Summary

B-21-0029
Change of Use
Closed
SCM ASSOCIATES LLC
Alteration/Remodel
CHANGE OF USE FROM R3 TO OFFICE USE ~ PRO VACBLDG/PLUMB/MECH 2015 CODES
01/15/2021
07/12/2021
12/26/2023

Locations

Property
2105200191

* Address
2505 INTER AVE

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 06/30/2021
Building Review Incomplete 06/14/2021
Building Review Incomplete 04/21/2021
Fire Review Approved 04/05/2021
Engineering Review Approved 04/01/2021
Planning Review In Progress 04/01/2021
Planning Review Incomplete 03/12/2021
Fire Review Approved 02/25/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Planning Building Permit Fee $30.00 $30.00 Paid 07/07/2021
No
Planning Landscape Review Fee $90.00 $90.00 Paid 07/07/2021
No
Park Impact Fee $1,435.50 $1,435.50 Paid 07/07/2021
No
Legacy Fee $130.00 $130.00 Paid 07/07/2021
No
Traffic Impact Fee $4,038.75 $4,038.75 Paid 07/07/2021
No
Building Division Fee (Hourly) $130.00 $130.00 Paid 07/07/2021
No
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 01/18/2021
No
Mechanical Plan Review Fee $47.87 $47.87 Paid 01/18/2021
No
Plumbing Permit Fee $157.00 $157.00 Paid 01/18/2021
No
WA State Building Code Council Fee (Residential) $25.00 $25.00 Paid 01/18/2021
No
Mechanical Permit Fee $73.65 $73.65 Paid 01/18/2021
No
Plumbing Plan Review Fee $102.05 $102.05 Paid 01/18/2021
No
Building Plan Review Fee $791.54 $791.54 Paid 01/18/2021
No
Building Permit Fee $1,217.75 $1,217.75 Paid 01/18/2021
No
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Erosion And Sediment Inspection Approved 7/28/2021 07/28/2021
Marcus Sedlickas ((253) 405-1707)
Comment Building Div Inspection Comments 7/28/2021 07/28/2021
Gary Webster ((253) 841-5590)
Mechanical Rough In Inspection In Progress 8/23/2021 08/23/2021
Gary Webster ((253) 841-5590)
Mechanical Rough In Inspection Approved 12/3/2021 12/03/2021
Monty Johnson ((253) 770-3326)
Frame Inspection Not Ready 12/7/2021 12/07/2021
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection Failed 12/13/2021 12/13/2021 12/15/2021
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Outstanding
12/15/2021
1 provide beam to post connection (lpcz) 2 nail 2"x8" sistered as per plan 3 provide h2.5 (hurricane clip) every rafter 4 engineer approval of added beam 5 complete detail 3 of S2.2 6 strap all non lapped top plates as per plan 7 will inspect underfloor framing & pads after engineer approval or fix for added beam

Combination Frame And Rough In Inspection Failed 1/10/2022 1/10/2022 01/10/2022
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Carried Forward
01/10/2022
complete underfloor pads, posts, & beams as per city approved plans

Footing/Setback Inspection Partial Pass 1/21/2022 1/21/2022 01/21/2022
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Carried Forward
01/21/2022
inspection for pads of west 3rd - ok

Footing/Setback Inspection Partial Pass 2/1/2022 2/1/2022 02/01/2022
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Carried Forward
02/01/2022
inspection for pads of west 3rd - ok

Other/Miscellaneous
Carried Forward
02/01/2022
approx. 3/4 of pads complete

Combination Frame And Rough In Inspection Passed w/ Conditions 2/22/2022 2/22/2022 02/22/2022
Gary Webster ((253) 841-5590)
Other/Miscellaneous
Resolved
02/22/2022
complete underfloor pads, posts, & beams as per city approved plans

Other/Miscellaneous
Outstanding
02/22/2022
inspection of framing in crawl will be inspected @ final

Carbon Monoxide Detectors Inspection Failed 4/26/2022 4/26/2022 04/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/26/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Building Final Inspection Not Ready 4/26/2022 4/26/2022 04/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/26/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Plumbing Final Inspection Not Ready 4/26/2022 4/26/2022 04/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/26/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Plumbing Rough In Inspection Not Ready 4/26/2022 4/26/2022 04/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/26/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Frame Inspection Not Ready 4/26/2022 4/26/2022 04/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Outstanding
04/26/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Mechanical Final Inspection Not Ready 4/26/2022 4/26/2022 04/26/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
04/26/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Fire Final Inspection Failed 4/26/2022 4/26/2022 04/27/2022
David Drake ((253) 864-4171)
Fire Final Inspection Failed 4/29/2022 4/29/2022 04/29/2022
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Carried Forward
04/29/2022
1. Mount fire extinguisher(s) For installation instructions provided with extinguisher. 2. Complete installation by dating and initially date of service/Purchase on the tag on the fire extinguisher

Comment Building Div Inspection VOID 5/17/2022 5/17/2022 05/17/2022
Monty Johnson ((253) 770-3326)
Carbon Monoxide Detectors Inspection Not Ready 6/9/2022 6/9/2022 06/09/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
06/09/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Building Final Inspection Not Ready 7/1/2022 7/5/2022 07/05/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/05/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Other/Miscellaneous
Carried Forward
07/05/2022
contractor said he would wait for shannons return.

