CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRRNTH20250333


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRRNTH20250333
Residential - New Townhouse
Permit(s) Issued
SEATAC ENTERPRISE LLC
New
Residential, multiple family
CONSTRUCT (3) TOWNHOUSE DWELLING UNITS (BLDG B)~ 1200 7th AVE TOWNHOUSES
03/05/2025
10/21/2025
12/01/2026

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 05/15/2025 05/08/2025
Design Review Approved 05/15/2025 05/08/2025
Planning Review Approved 05/15/2025 05/08/2025
Engineering Traffic Review Approved 05/15/2025 05/07/2025
Traffic Control Plan Review VOID 05/15/2025 05/07/2025
Engineering Storm Review VOID 05/15/2025 05/07/2025
Building Review Approved 05/15/2025 05/06/2025
Fire Review Approved 05/15/2025 05/02/2025
Planning Review Approved 04/10/2025 04/11/2025
Design Review Approved 04/10/2025 04/11/2025
Engineering Storm Review VOID 04/10/2025 04/09/2025
Engineering Review Failed 04/10/2025 04/08/2025
Traffic Control Plan Review Approved 04/10/2025 04/04/2025
Fire Review Approved 04/10/2025 04/04/2025
Engineering Traffic Review Approved 04/10/2025 04/02/2025
Building Review Failed 04/10/2025 03/27/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Stormwater Inspection Fee $360.00 $360.00 Paid 10/21/2025
AC Unit Fee $58.65 $58.65 Paid 10/21/2025
Exhaust Hood/Range Hood - Residential Fee $42.30 $42.30 Paid 10/21/2025
Unclassified Appliance or Equipment Fee $42.30 $42.30 Paid 10/21/2025
Building Permit Fee $3,088.15 $3,088.15 Paid 10/21/2025
Mechanical Permit Fee $40.00 $40.00 Paid 10/21/2025
Plumbing Fixtures Fee $390.00 $390.00 Paid 10/21/2025
Plumbing Permit Fee $40.00 $40.00 Paid 10/21/2025
Water Heater Fee $39.00 $39.00 Paid 10/21/2025
Building Plan Review Fee $2,007.30 $2,007.30 Paid 03/13/2025
Planning Review Fee $30.00 $30.00 Paid 03/13/2025
Stormwater Report Review Fee $360.00 $360.00 Paid 03/13/2025
Mechanical Plan Review Fee $119.11 $119.11 Paid 03/13/2025
WA State Building Code Council Fee (Residential) $10.50 $10.50 Paid 10/21/2025
Park Impact Fee $8,896.15 $8,896.15 Paid 10/21/2025
Traffic Impact Fee (SFR/ADU) $5,625.90 $5,625.90 Paid 10/21/2025
Water System Development Charge $13,478.97 $13,478.97 Paid 10/21/2025
Sewer System Development Charge $16,387.64 $16,387.64 Paid 10/21/2025
Resubmittal/Revision Fee $180.00 $180.00 Paid 05/01/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection Pending
Slab/Insulation Inspection Pending
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection Pending
Shannon King ((253) 840-6684)
Carbon Monoxide Detectors Inspection Pending
Shannon King ((253) 840-6684)
Storm Inspection Pending
Fire Sprinkler Cover Inspection Pending
David Drake ((253) 864-4171)
Fire Sprinkler Final Inspection Pending
David Drake ((253) 864-4171)
Engineering Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Residential Final Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Final Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Final Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Pending
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Erosion And Sediment Inspection Passed 12/12/2025 12/11/2025
Jeff Hill ((253) 204-5633)
Footing/Setback Inspection Not Ready 12/11/2025 12/11/2025 12/11/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
12/11/2025
1 ; provide E&S inspection approval prior to footing inspection.

Footing/Setback Inspection Failed 12/12/2025 12/12/2025 12/12/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
12/12/2025
1 ; provide E&S inspection approval prior to footing inspection.

