CUP With Variance

Documents & Images

Date Uploaded File Type Name
10/11/2022 Form 320SDemoApp
10/11/2022 Receipt Receipt for transaction:2022-002021
10/24/2022 Letter Permit Review Comment Notice
11/01/2022 Plans SITE PLAN _20221024_125623 (Stamped)
11/01/2022 Other 320PureAirApp (Stamped)
11/01/2022 Permit Permit - Detailed
11/01/2022 Letter Permit Job Card
11/16/2022 Report Inspection Report (Engineering Final Inspection)
11/16/2022 Report Inspection Report (Demolition Final Inspection)
04/07/2023 Letter Permit Expiration Notice
09/05/2023 Letter Permit Expiration Notice


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.