CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20250103
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 07/01/2025 |
Exhaust Vent Fan (Bath) Fee | $28.20 | $28.20 | Paid | 07/01/2025 |
Building Permit Fee | $3,233.75 | $3,233.75 | Paid | 07/01/2025 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 07/01/2025 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 07/01/2025 |
Plumbing Fixtures Fee | $156.00 | $156.00 | Paid | 07/01/2025 |
Building Plan Review Fee | $2,101.94 | $2,101.94 | Paid | 01/21/2025 |
Mechanical Plan Review Fee | $44.33 | $44.33 | Paid | 01/21/2025 |
Plumbing Plan Review Fee | $127.40 | $127.40 | Paid | 01/21/2025 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 07/01/2025 |
Water System Development ChargeFee - Tenant Improvment/Addition | $1,083.69 | $1,083.69 | Paid | 07/01/2025 |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $3,074.26 | $3,074.26 | Paid | 07/01/2025 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 05/30/2025 |
Traffic Impact Fee (Commercial) | $37,350.00 | $37,350.00 | Paid | 07/01/2025 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $47,749.57 | $47,749.57 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Erosion And Sediment Inspection | Pending | |||
Comment Building Div Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Comment Engineering Div Inspection | Pending | |||
Footing/Setback Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Foundation/Rebar Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Slab/Insulation Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Block Wall Rebar Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Roof Sheathing Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Shear Wall Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Firewall/Firestop Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Plumbing Rough In Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Energy (Insulation) Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Frame Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Combination Frame And Rough In Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Ceiling Grid/T-Bar Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Wallboard / Drywall Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Exit Lighting Test Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Re-Roof Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Hydronic Piping Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Mechanical Rough In Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Refrigeration Line Test Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Exhaust Hood Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Light Test For Grease Duct Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Exhaust/Vent Fans Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Shower Pan Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Medical Gas Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Fire Or Smoke Damper Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | Pending | |||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Engineering Final Inspection | Pending | |||
Electric Vehicle Charging Inspection | Pending | |||
Planning Final Inspection | Pending | |||
Fire Final Inspection | Pending | |||
David Drake ((253) 864-4171) | ||||
Plumbing Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Mechanical Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Building Final Inspection | Pending | |||
Shannon King ((253) 840-6684) | ||||
Underfloor Inspection | Pending | 7/22/2025 | ||
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Outstanding
07/18/2025
1 ; complete toilet to be min. 16''-18'' max. from wall to center line of toilet as discussed with contractor. ( inspection for below slab plumbing rough-in )
|
||||
Underfloor Inspection | Failed | 7/18/2025 | 7/18/2025 | 07/18/2025 |
Shannon King ((253) 840-6684) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/18/2025
1 ; complete toilet to be min. 16''-18'' max. from wall to center line of toilet as discussed with contractor. ( inspection for below slab plumbing rough-in )
|
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Development & Permitting Services
PRFS20250323 - UPON T.I. ISSUANCE, FIRE SPRINKLER PERMIT WILL NEED TO BE ISSUED AS WELL
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Engineering Division
This permit must be issued prior to the corresponding civil permit being issued. Generally we require the opposite, but this building has already been constructed and it is necessary to resolve outstanding issues with this permit beore allowing the civil construction to take place. [Jamie Carter @ 04/09/2025 1:23 PM]
|
||
Plumbing FUW Utility Service Credit | Open | Standard Conditions |
Engineering Division
11 existing water FUWs. 7 new water FUWs. Total 18 FUWs. Accounting for the first 15 FUWs, only 3 water FUWs were assessed on PRCTI20250103.
12 existing sewer FUWs. 10 new sewer FUWs. Total 22 FUWs. Accounting for the first 15 FUWs, only 7 sewer FUWs were assessed on PRCTI20250103.
|
||
Right-of-Way (ROW) Dedication | Resolved | Prior to Completion |
Engineering Division
Right-of-way dedication to match the abutting street classification shall be required as determined by Development Engineering. No building permit or development permit shall be granted for the construction or substantial improvement of any industrial, commercial, or residential building, or plat unless the plans and specifications contain provisions for the dedication to the City of sufficient street right of way for the classification of the street abutting the property according to the street plans and street development needs of the city for that street. In accordance with Puyallup Municipal Code Chapter 11.08.120, the subject site property owner shall dedicate approximately 6’ of right-of-way to match the 66’ street classification of INTER AVE. Please fill out the attached REETA template form and the Right of Way Dedication Deed form. The Deed form must include a legal description and be accompanied by an exhibit (survey completed by licensed surveyor) depicting the right-of-way dedication. Once drafted, please return these documents to me to review with the Engineering Support Specialist and City Engineer. If accepted, the City Engineer will sign the Deed so that it can be recorded with Pierce County. Alternatively, the ROW dedication may be conveyed under another legal instrument like a lot combination permit.
