CITY OF PUYALLUP PERMITTING PORTAL

Engineering Permit Application Status

PRGR20220931


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRGR20220931
Clear, Fill, & Grade Permit
Canceled
PFHC PUYALLUP LLC
Other
8.19.22 CANCELED PER EMAIL/APPLICANT -JF Clear and grub, grade and excavate to create temporary parking lot of 50' x 100' x1' thick for Hampton Inn Addition project.
06/10/2022

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Engineering Civil Review Failed 07/15/2022 07/11/2022
Public Works Collection Review VOID 07/15/2022 07/07/2022
Public Works Streets Review VOID 07/15/2022 07/07/2022
Fire Review Approved 07/15/2022 07/04/2022
Public Works Water Review Approved 07/15/2022 06/24/2022
Planning Review Failed 07/15/2022 06/23/2022
Engineering Traffic Review VOID 07/15/2022 06/21/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Clear Fill and Grading Review Fee $510.00 $510.00 Paid 06/15/2022
Record Drawing Review Fee $200.00 $200.00 Paid 06/15/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this engineering permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Civil Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard civil construction conditions: 1. Preconstruction Inspection (Preconstruction Meeting) IS REQUIRED prior to the commencement of any work under this permit. Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work. 2. Construction permitted as per approved civil plans. 3. Construction permit shall expire by limitation and be declared void if: a. Work is not started within 180 days of obtaining the permit. b. Work is abandoned for 180 days or more after beginning work. c. After two years from the date of permit issuance, regardless of whether work is finished. 4. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review. 5. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review. 6. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. NOTE: Effective January 1, 2013, RCW 19.122 - Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline, a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days, but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation. 7. It is the responsibility of the applicant/property owner to obtain all necessary approvals/permits from state, federal, and other agencies that have regulatory authority. 8. Should the City become aware of conditions that invalidate the original design data used to obtain the permit or determine that the applicant is not complying with the conditions of the permit or approved plans, the City may revoke the original permit and/or order work stopped on the project. The City may require the owner to submit a new application for review and approval. 9. All work associated with the Site Development Permit must be completed and approved by the City prior to receiving final approval of building permits. 10. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pre-Construction Meeting Open Engineering Division Standard Conditions
: Please contact the engineering support specialist, Robyn Buck, at rbuck@puyallupwa.gov to request a pre-construction meeting prior to starting site work.
Certificate of Insurance/CG2012 Open Engineering Division Prior to Issuance
: Certificate or Insurance/CG2012 must be received prior to issuance
Right-of-Way Occupation Bond Open Engineering Division Prior to Issuance
: A Right-of-Way Occupation Bond must be received by the City of Puayllup prior to permit issuance.
Miscellaneous Condition Open Development & Permitting Services
: This construction is for a temporary parking lot for vehicles associated with the Hampton Inn Addition, Civil Permit #E-20-0052. Any other or continuing use after the construction of the Hotel Addition is not approved.
Miscellaneous Condition Open Development & Permitting Services
: Gravel shall be removed and vegetation reestablished within 30 days of the completion of the hotel addition per PMC 21.14.070(5).

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.