CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRRNSF20220550
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Exhaust Hood/Range Hood - Residential Fee | $14.10 | $14.10 | Paid | 01/11/2023 |
Exhaust Vent Fan (Bath) Fee | $56.40 | $56.40 | Paid | 01/11/2023 |
Furnace (up to 100,000 BTU) Fee | $19.55 | $19.55 | Paid | 01/11/2023 |
Gas Piping (Mechanical) Fee | $7.60 | $7.60 | Paid | 01/11/2023 |
Unclassified Appliance or Equipment Fee | $14.10 | $14.10 | Paid | 01/11/2023 |
Building Permit Fee | $2,393.75 | $2,393.75 | Paid | 01/11/2023 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 01/11/2023 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 01/11/2023 |
Plumbing 1&2 Family Dwellings Fee | $240.00 | $240.00 | Paid | 01/11/2023 |
Plumbing Fixtures Fee | $65.00 | $65.00 | Paid | 01/11/2023 |
Water Heater Fee | $13.00 | $13.00 | Paid | 01/11/2023 |
Building Plan Review Fee | $1,646.94 | $1,646.94 | Paid | 08/16/2022 |
Stormwater Report Review Fee | $260.00 | $260.00 | Paid | 08/16/2022 |
Planning Review Fee | $30.00 | $30.00 | Paid | 08/16/2022 |
Mechanical Plan Review Fee | $98.64 | $98.64 | Paid | 08/16/2022 |
Plumbing Plan Review Fee | $232.70 | $232.70 | Paid | 08/16/2022 |
WA State Building Code Council Fee (Residential) | $6.50 | $6.50 | Paid | 01/11/2023 |
Sewer System Development Charge | $5,890.00 | $5,890.00 | Paid | 01/11/2023 |
Water System Development Charge | $4,260.00 | $4,260.00 | Paid | 01/11/2023 |
Storm System Development Charge | $3,560.00 | $3,560.00 | Paid | 01/11/2023 |
Traffic Impact Fee (SFR/ADU) | $4,230.00 | $4,230.00 | Paid | 01/11/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 01/11/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $23,248.28 | $23,248.28 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Erosion And Sediment Inspection | Partial Pass | 1/30/2023 | 1/30/2023 | 01/30/2023 |
Jeff Hill ((253) 204-5633) | ||||
Footing/Setback Inspection | Failed | 2/7/2023 | 2/7/2023 | 02/07/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
02/07/2023
1:complete all thread, washers and rebar in strong wall footings as per plan
2:install pier pad forms, call for reinspect
|
||||
Footing/Setback Inspection | Passed | 2/8/2023 | 2/8/2023 | 02/08/2023 |
Monty Johnson ((253) 770-3326) | ||||
Foundation/Rebar Inspection | Passed | 2/13/2023 | 2/13/2023 | 02/13/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Plumbing Rough In Inspection | Not Ready | 3/3/2023 | 3/3/2023 | 03/03/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/03/2023
1. called in on error
|
||||
Erosion And Sediment Inspection | Failed | 3/6/2023 | 3/6/2023 | 03/06/2023 |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/06/2023
remove soils from silt fence (south side of site).
install new silt fence on the west side of lot.
|
||||
Storm Inspection | Partial Pass | 03/06/2023 | ||
Jeff Hill ((253) 204-5633) | ||||
Frame Inspection | Partial Pass | 3/8/2023 | 3/8/2023 | 03/08/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/08/2023
underfloor approved with correct washers installed at roto hammered anchor bolts.