Other/Miscellaneous
Carried Forward
12/12/2025
1:provide approved plans and site plan 2:fill in bottom of form boards as needed 3:install holdowns where in footings

Footing/Setback Inspection Passed 12/15/2025 12/15/2025 12/15/2025
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection Passed 12/23/2025 12/23/2025 12/23/2025
Monty Johnson ((253) 770-3326)
Underfloor Inspection Passed 2/24/2026 2/24/2026 02/24/2026
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection Failed 2/26/2026 2/26/2026 02/26/2026
James LaVergne ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/26/2026
1. Dens glass not complete at time of inspection. 10:30am 2. Asked contractor to please call-in drywall inspection for next dens glass inspection.

Wallboard / Drywall Inspection Partial Pass 3/2/2026 3/2/2026 03/02/2026
James LaVergne ((253) 841-5590)
Wallboard / Drywall Inspection Not Ready 3/4/2026 3/4/2026 03/04/2026
James LaVergne ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 3/5/2026 3/5/2026 03/05/2026
Shannon King ((253) 840-6684)
Shear Wall Inspection Passed 3/31/2026 3/31/2026 03/31/2026
James LaVergne ((253) 841-5590)
Frame Inspection Partial Pass 3/31/2026 3/31/2026 03/31/2026
James LaVergne ((253) 841-5590)
Energy (Insulation) Inspection Not Ready 4/27/2026 4/27/2026 04/27/2026
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
04/27/2026
1. Dens glass not complete at time of inspection. 10:30am 2. Asked contractor to please call-in drywall inspection for next dens glass inspection.

Other/Miscellaneous
Carried Forward
04/27/2026
1 ; complete slab insulation as per city approved plans at mechanical room slab

Energy (Insulation) Inspection Partial Pass 5/5/2026 5/5/2026 05/05/2026
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
05/05/2026
1. Dens glass not complete at time of inspection. 10:30am 2. Asked contractor to please call-in drywall inspection for next dens glass inspection.

Other/Miscellaneous
Resolved
05/05/2026
1 ; complete slab insulation as per city approved plans at mechanical room slab

Energy (Insulation) Inspection Partial Pass 5/21/2026 5/21/2026 05/21/2026
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
05/21/2026
1. Dens glass not complete at time of inspection. 10:30am 2. Asked contractor to please call-in drywall inspection for next dens glass inspection.

