CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRRNTH20250328
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Stormwater Inspection Fee | $360.00 | $360.00 | Paid | 12/01/2025 |
| AC Unit Fee | $58.65 | $58.65 | Paid | 12/01/2025 |
| Exhaust Hood/Range Hood - Residential Fee | $42.30 | $42.30 | Paid | 12/01/2025 |
| Unclassified Appliance or Equipment Fee | $42.30 | $42.30 | Paid | 12/01/2025 |
| Building Permit Fee | $3,585.25 | $3,585.25 | Paid | 12/01/2025 |
| Mechanical Permit Fee | $40.00 | $40.00 | Paid | 12/01/2025 |
| Plumbing Permit Fee | $40.00 | $40.00 | Paid | 12/01/2025 |
| Plumbing 1&2 Family Dwellings Fee | $240.00 | $240.00 | Paid | 12/01/2025 |
| Plumbing Fixtures Fee | $468.00 | $468.00 | Paid | 12/01/2025 |
| Water Heater Fee | $39.00 | $39.00 | Paid | 12/01/2025 |
| Building Plan Review Fee | $2,330.41 | $2,330.41 | Paid | 03/13/2025 |
| Planning Review Fee | $30.00 | $30.00 | Paid | 03/13/2025 |
| Stormwater Report Review Fee | $360.00 | $360.00 | Paid | 03/13/2025 |
| Mechanical Plan Review Fee | $119.11 | $119.11 | Paid | 03/13/2025 |
| Plumbing Plan Review Fee | $511.55 | $511.55 | Paid | 03/13/2025 |
| WA State Building Code Council Fee (Residential) | $10.50 | $10.50 | Paid | 12/01/2025 |
| Traffic Impact Fee (SFR/ADU) | $5,625.90 | $5,625.90 | Paid | 12/01/2025 |
| Park Impact Fee | $9,873.93 | $9,873.93 | Paid | 12/01/2025 |
| Sewer System Development Charge | $9,832.58 | $9,832.58 | Paid | 12/01/2025 |
|
$16,387.64
|
||||
| Water System Development Charge | $8,087.38 | $8,087.38 | Paid | 12/01/2025 |
|
$13,478.97
|
||||
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 05/01/2025 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $41,876.86 | $41,876.86 | $0.00 | |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Comment Building Div Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Comment Engineering Div Inspection | Pending | |||
| Slab/Insulation Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Plumbing Rough In Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Combination Frame And Rough In Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Carbon Monoxide Detectors Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Storm Inspection | Pending | |||
| Fire Sprinkler Cover Inspection | Pending | |||
| David Drake ((253) 864-4171) | ||||
| Engineering Final Inspection | Pending | |||
| Fire Final Inspection | Pending | |||
| David Drake ((253) 864-4171) | ||||
| Residential Final Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Mechanical Final Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Energy (Insulation) Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Frame Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Plumbing Final Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Footing/Setback Inspection | Not Ready | 12/11/2025 | 12/11/2025 | 12/11/2025 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
12/11/2025
1 ; provide E&S inspection approval prior to footing inspection.
|
||||
| Erosion And Sediment Inspection | Passed | 12/12/2025 | 12/11/2025 | |
| Jeff Hill ((253) 204-5633) | ||||
| Footing/Setback Inspection | Failed | 12/12/2025 | 12/12/2025 | 12/12/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
12/12/2025
1 ; provide E&S inspection approval prior to footing inspection.
|
||||
|
Other/Miscellaneous
Carried Forward
12/12/2025
1:fill in bottom of form boards where needed
2:install holdowns where in footing
3:provide approved plans and site plan
|
||||
| Footing/Setback Inspection | Passed | 12/15/2025 | 12/15/2025 | 12/15/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Foundation/Rebar Inspection | Passed | 12/23/2025 | 12/23/2025 | 12/23/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Underfloor Inspection | Failed | 1/30/2026 | 1/30/2026 | 01/30/2026 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
01/30/2026
1. Provide EOR approval for structural difference from print to infield product for mechanical rooms at back off units.
|
||||
| Underfloor Inspection | Not Ready | 2/3/2026 | 2/3/2026 | 02/03/2026 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/03/2026
1. Provide EOR approval for structural difference from print to infield product for mechanical rooms at back off units.
|
||||
| Underfloor Inspection | Passed | 2/4/2026 | 2/4/2026 | 02/04/2026 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
02/04/2026
1. Provide EOR approval for structural difference from print to infield product for mechanical rooms at back off units.
|
||||
| Energy (Insulation) Inspection | Not Ready | 2/11/2026 | 2/11/2026 | 02/11/2026 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/11/2026
1. Inspection was for 1 hour fire wall partition between units. Dens glass sheetrock must cover all wood with no gaps in-between sheets.
2. Discussed with contractor on how to proceed.
|
||||
| Energy (Insulation) Inspection | Partial Pass | 2/12/2026 | 2/12/2026 | 02/12/2026 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
02/12/2026
1. Inspection was for 1 hour fire wall partition between units. Dens glass sheetrock must cover all wood with no gaps in-between sheets.
2. Discussed with contractor on how to proceed.
|
||||
| Energy (Insulation) Inspection | Partial Pass | 2/18/2026 | 2/18/2026 | 02/18/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Shear Wall Inspection | Not Ready | 3/17/2026 | 3/17/2026 | 03/17/2026 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
03/17/2026
1 ; renail all over driven nails as discussed with contractor.
2 ; complete strap at window at n.w. corner of 2nd floor.