Building Final Inspection Not Ready 7/12/2022 7/12/2022 07/12/2022
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
07/12/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Other/Miscellaneous
Carried Forward
07/12/2022
1. cancelled by owner

Building Final Inspection Not Ready 7/14/2022 7/14/2022 07/14/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
07/14/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Other/Miscellaneous
Carried Forward
07/14/2022
1. cancelled by owner

Building Final Inspection Not Ready 8/26/2022 8/26/2022 08/26/2022
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
07/14/2022

Other/Miscellaneous
07/14/2022

Building Final Inspection Failed 8/30/2022 8/30/2022 08/30/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
08/30/2022
1. provide plumbing boot at supplies in both bath rooms 2. complete all handrails at 34" to 38" above stair nosing as discussed with contractor 3.clean all debris from crawl space 4. provide proper vapor barrier 5.Provide bearing at beams in crawlspace per conversation with contractor 6. Provide ADA signage 7.complete insulation at main trunk line of supply line crawl space 8.use treated wood at all screen at foundation vents 9.provide insulation at cans in attic space 10.provide insulation at crawl space lid 11.provide clearance from ground to main trunk line in crawlspace

Building Final Inspection VOID 03/19/2023
CityView System Manger
Other/Miscellaneous
07/14/2022

Other/Miscellaneous
07/14/2022

Ceiling Grid/T-Bar Inspection VOID 06/29/2023
Ray Cockerham ((253) 841-5585)
Planning Final Inspection VOID 06/29/2023
Ray Cockerham ((253) 841-5585)
Shear Wall Inspection VOID 06/29/2023
Ray Cockerham ((253) 841-5585)
Plumbing Final Inspection VOID 06/29/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Outstanding
04/26/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Plumbing Rough In Inspection VOID 06/29/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Outstanding
04/26/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Frame Inspection VOID 06/29/2023
Ray Cockerham ((253) 841-5585)
Mechanical Final Inspection VOID 06/29/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Outstanding
04/26/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Carbon Monoxide Detectors Inspection VOID 06/29/2023
Ray Cockerham ((253) 841-5585)
Other/Miscellaneous
Outstanding
06/09/2022
1 ; provide Engineering ,Fire ,and L&I final prior to building final inspection. 2 ; talked about framing of under floor requirements with approved access prior to underfloor framing inspection, 3 ; talked about building, plumbing, mechanical final requirements.( not ready)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Resolved Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Engineering Commercial Standard Conditions Resolved Engineering Division Standard Conditions
: * Prior to STARTING site work; request inspection for Erosion and Sediment - Inspection Code # 1010; Inspection request line phone 1-877-232-6456 ** OCCUPANCY WILL NOT BE GRANTED UNTIL ALL CIVIL WORK ASSOCIATED WITH THIS PROJECT IS COMPLETED AND APPROVAL HAS BEEN PROVIDED ** * THE APPLICANT IS RESPONSIBLE TO CALL THE INSPECTION LINE AT 877-232-6456 TO SCHEDULE INSPECTIONS. UTILITY INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. ** STORMWATER CONTROL OF ROOF DOWNSPOUTS MUST BE CONTROLLED. ATTACHED TO THE SITE PLAN IS A TYPICAL INFILTRATION SYSTEM YOU MAY CHOOSE TO FOLLOW. ** SEDIMENT CONTROL AND EROSION PROCEDURES SHALL BE PRACTICE TO ELIMINATE AND PREVENT OFF SITE DAMAGE. STORMWATER RUNOFF ORIGINATING UPGRADE OF EXPOSED AREAS SHALL BE CONTROLLED TO REDUCE EROSION AND SEDIMENT LOSS DURING THE PERIOD OF EXPOSURE. * Curb, gutter, sidewalk and approach must be poured per City Standards. * Driveway approach must be a minimum of 30' wide. * The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. * No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. * All commercial development water service connections are to be protected by a reduced pressure backflow assembly (RPBA), as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to City Standard Section 3.2.2 and Details 03.04.02-1, 03.04.02-2 and 03.04.03.
Building Permit Standard Conditions Resolved Building Division Standard Conditions
: PERMIT CONDITIONS: 1- COMPLY WITH 2015 IFC AND 2015 IBC 2- EXIT LIGHTING TEST REQUIRED CONTRACTOR TO PROVIDE LIGHT METER 3- FIRE EXTINGUISHERS REQUIRED PER CODE 4- ALL ABOVE ITEMS TO BE COMPLETED PRIOR TO FIRE FINAL. FIRE FINAL REQUIRED BEFORE BUILDING FINAL 5. Office use must be associated with another permitted use. Stand-alone offices are prohibited in the ML zone Per PMC 20.35.010 (23). INSPECTION REQUEST CODES: 2252 EXIT LIGHT TEST 9200 FIRE BUILDING FINAL SCHEDULE YOUR INSPECTION BY PHONE OR ONLINE THROUGH THE CITY OF PUYALLUP ONLINE PERMIT SYSTEM. THEN CALL MORNING OF INSPECTION BETWEEN 7AM - 8AM TO SET UP A TIME. INSPECTIONS ARE MONDAY - THURSDAY THERE WILL BE NO INSPECTIONS ON FRIDAYS. HTTPS://SECURE.CITYOFPUYALLUP.ORG/ INSPECTION LINE 1-877-232-6456 (USE MUTE TO AVOID BACKGROUND NOISE) DAVID DRAKE AT 253-864-4171 OR RAY COCKERHAM AT 253-841-5585
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.

Related Permit & Planning Applications

Reference Number Status Type
E-21-0071 In Plan Check Civil Construction Permit
B-21-0263 Canceled Commercial - Tenant Improvement/Remodel
P-20-0050 Expired Pre-Application
P-20-0137 File Closed Temporary Use
PLSSP20220062 Waiting for Conditions SEPA Standalone