Plumbing Rough In Inspection Not Ready 5/22/2026 5/22/2026 05/22/2026
James LaVergne ((253) 841-5590)
Energy (Insulation) Inspection Partial Pass 6/4/2026 6/4/2026 06/04/2026
James LaVergne ((253) 841-5590)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Residential Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard residential conditions: - All inspections, including erosion and sediment, utility, and final inspections, shall be requested through the CityView portal. - Prior to starting site work, request an erosion and sediment inspection through the CityView portal. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. - Stormwater control of roof downspouts shall be controlled. If approved by Development Engineering, the applicant may use City standard details 02.05.01 and 05.05.03 for an individual roof downspout infiltration system. - The applicant is responsible to call the engineering inspector at 253-435-3650 to schedule a side sewer inspection prior to backfilling. - Curb, gutter, sidewalk, and approach must be poured per city standards. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Driveway approach must be a minimum of 15' wide and a maximum of 30' wide. The total width of all driveways shall not exceed 50% of the property frontage per City standards. - Driveway may not exceed a 10% grade at any point or as directed by the City of Puyallup. - Sanitary sewer clean-out to be installed at the property line. If located in the driveway area, it must be placed in a frame and covered per City standards. - The water meter box shall not be located in hard surfaces. The water meter box and/or water service may need to be relocated or adjusted, at owner's expense, to accommodate for site and grade changes. The new location and grade must be approved by the City of Puyallup. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. - To tie into an existing force main, the property owner must install a private pump system per city standards. - All new or existing multi use and commercial facilities are required to install, at the service connection an approved reduced pressure backflow prevention assembly (RPBA) per city standards.
Ready to Issue - Need School District Letter Resolved Prior to Issuance
Development & Permitting Services
Must provide letter from Puyallup School District stating that school impact fees have been paid.
Miscellaneous Condition Open Standard Conditions
Traffic Division
The city has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip. Final fees will be calculated and assessed by the City at the time of building permit issuance Calculated TIF = $9000 - Single Family Attached housing LUC 215, 3 residential units, average rate is 2 PM Peak Hour Trips * $4500
Miscellaneous Condition Open Standard Conditions
Traffic Division
Park impact fee was established by Ordinance 3142 dated July 3, 2017 and shall be charged per new dwelling unit based on its size: Park Impact Fee (Per residential dwelling Unit): Less than 500 sqft $1,560.05 500 - 999 sqft $2,313.53 1,000 – 1,999 sqft $3,291.31 2,000 sqft or more $4,017.30 Calculated Park Impact Fee at 3 units 1000-1999 sqft ($3291.31 per unit) = $9873.93
Fire Review Conditions Open Standard Conditions
Development & Permitting Services
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS. 2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE. 3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE. 4. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
Miscellaneous Condition Open Standard Conditions
Traffic Division
Provide a Traffic Control Plan with 2nd submittal, for any work to be conducted in the right of way.
Miscellaneous Condition Resolved Prior to Issuance
Development & Permitting Services
PRRNTH20250333 shall not be issued until associated PRCCP20241694 is approved.
Stormwater Maintenance Agreement (SWA) Open Prior to Occupancy
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
Ready to Issue - Need Contractor Info Resolved Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue. OWNER/BUILDER: CONFIRMED L& I STATE CONTRACTOR INFORMATION IS PRESENTLY CURRENT
Ready to Issue - Need Business License Endorsement Resolved Prior to Issuance
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20241694 Permit(s) Issued Civil Construction Permit
PRRNTH20250328 Permit(s) Issued Residential - New Townhouse
PRDE20250669 Closed Demolition
PLPRE20240022 File Closed Pre-Application
PLPSP20240066 File Closed Preliminary Site Plan

Documents & Images

Date Uploaded File Type Name
03/13/2025 Receipt Receipt for transaction:2025-000492
05/01/2025 Receipt Receipt for transaction:2025-000848
05/12/2025 Report SOILS REPORT (Stamped)
05/12/2025 Plans CONSTRUCTION PLAN SET-BLDG B - (Stamped)
05/12/2025 Form WESC - BLDG B (Stamped)
05/12/2025 Report STRUCTURAL CALCS-BLDG B (Stamped)
05/12/2025 Report HVAC LOAD CALCS - BLDG B (Stamped)
05/12/2025 Plans TRUSS LAYOUT-BLDG B (Stamped)
05/12/2025 Report TRUSS SPECIFICATION PACKET-BLDG B (Stamped)
10/21/2025 Receipt Receipt for transaction:2025-002048
10/21/2025 Permit Permit - Detailed
10/21/2025 Letter Permit Job Card
12/11/2025 Report Inspection Report (Footing/Setback Inspection)
02/26/2026 Report Inspection Report (Energy (Insulation) Inspection)
03/02/2026 Report Inspection Report (Wallboard / Drywall Inspection)
03/04/2026 Report Inspection Report (Wallboard / Drywall Inspection)
03/05/2026 Report Inspection Report (Wallboard / Drywall Inspection)
03/31/2026 Report Inspection Report (Shear Wall Inspection)
03/31/2026 Report Inspection Report (Frame Inspection)
04/27/2026 Report Inspection Report (Energy (Insulation) Inspection)
05/21/2026 Report Inspection Report (Energy (Insulation) Inspection)
05/21/2026 Report Inspection Report (Energy (Insulation) Inspection)
05/22/2026 Report Inspection Report (Plumbing Rough In Inspection)
06/04/2026 Report Inspection Report (Energy (Insulation) Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.