3 ; complete all nailing as per city approved plans.
not ready.
|
||||
| Frame Inspection | Not Ready | 3/17/2026 | 3/17/2026 | 03/17/2026 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
03/17/2026
complete over framing of roof as per city approved plans. ( inspection of roof sheathing only)
|
||||
| Frame Inspection | Partial Pass | 3/19/2026 | 3/19/2026 | 03/19/2026 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
03/19/2026
complete over framing of roof as per city approved plans. ( inspection of roof sheathing only)
|
||||
| Shear Wall Inspection | Passed | 3/19/2026 | 3/19/2026 | 03/19/2026 |
| Shannon King ((253) 840-6684) | ||||
| Energy (Insulation) Inspection | Not Ready | 4/27/2026 | 4/27/2026 | 04/27/2026 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
04/27/2026
1 ; complete slab insulation as per city approved plans at mechanical room slab.
|
||||
| Energy (Insulation) Inspection | Partial Pass | 5/5/2026 | 5/5/2026 | 05/05/2026 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
05/05/2026
1 ; complete slab insulation as per city approved plans at mechanical room slab.
|
||||
| Energy (Insulation) Inspection | Partial Pass | 5/11/2026 | 5/11/2026 | 05/11/2026 |
| Shannon King ((253) 840-6684) | ||||
| Frame Inspection | Not Ready | 6/18/2026 | 6/18/2026 | 06/18/2026 |
| Shannon King ((253) 840-6684) | ||||
| Plumbing Final Inspection | Partial Pass | 6/18/2026 | 6/18/2026 | 06/18/2026 |
| Shannon King ((253) 840-6684) | ||||
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Engineering Residential Standard Conditions | Open | Standard Conditions |
|
Engineering Division
Development Engineering standard residential conditions:
- All inspections, including erosion and sediment, utility, and final inspections, shall be requested through the CityView portal.
- Prior to starting site work, request an erosion and sediment inspection through the CityView portal.
- Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods.
- Stormwater control of roof downspouts shall be controlled. If approved by Development Engineering, the applicant may use City standard details 02.05.01 and 05.05.03 for an individual roof downspout infiltration system.
- The applicant is responsible to call the engineering inspector at 253-435-3650 to schedule a side sewer inspection prior to backfilling.
- Curb, gutter, sidewalk, and approach must be poured per city standards. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Driveway approach must be a minimum of 15' wide and a maximum of 30' wide. The total width of all driveways shall not exceed 50% of the property frontage per City standards.
- Driveway may not exceed a 10% grade at any point or as directed by the City of Puyallup.
- Sanitary sewer clean-out to be installed at the property line. If located in the driveway area, it must be placed in a frame and covered per City standards.
- The water meter box shall not be located in hard surfaces. The water meter box and/or water service may need to be relocated or adjusted, at owner's expense, to accommodate for site and grade changes. The new location and grade must be approved by the City of Puyallup.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
- To tie into an existing force main, the property owner must install a private pump system per city standards.
- All new or existing multi use and commercial facilities are required to install, at the service connection an approved reduced pressure backflow prevention assembly (RPBA) per city standards.
|
||
| Ready to Issue - Need School District Letter | Resolved | Prior to Issuance |
|
Development & Permitting Services
Must provide letter from Puyallup School District stating that school impact fees have been paid.
|
||
| Miscellaneous Condition | Open | Standard Conditions |
|
Traffic Division
The city has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip. Final fees will be calculated and assessed by the City at the time of building permit issuance
Calculated TIF = $9000 - Single Family Attached housing LUC 215, 3 residential units, average rate is 2 PM Peak Hour Trips * $4500
|
||
| Miscellaneous Condition | Open | Standard Conditions |
|
Traffic Division
Park impact fee was established by Ordinance 3142 dated July 3, 2017 and shall be charged per new dwelling unit based on its size:
Park Impact Fee (Per residential dwelling Unit):
Less than 500 sqft $1,560.05
500 - 999 sqft $2,313.53
1,000 – 1,999 sqft $3,291.31
2,000 sqft or more $4,017.30
Calculated Park Impact Fee at 3 units 1000-1999 sqft ($3291.31 per unit) = $9873.93
|
||
| Fire Review Conditions | Open | Standard Conditions |
|
Development & Permitting Services
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS.
2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE.
3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE.
4. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
|
||
| Miscellaneous Condition | Open | Standard Conditions |
|
Traffic Division
Provide a Traffic Control Plan with 2nd submittal, for any work to be conducted in the right of way.
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Development & Permitting Services
PRRNTH20250328 shall not be issued until associated PRCCP20241694 is approved.
|
||
| Frontage Improvements - Residential Infill Lot | Open | Prior to Completion |
|
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, residential infill lot projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and a right-of-way or civil construction permit issued. A right-of-way permit is required if there is existing vertical curb in good condition and a civil construction permit is required if there is no existing vertical curbing. The building permit shall be conditioned in such a manner that building occupancy will not be granted until the frontage improvements are completed and approved.
Frontage improvement design shown on PRCCP20241694
|
||
| Stormwater Maintenance Agreement (SWA) | Open | Prior to Completion |
|
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
|
||
| Ready to Issue - Need Contractor Info | Resolved | Prior to Issuance |
|
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
5.12.25 OWNER/BUILDER: CONFIRMED L& I STATE CONTRACTOR INFORMATION IS PRESENTLY CURRENT [Jeannesha Frazier @ 05/12/2025 10:10 AM]
|
||
| Ready to Issue - Need School District Letter | Resolved | Prior to Issuance |
|
Development & Permitting Services
Must provide letter from Puyallup School District stating that school impact fees have been paid.
|
||
| Ready to Issue - Need Business License Endorsement | Resolved | Prior to Issuance |
|
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.