| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
Engineering Traffic Review
|
Approved
|
08/08/2022
|
08/18/2022
|
|
|
|
|
|
Other/Miscellaneous
Traffic Scoping Document:
The existing 2000sqft portable was part of temporary use permit P-20-0137. This building did not pay traffic impact fees and therefore will not receive credits when removed.
Recalculate trips using ITE LUC 180 “Specialty Trade Contractor”
Building area shall be 4,774 sqft (2,602 + 300 + 1,872)
PM peak trips will be 8.3 ((4.774*1.93 = 9.2) – 0.9)
|
|
|
Other/Miscellaneous
For your upcoming civil submittal (associated with this building permit), please include the following items:
Include a separate street light design.
Extend curb/gutter/sidewalk/roadway paving across entire project frontage ~200ft.
|
|
Planning Review
|
Approved
|
08/08/2022
|
08/12/2022
|
|
|
|
|
Building Review
|
Approved
|
08/08/2022
|
08/09/2022
|
|
|
|
|
Fire Review
|
Approved
|
08/08/2022
|
08/02/2022
|
|
|
|
|
Engineering Review
|
Approved
|
08/08/2022
|
08/02/2022
|
|
|
|
|
Building Review
|
Approved
|
07/15/2022
|
07/14/2022
|
|
|
|
|
Engineering Traffic Review
|
Failed
|
07/07/2022
|
07/08/2022
|
|
|
|
|
|
Other/Miscellaneous
Traffic Scoping Document:
The existing 2000sqft portable was part of temporary use permit P-20-0137. This building did not pay traffic impact fees and therefore will not receive credits when removed.
Recalculate trips using ITE LUC 180 “Specialty Trade Contractor”
Building area shall be 4,774 sqft (2,602 + 300 + 1,872)
PM peak trips will be 8.3 ((4.774*1.93 = 9.2) – 0.9)
|
|
|
Other/Miscellaneous
Park Impact fees:
For ML zoning, Park impact fees are required. This will be $0.87 per sqft.
4,774 sqft * 0.87 = $4,153.88
|
|
|
Other/Miscellaneous
For your upcoming civil submittal (associated with this building permit), please include the following items:
Include a separate street light design.
Extend curb/gutter/sidewalk/roadway paving across entire project frontage ~200ft.
|
|
Engineering Review
|
Approved
|
07/07/2022
|
06/21/2022
|
|
|
|
|
Planning Review
|
Approved
|
|
09/27/2021
|
|
|
|
|
Building Review
|
Approved
|
|
09/03/2021
|
|
|
|
|
Building Review
|
Incomplete
|
|
07/29/2021
|
|
|
|
|
Fire Review
|
Approved
|
|
06/15/2021
|
|
|
|
|
Fire Review
|
Incomplete
|
|
06/07/2021
|
|
|
|
|
Planning Review
|
Incomplete
|
|
05/13/2021
|
|
|
|
|
Building Review
|
Incomplete
|
|
05/11/2021
|
|
|
|