Summary

PRDE20250669
Demolition
Closed
SEATAC ENTERPRISE LLC
Demolition
REMOVE AN EXISTING DETACHED DWELLING UNIT: HOUSE, DETACHAED GARAGE & (3) TINY SHEDS ~ 1200 7th AVE TOWNHOMES
05/19/2025
06/16/2025
04/12/2026
10/14/2025

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
06/16/2025 DEMO SITE PLAN - (Stamped)
06/16/2025 PSCA (Stamped)
Review Type Outcome Est. Completion Date Completed
Planning Review Approved 06/30/2025 06/16/2025
Engineering Review Approved 06/30/2025 06/16/2025
Building Review Approved 06/30/2025 06/13/2025
Engineering Review Failed 06/09/2025 06/06/2025
Planning Review Approved 06/09/2025 06/05/2025
Building Review Approved 06/09/2025 05/21/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Water Service Removal for Demo (at meter) Fee $200.00 $200.00 Paid 06/16/2025
Demo Sewer Service Fee $30.00 $30.00 Paid 06/16/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Utility Capping Inspection Passed 6/18/2025 6/18/2025 06/18/2025
Jeff Hill ((253) 204-5633)
Erosion And Sediment Inspection Partial Pass 06/18/2025
Jeff Hill ((253) 204-5633)
Job Start Inspection Passed 06/18/2025
Jeff Hill ((253) 204-5633)
Erosion And Sediment Inspection Failed 7/3/2025 07/03/2025
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Resolved
10/14/2025
stabilize all disturbed soils and remove debris

Erosion And Sediment Inspection Passed 10/14/2025
Jeff Hill ((253) 204-5633)
Corrections:


Other/Miscellaneous
Resolved
10/14/2025
stabilize all disturbed soils and remove debris

Engineering Final Inspection Passed 10/14/2025
Jeff Hill ((253) 204-5633)
Demolition Final Inspection Passed 10/14/2025 10/14/2025 10/14/2025
Jeff Hill ((253) 204-5633)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Demolition Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard demolition conditions: 1. All inspections shall be requested through the CityView portal. The job start and erosion and sediment inspections shall be passed prior to starting work. 2. Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. 3. The applicant shall call the Utility Notification Center at 1-800-424-5555 before beginning any work. Call 811 before you dig, it's the law. Site-specific Conditions: t I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct. Indemnification / Hold Harmless The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Miscellaneous Condition Resolved Prior to Completion
Engineering Division
Under the demolition permit, the contractor shall cut and cap the sanitary sewer lateral on the customer's side of the cleanout located at the property line, under the supervision of a City Inspector, prior to any demolition. No work is permitted in the public right-of-way under the demolition permit. Under civil construction permit, however, the existing sewer lateral shall be removed at the main even though it is not depicted on the approved PRCCP20241694civil plans. The City shall verify the civil permit lateral removal prior to closing the demolition permit.
Plumbing FUW Utility Service Credit Open Standard Conditions
Engineering Division
Supplemental to your demolition permit PRDE20250669 at 1200 7TH AVE SE, APN 7845001330, utility service credits are available to be used for future building permits. With the SFR demolition, the site is granted 15 sewer FUW, 15 water FUW, and 1 stormwater ESU credits. Credits may only be redeemed at this location within six years of demolition permit issuance. It is the responsibility of the applicant to retain a copy of this email, provide a copy of this email to all project stakeholders, and request credit redemption on future development permits. Since you have already applied for the development permits, City plan reviewers have been asked to proactively apply the stormwater credit to civil permit application PRCCP20241694 and the water/sewer credits to building permit application PRRNTH20250328 (building A). [Yianni Charitou @ 06/16/2025 6:44 AM]

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20241694 Permit(s) Issued Civil Construction Permit
PRRNTH20250328 Permit(s) Issued Residential - New Townhouse
PRRNTH20250333 Permit(s) Issued Residential - New Townhouse
PLPRE20240022 File Closed Pre-Application
PLPSP20240066 File Closed Preliminary Site Plan

Documents & Images

Date Uploaded File Type Name
06/05/2025 Plans Sanitary Sewer Sketch 7th_Ave_SE_1200
06/06/2025 Plans CoP Site Plan Standards
06/16/2025 Plans DEMO SITE PLAN - (Stamped)
06/16/2025 Other PSCA (Stamped)
06/16/2025 Letter Permit - Detailed
06/16/2025 Receipt Receipt for transaction:2025-001154
07/03/2025 Report Inspection Report (Erosion And Sediment Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.