CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20250103
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 07/01/2025 |
| Exhaust Vent Fan (Bath) Fee | $28.20 | $28.20 | Paid | 07/01/2025 |
| Building Permit Fee | $3,233.75 | $3,233.75 | Paid | 07/01/2025 |
| Mechanical Permit Fee | $40.00 | $40.00 | Paid | 07/01/2025 |
| Plumbing Permit Fee | $40.00 | $40.00 | Paid | 07/01/2025 |
| Plumbing Fixtures Fee | $156.00 | $156.00 | Paid | 07/01/2025 |
| Building Plan Review Fee | $2,101.94 | $2,101.94 | Paid | 01/21/2025 |
| Mechanical Plan Review Fee | $44.33 | $44.33 | Paid | 01/21/2025 |
| Plumbing Plan Review Fee | $127.40 | $127.40 | Paid | 01/21/2025 |
| WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 07/01/2025 |
| Water System Development Charge Fee - Tenant Improvment/Addition | $1,083.69 | $1,083.69 | Paid | 07/01/2025 |
| Sewer System Development Charge Fee - Tenant Improvment/Addition | $3,074.26 | $3,074.26 | Paid | 07/01/2025 |
| Resubmittal/Revision Fee | $180.00 | $180.00 | Paid | 05/30/2025 |
| Traffic Impact Fee (Commercial) | $37,350.00 | $37,350.00 | Paid | 07/01/2025 |
| Park Impact Fee (Manufacturing) | $4,153.88 | $4,153.88 | Paid | 10/24/2025 |
|
$0.00
|
||||
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $51,903.45 | $51,903.45 | $0.00 | |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Underfloor Inspection | Failed | 7/18/2025 | 7/18/2025 | 07/18/2025 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
07/18/2025
1 ; complete toilet to be min. 16''-18'' max. from wall to center line of toilet as discussed with contractor. ( inspection for below slab plumbing rough-in )
|
||||
| Underfloor Inspection | Partial Pass | 7/22/2025 | 7/22/2025 | 07/22/2025 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
07/22/2025
1 ; complete toilet to be min. 16''-18'' max. from wall to center line of toilet as discussed with contractor. ( inspection for below slab plumbing rough-in )
|
||||
| Foundation/Rebar Inspection | Partial Pass | 7/31/2025 | 7/31/2025 | 07/31/2025 |
| Shannon King ((253) 840-6684) | ||||
| Combination Frame And Rough In Inspection | Not Ready | 8/15/2025 | 8/15/2025 | 08/15/2025 |
| Monty Johnson ((253) 770-3326) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
08/15/2025
1:provide test on plumbing
2:complete firestop/poly seal
3:complete mech
4:provide ok to drill holes in paralam
not ready , did not open plans
|
||||
| Comment Building Div Inspection | Partial Pass | 8/19/2025 | 8/19/2025 | 08/19/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Combination Frame And Rough In Inspection | Failed | 8/21/2025 | 8/21/2025 | 08/21/2025 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
08/21/2025
1 ; provide electrical cover approval.
2 ; complete install of t.p.r. valve drain to an approved location as discussed with contractor.
3 ; test failed on d.w.v. at time of inspection. (fix leak & retest prior to next inspection)
4 ; complete anchor bolts and galvanized plate washers at load bearing walls.
5 ; complete straps at top plate breaks at headers and posts.
|
||||
| Mechanical Rough In Inspection | VOID | 8/28/2025 | 8/28/2025 | 08/28/2025 |
| Monty Johnson ((253) 770-3326) | ||||
| Firewall/Firestop Inspection | Partial Pass | 8/28/2025 | 8/28/2025 | 08/28/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Energy (Insulation) Inspection | Passed | 8/28/2025 | 8/28/2025 | 08/28/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Wallboard / Drywall Inspection | Passed | 8/28/2025 | 8/28/2025 | 08/28/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Combination Frame And Rough In Inspection | Passed | 8/28/2025 | 8/28/2025 | 08/28/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
08/21/2025
1 ; provide electrical cover approval.
2 ; complete install of t.p.r. valve drain to an approved location as discussed with contractor.
3 ; test failed on d.w.v. at time of inspection. (fix leak & retest prior to next inspection)
4 ; complete anchor bolts and galvanized plate washers at load bearing walls.