|
||||
Shear Wall Inspection | Passed | 4/5/2023 | 4/5/2023 | 04/05/2023 |
Monty Johnson ((253) 770-3326) | ||||
Plumbing Rough In Inspection | Failed | 5/2/2023 | 5/2/2023 | 05/02/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
05/02/2023
fill dwv to top, mech approved to include gas pipe approval at 17 psi, frame not ready
|
||||
Comment Building Div Inspection | Not Ready | 5/2/2023 | 5/2/2023 | 05/02/2023 |
Monty Johnson ((253) 770-3326) | ||||
Storm Inspection | Not Ready | 5/2/2023 | 5/2/2023 | 05/02/2023 |
Jeff Hill ((253) 204-5633) | ||||
Sidesewer Inspection | Partial Pass | 5/4/2023 | 05/08/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Combination Frame And Rough In Inspection | Not Ready | 5/9/2023 | 5/9/2023 | 05/09/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/09/2023
1. complete poly seal
2.provide vapor barrier under stairs in garage
3.provide access under stairs in garage
4.provide insulation and vapor barrier at tub on main floor
5. provide blocks at roof in entry way where rafters bare on wall
6.provide positive connection at rafters in entry
7. provide roof venting at east roof over master bath /bedroom
8. move heat run from unconditioned space at great room
9.provide insulation baffles at vault in great room
10. DID NOT OPEN PLANS OR TRUSS SPECS
11.NOT A COMPLETE LIST
12.NOT READY
|
||||
Sidesewer Inspection | Partial Pass | 5/10/2023 | 05/15/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Combination Frame And Rough In Inspection | Failed | 5/23/2023 | 5/23/2023 | 05/23/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
05/23/2023
1. complete poly seal
2.provide vapor barrier under stairs in garage
3.provide access under stairs in garage
4.provide insulation and vapor barrier at tub on main floor
5. provide blocks at roof in entry way where rafters bare on wall
6.provide positive connection at rafters in entry
7. provide roof venting at east roof over master bath /bedroom
8. move heat run from unconditioned space at great room
9.provide insulation baffles at vault in great room
10. DID NOT OPEN PLANS OR TRUSS SPECS
11.NOT A COMPLETE LIST
12.NOT READY
|
||||
Other/Miscellaneous
Carried Forward
05/23/2023
1:seperate back to back boxes in garage /house wall
2:provide dbl stud under girder in front bedroom
3:fire block fireplace stand
4:provide engineers ok on 7 1/2" beam depth at roof rack in lieu of 9" as per plan
5:block trusses at upper floor bearing walls while leaving space for ventilation
6:pour slab in garage at storage under stairs with plastic under also will need to rock bottom of stairs by final
7:plumb and mech ok ok to insulate
|
||||
Comment Building Div Inspection | Passed w/ Conditions | 5/31/2023 | 5/31/2023 | 05/31/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Outstanding
05/31/2023
1. provide letter from engineer for over cut beam from previous list
2.provide insulation baffles that where missing as discussed with contractor
3. ok to cover
|
||||
Comment Building Div Inspection | Partial Pass | 6/5/2023 | 6/5/2023 | 06/06/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
06/06/2023
not required for residential
|
||||
Comment Building Div Inspection | Passed | 6/29/2023 | 6/29/2023 | 06/29/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
06/29/2023
shower pan ok, still need letter from engineer on cut beam prior to final
|
||||
Erosion And Sediment Inspection | Passed | 08/23/2023 | ||
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/06/2023
remove soils from silt fence (south side of site).
install new silt fence on the west side of lot.
|
||||
Engineering Final Inspection | Failed | 8/23/2023 | 8/23/2023 | 08/23/2023 |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/23/2023
connect all down spouts
|
||||
Other/Miscellaneous
Carried Forward
08/23/2023
install carson boxes marked Sewer over sewer clean outs.
|
||||
Other/Miscellaneous
Carried Forward
08/23/2023
raise the yard drain and clean out for the infiltration trench. The clean out will need a carson box marked clean out
|
||||
Other/Miscellaneous
Carried Forward
08/23/2023
The front yard landscaping must be completed.
