Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Paid Fees
Amount
Paid
Owing
Date Paid
Record Drawing Review Fee
$200.00
$200.00
Paid
03/18/2021
No
Civil Review Fee
$470.00
$470.00
Paid
03/18/2021
No
Civil Review Additional Fee
$720.00
$720.00
Paid
03/27/2024
Outstanding Fees
Amount
Paid
Owing
Date Paid
No outstanding fees.
Totals:
$1,390.00
$1,390.00
$0.00
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
There are no inspections for this engineering permit application, or you are not authorized to view them.
Condition
Status
Department
Category
Expiration Date
Due Date
Civil Standard Conditions
Open
Engineering Division
Standard Conditions
:
1. Construction permitted as per approved civil plans.
2. Construction permit shall expire by limitation and be declared void if:
* Work is not started within 180 days of obtaining the permit
* Work is abondoned for 180 days or more after beginning work
* After two years from the date of permit issuance, regardless of whether work is finished
3. Any changes to the scope of work approved on the civil plans shall be submitted on a Plan Change Request to the Engineering Services Staff for review.
4. Any changes that require a request to vary from the design standards approved on the civil plans shall be submitted on an Alternative Methods or Construction Materials Request along with a $250 application fee to the Engineering Services Staff for review.
5. The applicant is responsible to call the Utility Notification Center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
6. I hereby acknowledge that I have read and understand the contents of this permit and I hereby state that the information I have supplied is true and correct.
Indemnification / Hold Harmless
The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity.
However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Pipeline Notfication Rcw 19.122.033
Open
Engineering Division
Standard Conditions
:
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Certificate of Insurance/CG2012
Open
Engineering Division
Prior to Issuance
:
Certificate or Insurance/CG2012 must be received prior to issuance
Performance Bond
Open
Engineering Division
Prior to Issuance
:
A Performance Bond must be received by the City of Puyallup prior to permit issuance. The Performance Bond shall be 150% of the estimated cost of work in the ROW per the approved cost estimate received prior to plan approval (attached in CityView Portal under Documents & Images section). See https://www.cityofpuyallup.org/DocumentCenter/View/16622/Performance-Bond-51122-appvd-by-Legal for more information.
Miscellaneous Condition
Resolved
Engineering Division
Submit With Civil Permit Application
:
Certification by a soils testing laboratory that the organic content and CEC criteria of the native soils meets standards shall be submitted.
SEPA Determination Required
Resolved
Planning Division
Prior to Issuance
:
Permit scope subject to SEPA Environmental Review. Permit cannot be issued until associated SEPA Determination appeal period has expired without appeal. SEPA #PLSSP20220062
Miscellaneous Condition
Resolved
Engineering Division
Submit With Civil Permit Application
:
For any utilities underneath the porous pavement gallery trench dams shall be installed.
Miscellaneous Condition
Open
Engineering Division
Prior to Issuance
:
A Certified Erosion and Sediment Control Lead must be designated prior to permit issuance and start of work.
Miscellaneous Condition
Open
Development & Permitting Services
:
As the project area exceeds one acre a Construction Stormwater General Permit shall be applied for with the Department Of Ecology.
Ready to Issue - Need Contractor Info
Open
Development & Permitting Services
Prior to Issuance
:
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
Inadvertent Discovery Plan (IDP)
Open
Engineering Division
Prior to Issuance
:
Email a signed Inadvertent Discovery Plan to RBUCK@PUYALLUPWA.GOV.
Overtime Inspection and Watermain Shutdown Fee
Open
Engineering Division
Prior to Issuance
:
This form is to be received prior to permit issuance. Signing this form is acknowledgement that there may be billed overtime inspection fees per the current fee schedule and that whenever the City Water Division staff is required to perform a mainline shutdown the fees shall be billed at $134.00 per event plus $10.00 per tag. Instances when a shutdown is performed outside regular working hour’s additional overtime fees will be billed at the current overtime billing rate (3 hour minimum call out time).
Miscellaneous Condition
Open
Development & Permitting Services
Prior to Issuance
:
STORMWATER PERFORMANCE BOND REQ IN ADD TO ROW PERFORMANCE BOND [Robyn Buck @ 01/22/2024 1:47 PM]