5 ; complete straps at top plate breaks at headers and posts.
|
||||
| Firewall/Firestop Inspection | Partial Pass | 9/2/2025 | 9/2/2025 | 09/02/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/02/2025
1.Provide two layers of sheetrock at bottom of windowsill and one more layer at side and top of windowsill
2. Provide fire damper at second floor bathroom exhaust fan.
|
||||
| Erosion And Sediment Inspection | Passed | 09/24/2025 | ||
| Michael Rosenau ((253) 344-6753) | ||||
| Plumbing Final Inspection | Not Ready | 9/29/2025 | 9/29/2025 | 09/29/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/29/2025
1. Move urinal to 15" off toilet wall and partition.
2. Provide toilet trip levers to open side of restroom per ADA requirements.
|
||||
| Exhaust/Vent Fans Inspection | Failed | 9/29/2025 | 9/29/2025 | 09/29/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
09/29/2025
1. Provide installation instructions for damper installation.
|
||||
| Mechanical Final Inspection | Not Ready | 10/1/2025 | 10/1/2025 | 10/01/2025 |
| Shannon King ((253) 840-6684) | ||||
| Fire Final Inspection | Not Ready | 10/1/2025 | 10/01/2025 | |
| David Drake ((253) 864-4171) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/01/2025
1. Provide CO/NO system per the approved building plans. Must meet the current 2021 IBC, IMC, IFC requirements. This will be required to be tested with the correct gases.
2. Provide correct building address at house for complex. 2511
3. Install lock on PIV. Key must be put in the KNOX Box.
4. KNOX Box required. Contact ddrake@puyallupwa.gov for instructions and ordering.
5. Emergency Lighting /egress testing required.
6. Provide fire extinguishers per code.
|
||||
| Exit Lighting Test Inspection | Passed | 10/7/2025 | 10/07/2025 | |
| David Drake ((253) 864-4171) | ||||
| Plumbing Final Inspection | Not Ready | 10/7/2025 | 10/7/2025 | 10/07/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/07/2025
1. Move urinal to 15" off toilet wall and partition.
2. Provide toilet trip levers to open side of restroom per ADA requirements.
|
||||
| Hydrostatic Test 200Lbs 2Hrs | VOID | 10/08/2025 | ||
| David Drake ((253) 864-4171) | ||||
| Emergency Radio Test Review Inspection | VOID | 10/08/2025 | ||
| David Drake ((253) 864-4171) | ||||
| Fire Final Inspection | Not Ready | 10/7/2025 | 10/7/2025 | 10/08/2025 |
| David Drake ((253) 864-4171) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/08/2025
1. Provide CO/NO system per the approved building plans. Must meet the current 2021 IBC, IMC, IFC requirements. This will be required to be tested with the correct gases.
2. Provide correct building address at house for complex. 2511
3. Install lock on PIV. Key must be put in the KNOX Box.
4. KNOX Box required. Contact ddrake@puyallupwa.gov for instructions and ordering.
5. Emergency Lighting /egress testing required.
6. Provide fire extinguishers per code.
|
||||
| Plumbing Final Inspection | Not Ready | 10/20/2025 | 10/20/2025 | 10/20/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/20/2025
1. Move urinal to 15" off toilet wall and partition.
2. Provide toilet trip levers to open side of restroom per ADA requirements.
|
||||
| Comment Engineering Div Inspection | Passed | 10/21/2025 | 10/21/2025 | |
| Michael Rosenau ((253) 344-6753) | ||||
| Engineering Final Inspection | Passed | 10/21/2025 | 10/21/2025 | |
| Michael Rosenau ((253) 344-6753) | ||||
| Planning Final Inspection | Passed | 10/22/2025 | 10/21/2025 | |
| Rachael N. Brown ((253) 770-3363) | ||||
| Plumbing Final Inspection | Passed | 10/27/2025 | 10/27/2025 | 10/27/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
10/27/2025
1. Move urinal to 15" off toilet wall and partition.
2. Provide toilet trip levers to open side of restroom per ADA requirements.
|
||||
| Mechanical Final Inspection | Partial Pass | 10/27/2025 | 10/27/2025 | 10/27/2025 |
| James LaVergne ((253) 841-5590) | ||||
| Exhaust/Vent Fans Inspection | Partial Pass | 10/27/2025 | 10/27/2025 | 10/27/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
10/27/2025
1. Provide installation instructions for damper installation.
|
||||
| Building Final Inspection | Not Ready | 10/7/2025 | 10/27/2025 | 10/27/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/27/2025