As seen in attached email, ROW dedication not required by Traffic or Civil engineer. [Yianni Charitou @ 04/10/2025 2:16 PM]
|
||
Frontage Improvements - Non-Residential Tenant Improvements | Resolved | Prior to Issuance |
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, non-residential tenant improvement projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) and when the remodel valuation exceeds $500,000 are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and civil construction permit PRCCP20250096 has been issued. The building permit shall be conditioned in such a manner that building occupancy will not be granted until the frontage improvements are completed and approved.
This condition has been resolved per condition #4 written by Jamie Carter, Civil Engineer. The TI must be issued prior to civil permit issuance, but frontage improvements are still required prior to occupancy. [Yianni Charitou @ 05/06/2025 7:57 AM]
|
||
Frontage Improvements - Non-Residential Tenant Improvements | Open | Prior to Completion |
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, non-residential tenant improvement projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) and when the remodel valuation exceeds $500,000 are required to complete improvements along the property's street frontage. The building occupancy shall not be granted until the frontage improvements are completed and the final inspection of PRCCP20250096 is passed.
|
||
Fire Sprinkler Protection System Water Service and Backflow Protection Device | Open | Prior to Completion |
Engineering Division
A minimum 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal.
Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Engineering Division
Puyallup Municipal Code Chapter 19.06.020 provides specific and mandatory circumstances under which contiguous parcels must be combined as a condition of development plan approval. These include situations where an existing or proposed structure extends over a property line, where contiguous parcels share common facilities without existing easements or legal instruments, or where parcels need a boundary line adjustment or lot combination to meet city development requirements. According to the submitted development plans, contiguous parcels share such common facilities and a recorded lot combination or plat is required. Prior to building permit issuance, the applicant shall apply for and provide a recorded legal instrument, of which the City must review and approve prior to recording, for the continuous ownership, use, and maintenance of the common facilities on tax parcels 2105200191, 2105200192 and 2105200180.
|
||
Miscellaneous Condition | Open | Standard Conditions |
Traffic Division
The city has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip.
Trips calculated using ITE LUC 180 “Specialty Trade Contractor”
Building area calculated for TIF is 4,774 sqft (2,602 + 300 + 1,872)
PM peak trips will be 8.3 (4.774*1.93 = 9.2) – (0.9, credit for single family home) * $4500 = $37,350 traffic impact fee
|
||
Miscellaneous Condition | Open | Standard Conditions |
Traffic Division
Park Impact fees:
For ML zoning, Park impact fees are required. This will be $0.87 per sqft.
4,774 sqft * 0.87 = $4,153.88
|
||
Backflow Protection Device - Commercial RPBA | Open | Prior to Completion |
Engineering Division
An approved reduced pressure backflow assembly (RPBA) device is required to be installed on the commercial water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
Miscellaneous Condition | Resolved | Prior to Completion |
Planning Division
Temporary building identified as 'job trailer' on site plan was approved via a temporary use permit (Permit #P-20-0137). Temporary use permit expired 180 days after occupancy of office at 2505 INTER AVE, which was now over 2 years ago. "job trailer' shall be removed from the site prior to occupancy of the warehouse building.
|
||
Ready to Issue - Need Business License Endorsement | Resolved | Prior to Issuance |
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
Reference Number | Status | Type |
---|---|---|
B-21-0029 | Closed | Change of Use |
E-21-0071 | Canceled | Civil Construction Permit |
B-21-0263 | Canceled | Commercial - Tenant Improvement/Remodel |
PRCCP20250096 | Permit(s) Issued | Civil Construction Permit |
PRFS20250323 | Permit(s) Issued | Fire Sprinklers |
P-20-0050 | Expired | Pre-Application |
P-20-0137 | File Closed | Temporary Use |
PLSSP20220062 | File Closed | SEPA Standalone |
PLLC20250043 | File Closed | Lot Combination |
Date Uploaded | File Type | Name |
---|---|---|
01/21/2025 | Other | TRAFFIC SCOPING WORKSHEET - Current |
01/21/2025 | Receipt | Receipt for transaction:2025-000138 |
05/30/2025 | Receipt | Receipt for transaction:2025-001028 |
07/01/2025 | Plans | CONSTRUCTION PLAN SET - RESUB (Stamped) |
07/01/2025 | Form | LIGHTING COMPLIANCE (Stamped) |
07/01/2025 | Form | ENVELOPE COMPLIANCE (Stamped) |
07/01/2025 | Form | MECHANICAL COMPLIANCE (Stamped) |
07/01/2025 | Form | WSEC - LIGHTING (Stamped) |
07/01/2025 | Form | WSEC - MECHANICAL (Stamped) |
07/01/2025 | Form | WSEC - ENVELOPE (Stamped) |
07/01/2025 | Report | STRUCT CALCS (Stamped) |
07/01/2025 | Form | PLUMB FIXTURE WORKSHEET (Stamped) |
07/01/2025 | Receipt | Receipt for transaction:2025-001305 |
07/02/2025 | Permit | Permit - Detailed |
07/02/2025 | Letter | Permit Job Card |
07/18/2025 | Report | Inspection Report (Underfloor Inspection) |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.