The backyard soils must be stabilized.
|
||||
Energy (Insulation) Inspection | VOID | 8/23/2023 | 8/23/2023 | 08/23/2023 |
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | VOID | 8/23/2023 | 8/23/2023 | 08/23/2023 |
Monty Johnson ((253) 770-3326) | ||||
Plumbing Final Inspection | Not Ready | 8/23/2023 | 8/23/2023 | 08/23/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/23/2023
provide engineering final prior to building final
|
||||
Mechanical Final Inspection | Not Ready | 8/23/2023 | 8/23/2023 | 08/23/2023 |
Monty Johnson ((253) 770-3326) | ||||
Residential Final Inspection | Failed | 8/23/2023 | 8/24/2023 | 08/24/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/24/2023
1:provide engineering final prior to building final
|
||||
Plumbing Final Inspection | Passed | 8/25/2023 | 8/25/2023 | 08/25/2023 |
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | Passed | 8/25/2023 | 8/25/2023 | 08/25/2023 |
Monty Johnson ((253) 770-3326) | ||||
Residential Final Inspection | Failed | 8/25/2023 | 8/25/2023 | 08/25/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/25/2023
FINAL PENDING ENGINEERING FINAL
|
||||
Building Final Inspection | Failed | 8/25/2023 | 8/25/2023 | 08/25/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/25/2023
FINAL PENDING ENGINEERING FINAL
|
||||
Sidesewer Inspection | Passed | 08/25/2023 | ||
Jeff Hill ((253) 204-5633) | ||||
Storm Inspection | Passed | 5/3/2023 | 08/25/2023 | |
Jeff Hill ((253) 204-5633) | ||||
Engineering Final Inspection | Passed | 8/25/2023 | 8/25/2023 | 08/25/2023 |
Jeff Hill ((253) 204-5633) | ||||
Corrections:
Other/Miscellaneous
Resolved
08/25/2023
connect all down spouts
|
||||
Other/Miscellaneous
Resolved
08/25/2023
install carson boxes marked Sewer over sewer clean outs.
|
||||
Other/Miscellaneous
Resolved
08/25/2023
raise the yard drain and clean out for the infiltration trench. The clean out will need a carson box marked clean out
|
||||
Other/Miscellaneous
Resolved
08/25/2023
The front yard landscaping must be completed.
The backyard soils must be stabilized.
|
||||
Storm Inspection | Passed | 08/25/2023 | ||
Jeff Hill ((253) 204-5633) | ||||
Residential Final Inspection | Passed | 08/25/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Plumbing Rough In Inspection | VOID | 08/25/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/03/2023
1. called in on error
|
||||
Plumbing Rough In Inspection | VOID | 08/25/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Combination Frame And Rough In Inspection | VOID | 08/25/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Building Final Inspection | Passed | 08/25/2023 | ||
Monty Johnson ((253) 770-3326) |
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Engineering Residential Standard Conditions | Open | Standard Conditions |
* Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start
** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE.
*** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. FOLLOW THE APPROVED STORMWATER REPORT
**** THE APPROVED STORMWATER MAINTENANCE AGREEMENT MUST BE RECORDED PRIOR TO THE CITY GRANTING A CERTIFIACATE OF OCCUPANCEY. ONCE RECORDED PROVIDE THE CITY WITH THE AUDITOR FILE NUMBER (AFN) FOR VERIFICATION.
* THE APPLICANT IS RESPONSIBLE TO CALL THE ENGINEERING INSPECTOR AT 253-435-3650 TO SCHEDULE A SIDE SEWER INSPECTION PRIOR TO BACKFILLING.
* SIDEWALK AND APPROACH MUST BE POURED PER CITY STANDARDS. NO WORK SHALL BE DONE IN OR ON THE PUBLIC RIGHT OF WAY WITHOUT A LICENSED AND BONDED CONTRACTOR FIRST OBTAINING A RIGHT OF WAY PERMIT.
* DRIVEWAY APPROACH MUST BE A MINIMUM OF 15' WIDE AND A MAXIMUM OF 30' WIDE. THE TOTAL WIDTH OF ALL DRIVEWAYS SHALL NOT EXCEED 50% OF THE PROPERTY FRONTAGE, PER CITY STANDARDS.
* DRIVEWAY MAY NOT EXCEED A 10% GRADE AT ANY POINT OR AS DIRECTED BY THE CITY OF PUYALLUP.