1. Fire final scheduled for 10-27-25 at 3 pm.
2. Paint accessible rout from city sidewalk to entry gate.
3. Provide 44" clearance at front railing accessible path.
4. Provide accessible ADA handle and latch on gate or remove gate.
5. Install new door hardware at Wherehouse shop exit door.
|
||||
| Building Final Inspection | Not Ready | 10/29/2025 | 10/29/2025 | 10/29/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
10/29/2025
1. Fire final scheduled for 10-27-25 at 3 pm.
2. Paint accessible rout from city sidewalk to entry gate.
3. Provide 44" clearance at front railing accessible path.
4. Provide accessible ADA handle and latch on gate or remove gate.
5. Install new door hardware at Wherehouse shop exit door.
|
||||
| Fire Or Smoke Damper Inspection | Passed | 10/27/2025 | 10/29/2025 | |
| David Drake ((253) 864-4171) | ||||
| Fire Final Inspection | Passed | 10/27/2025 | 10/27/2025 | 10/29/2025 |
| David Drake ((253) 864-4171) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
10/29/2025
1. Provide CO/NO system per the approved building plans. Must meet the current 2021 IBC, IMC, IFC requirements. This will be required to be tested with the correct gases.
2. Provide correct building address at house for complex. 2511
3. Install lock on PIV. Key must be put in the KNOX Box.
4. KNOX Box required. Contact ddrake@puyallupwa.gov for instructions and ordering.
5. Emergency Lighting /egress testing required.
6. Provide fire extinguishers per code.
|
||||
| Building Final Inspection | Partial Pass | 10/31/2025 | 10/31/2025 | 10/31/2025 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
10/31/2025
1. Fire final scheduled for 10-27-25 at 3 pm.
2. Paint accessible rout from city sidewalk to entry gate.
3. Provide 44" clearance at front railing accessible path.
4. Provide accessible ADA handle and latch on gate or remove gate.
5. Install new door hardware at Wherehouse shop exit door.
|
||||
| Building Final Inspection | Passed | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Footing/Setback Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Slab/Insulation Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Block Wall Rebar Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Roof Sheathing Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Shear Wall Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Plumbing Rough In Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Frame Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Ceiling Grid/T-Bar Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Re-Roof Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Hydronic Piping Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Refrigeration Line Test Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Exhaust Hood Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Light Test For Grease Duct Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Shower Pan Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Medical Gas Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Electric Vehicle Charging Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Underfloor Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Foundation/Rebar Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Comment Building Div Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Firewall/Firestop Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
09/02/2025
1.Provide two layers of sheetrock at bottom of windowsill and one more layer at side and top of windowsill
2. Provide fire damper at second floor bathroom exhaust fan.
|
||||
| Mechanical Final Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Exhaust/Vent Fans Inspection | VOID | 10/31/2025 | ||
| Ray Cockerham ((253) 841-5585) | ||||
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Fire Review Conditions | Open | Standard Conditions |
|
• Comply with 2021 IFC and 2021 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• Fire extinguishers required per code to be installed at time of Fire Final
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• CO/NO exhaust monitoring system required. See Building plans.
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Development & Permitting Services
PRFS20250323 - UPON T.I. ISSUANCE, FIRE SPRINKLER PERMIT WILL NEED TO BE ISSUED AS WELL
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Engineering Division
This permit must be issued prior to the corresponding civil permit being issued. Generally we require the opposite, but this building has already been constructed and it is necessary to resolve outstanding issues with this permit beore allowing the civil construction to take place. [Jamie Carter @ 04/09/2025 1:23 PM]
|
||
| Plumbing FUW Utility Service Credit | Open | Standard Conditions |
|
Engineering Division
11 existing water FUWs. 7 new water FUWs. Total 18 FUWs. Accounting for the first 15 FUWs, only 3 water FUWs were assessed on PRCTI20250103.
12 existing sewer FUWs. 10 new sewer FUWs. Total 22 FUWs. Accounting for the first 15 FUWs, only 7 sewer FUWs were assessed on PRCTI20250103.
|
||
| Right-of-Way (ROW) Dedication | Resolved | Prior to Completion |
|
Engineering Division
Right-of-way dedication to match the abutting street classification shall be required as determined by Development Engineering. No building permit or development permit shall be granted for the construction or substantial improvement of any industrial, commercial, or residential building, or plat unless the plans and specifications contain provisions for the dedication to the City of sufficient street right of way for the classification of the street abutting the property according to the street plans and street development needs of the city for that street. In accordance with Puyallup Municipal Code Chapter 11.08.120, the subject site property owner shall dedicate approximately 6’ of right-of-way to match the 66’ street classification of INTER AVE. Please fill out the attached REETA template form and the Right of Way Dedication Deed form. The Deed form must include a legal description and be accompanied by an exhibit (survey completed by licensed surveyor) depicting the right-of-way dedication. Once drafted, please return these documents to me to review with the Engineering Support Specialist and City Engineer. If accepted, the City Engineer will sign the Deed so that it can be recorded with Pierce County. Alternatively, the ROW dedication may be conveyed under another legal instrument like a lot combination permit.