* SANITARY SEWER CLEAN-OUT TO BE INSTALLED AT THE PROPERTY LINE. IF LOCATED IN THE DRIVEWAY AREA, IT MUST BE PLACED IN A FRAME AND COVERED, PER CITY STANDARDS.
* THE BUILDER/OWNER SHALL BE RESPONSIBLE FOR KEEPING THE EXISTING RIGHT-OF-WAY FREE OF DEBRIS AND DIRT. ANY VIOLATION OF PMC CHAPTER 21.14 PERTAINING TO CLEARING, FILLING AND GRADING, EROSION AND SEDIMENT CONTROL, AND STORM WATER DISCHARGES SHALL BE PROSECUTED TO THE FULLEST EXTENT OF THE LAW.
* ANY ADDITION/EXPANSION TO THE FOOTPRINT OF THE BUILDING INCLUDING DECKS AND PORCHES NOT ORIGINALLY SHOWN ON THE APPROVED SET OF PLANS MUST OBTAIN PROPER PERMITS PRIOR TO CONSTRUCTION.
* THE APPLICANT IS RESPONSIBLE TO CALL THE UTILITY NOTIFICATION CENTER AT 1-800-424-5555 BEFORE BEGINNING ANY EXCAVATION. CALL BEFORE YOU DIG, IT'S THE LAW.
* ANY CODE REQUIREMENT THAT MAY HAVE BEEN OVERLOOKED IN THIS PLAN REVIEW DOES NOT IMPLY THAT THE REQUIREMENTS HAVE BEEN WAIVED.
* ALL NEW OR EXISTING MULTI USE AND COMMERCIAL FACILITIES ARE REQUIRED TO INSTALL, AT THE SERVICE CONNECTION AN APPROVED REDUCED PRESSURE BACKFLOW PREVENTION ASSEMBLY (RPBA), PER CITY STANDARDS.
|
||
Frontage Improvements - Residential Infill Lot | Resolved | Prior to Issuance |
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, residential infill lot projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and a right-of-way or civil construction permit issued. A right-of-way permit is required if there is existing vertical curb in good condition and a civil construction permit is required if there is no existing vertical curbing. The building permit shall be conditioned in such a manner that building occupancy will not be granted until the frontage improvements are completed and approved.
The subject site may qualify for the fee-in-lieu program in which the applicant may request and submit justification to pay a fee rather than constructing all or part of the required frontage improvements. Allowance of fee-in-lieu shall be at the discretion of the City and may be denied if the City Engineer determines it will be more beneficial to the public to have frontage improvements built along the street frontage adjoining the property or access to the property. The justification to allow use of the fee-in-lieu program shall not be based on cost savings to the applicant in comparison with constructing required improvement adjacent to the property.
|
||
Stormwater Maintenance Agreement (SWA) | Resolved | Prior to Occupancy |
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
|
||
Miscellaneous Condition | Resolved | Prior to Occupancy |
Engineering Division
Fontage improvements must be constructed and approved prior to occupancy. LL 08/22/2022
|
||
Miscellaneous Condition | Resolved | Prior to Completion |
Development & Permitting Services
A right-of-way permit is required to be issues prior to construction of the improvements. Street trees are required where planter space is available, consistent with PMC 11.28 and the VMS. Please include a street tree as part of your right-of-way permit submittal. The City also has a companion design manual – the Vegetation Management Standards (VMS) manual – found here: www.cityofpuyallup.org/puyallupvms. Please provide a landscape plan indicating street trees consistent with the city’s requirements as outlined in the Municipal Code (PMC 20.58), the Vegetation Management Standards (VMS) manual (Chapters 8.0 and 12.0) and city Public Works standards, found here: www.cityofpuyallup.org/engdetailsroadway. Include public works Standards 01.02.02, 01.02.03, 01.02.04, 01.02.08A in your final design plans.
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Development & Permitting Services
NEED COP BUS LICENSE, FEES PAID & PSD LETTER PRIOR TO ISSUANCE ~ JJ
REC'D ALL REQUIRED DOCS/ITEMS VIA EMAIL 1.11.2023 ~ JJ
|
There are no related items for this permit application.