As seen in attached email, ROW dedication not required by Traffic or Civil engineer. [Yianni Charitou @ 04/10/2025 2:16 PM]
|
||
| Frontage Improvements - Non-Residential Tenant Improvements | Resolved | Prior to Issuance |
|
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, non-residential tenant improvement projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) and when the remodel valuation exceeds $500,000 are required to complete improvements along the property's street frontage. Your project will be required to complete frontage improvements which may include curb, gutter, planter strips, street trees, sidewalks, storm drainage, street lighting, and one-half street paving (only required if the existing pavement condition is poor) as determined by Development Engineering. The building permit shall not be issued until the frontage improvement designs have been approved by the City and civil construction permit PRCCP20250096 has been issued. The building permit shall be conditioned in such a manner that building occupancy will not be granted until the frontage improvements are completed and approved.
This condition has been resolved per condition #4 written by Jamie Carter, Civil Engineer. The TI must be issued prior to civil permit issuance, but frontage improvements are still required prior to occupancy. [Yianni Charitou @ 05/06/2025 7:57 AM]
|
||
| Frontage Improvements - Non-Residential Tenant Improvements | Resolved | Prior to Completion |
|
Engineering Division
In accordance with Puyallup Municipal Code 11.08.135, non-residential tenant improvement projects that qualify as substantial improvements (the cost of which equals or exceeds 50% of the market value of the structure before the “start of construction” of the improvement) and when the remodel valuation exceeds $500,000 are required to complete improvements along the property's street frontage. The building occupancy shall not be granted until the frontage improvements are completed and the final inspection of PRCCP20250096 is passed.
|
||
| Fire Sprinkler Protection System Water Service and Backflow Protection Device | Resolved | Prior to Completion |
|
Engineering Division
A minimum 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal.
Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
| Miscellaneous Condition | Resolved | Prior to Issuance |
|
Engineering Division
Puyallup Municipal Code Chapter 19.06.020 provides specific and mandatory circumstances under which contiguous parcels must be combined as a condition of development plan approval. These include situations where an existing or proposed structure extends over a property line, where contiguous parcels share common facilities without existing easements or legal instruments, or where parcels need a boundary line adjustment or lot combination to meet city development requirements. According to the submitted development plans, contiguous parcels share such common facilities and a recorded lot combination or plat is required. Prior to building permit issuance, the applicant shall apply for and provide a recorded legal instrument, of which the City must review and approve prior to recording, for the continuous ownership, use, and maintenance of the common facilities on tax parcels 2105200191, 2105200192 and 2105200180.
|
||
| Miscellaneous Condition | Resolved | Standard Conditions |
|
Traffic Division
The city has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip.
Trips calculated using ITE LUC 180 “Specialty Trade Contractor”
Building area calculated for TIF is 4,774 sqft (2,602 + 300 + 1,872)
PM peak trips will be 8.3 (4.774*1.93 = 9.2) – (0.9, credit for single family home) * $4500 = $37,350 traffic impact fee
|
||
| Miscellaneous Condition | Open | Standard Conditions |
|
Traffic Division
Park Impact fees:
For ML zoning, Park impact fees are required. This will be $0.87 per sqft.
4,774 sqft * 0.87 = $4,153.88
|
||
| Backflow Protection Device - Commercial RPBA | Resolved | Prior to Completion |
|
Engineering Division
An approved reduced pressure backflow assembly (RPBA) device is required to be installed on the commercial water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection.
Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
|
||
| Miscellaneous Condition | Resolved | Prior to Completion |
|
Planning Division
Temporary building identified as 'job trailer' on site plan was approved via a temporary use permit (Permit #P-20-0137). Temporary use permit expired 180 days after occupancy of office at 2505 INTER AVE, which was now over 2 years ago. "job trailer' shall be removed from the site prior to occupancy of the warehouse building.
|
||
| Ready to Issue - Need Business License Endorsement | Resolved | Prior to Issuance |
|
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue.
|
||
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView