Summary

B-21-0070
Residential - Addition
Closed
STROBL JEFFRE W & WONG
Addition
2ND FLOOR ADDITION TO EXISTING HOME
01/28/2021
02/18/2022
12/24/2023
06/27/2023

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 10/20/2021
Building Review Incomplete 10/20/2021
Planning Review In Progress 10/15/2021
Building Review Approved 09/24/2021
Building Review Incomplete 05/03/2021
Building Review Incomplete 04/19/2021
Building Review Incomplete 04/14/2021
Planning Review Approved 03/11/2021
Fire Review Approved 02/25/2021
Engineering Review Approved 02/24/2021

Fees

Paid Fees Amount Paid Owing Date Paid
Furnace (up to 100,000 BTU) Fee $19.55 $19.55 Paid 02/18/2022
Unclassified Appliance or Equipment Fee $14.10 $14.10 Paid 02/18/2022
Exhaust Vent Fan (Bath) Fee $42.30 $42.30 Paid 02/18/2022
Building Permit Fee $1,340.95 $1,340.95 Paid 02/18/2022
Mechanical Permit Fee $40.00 $40.00 Paid 02/18/2022
Water Heater Fee $13.00 $13.00 Paid 02/18/2022
Plumbing Permit Fee $40.00 $40.00 Paid 02/18/2022
Plumbing Fixtures Fee $182.00 $182.00 Paid 02/18/2022
Building Plan Review Fee $871.62 $871.62 Paid 02/18/2022
Planning Review Fee $30.00 $30.00 Paid 02/18/2022
Mechanical Plan Review Fee $75.37 $75.37 Paid 02/18/2022
WA State Building Code Council Fee (Residential) $6.50 $6.50 Paid 02/18/2022
Building Division Fee (Hourly) $520.00 $520.00 Paid 02/18/2022
Plumbing Plan Review Fee $152.75 $152.75 Paid 02/18/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Not Ready 2/28/2022 2/28/2022 02/28/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
02/28/2022
1:talked about requirments for second story construction

Underfloor Inspection Partial Pass 7/1/2022 7/1/2022 07/01/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/01/2022
talked about framing requirments

Shear Wall Inspection Failed 7/18/2022 7/18/2022 07/18/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
07/18/2022
1:provide engineers as built approval or fix for new and existing shear panels not breaking on plates or blocking also for cork board behind all t-1-11 and for dbl 2x plates in lieu of 3x new plates at shear walls. 2:complete all edge nailing.

Energy (Insulation) Inspection Partial Pass 10/3/2022 10/3/2022 10/03/2022
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Failed 10/10/2022 10/10/2022 10/10/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
10/10/2022
1:fill dwv to top 2:provide city pressure on both hot and cold water lines 3:call in gas pipe when ready.

Frame Inspection Failed 11/3/2022 11/3/2022 11/03/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
11/03/2022
1:complete all polyseal at plates 2:install nail plates where needed 3:install insulation baffles 4:install combustion air to ext at on demand wh. 5:install exhaust fan ducts 6: attach top plates of shearwalls upstairs as discussed.

Comment Engineering Div Inspection VOID 03/30/2023
Jeff Hill ((253) 841-5424)
Residential Final Inspection Failed 5/4/2023 5/4/2023 05/04/2023
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
05/04/2023
1:provide address at street 2:provide carbon mono in downstairs hallway 3:complete sheetrock in garage 4:provide insulation and gasket at attic lid 5:insulate hot water lines at water heater

Footing/Setback Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Foundation/Rebar Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Slab/Insulation Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Combination Frame And Rough In Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Carbon Monoxide Detectors Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Shower Pan Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Fire Sprinkler Cover Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Fire Sprinkler Final Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Fire Final Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Plumbing Final Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Mechanical Final Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Comment Building Div Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Comment Building Div Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)
Underfloor Inspection VOID 06/27/2023
Kevin Spruell ((253) 841-5590)

Conditions

Condition Status Department Category Expiration Date Due Date
General Permit Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy. * Work shall not proceed until the inspector has approved the stages of construction. * Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties. * I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. * TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
Building Permit Standard Conditions Open Development & Permitting Services Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Residential Standard Conditions Resolved Engineering Division Standard Conditions
: * DUE TO THE PROXIMITY OF THIS PROPERTY TO A SECONDARY WATER SOURCE, CLARKS CREEK, THE APPLICANT SHALL INSTALL A REDUCED PRESSURE BACKFLOW ASSEMBLY PER CITY STANDARDS. * Per the FEMA Letter of Map Amendment (LOMA) dated June 17, 2020, the existing structures have been determined to be outside of the Special Flood Hazard Area (SFHA). *** Roof downspout control is required. Refer to the attached standard details 02.05.01 & 02.05.03 for typical control methods. * ANY ADDITION/EXPANSION TO THE FOOTPRINT OF THE BUILDING INCLUDING DECKS AND PORCHES NOT ORIGINALLY SHOWN ON THE APPROVED SET OF PLANS MUST OBTAIN PROPER PERMITS PRIOR TO CONSTRUCTION. * THE APPLICANT IS RESPONSIBLE TO CALL THE UTILITY NOTIFICATION CENTER AT 1-800-424-5555 BEFORE BEGINNING ANY EXCAVATION. CALL BEFORE YOU DIG, IT'S THE LAW. * ANY CODE REQUIREMENT THAT MAY HAVE BEEN OVERLOOKED IN THIS PLAN REVIEW DOES NOT IMPLY THAT THE REQUIREMENTS HAVE BEEN WAIVED.
Miscellaneous Condition Open Development & Permitting Services Prior to Issuance
: NEED TO PROVIDE CONTRACTOR INFO - CONTRACTOR MUST BE REGISTERED WITH WA STATE L&I AND HAVE A VALID CITY OF PUYALLUP BUSINESS LICENSE ENDORCEMENT WITH WA STATE DEPT OF REVENUE
Pipeline Notfication Rcw 19.122.033 Resolved Engineering Division Standard Conditions
: Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
Mechanical and Plumbing OTC Conditions Open Building Division Standard Conditions
: REQUIRED INSPECTIONS INSPECTION INSPECTION Code Code 1010 EROSION & CONTROL 2110 FOOTING/SETBACK 9000 PLANNING FINAL BUILDING PERMIT 2115 FOUNDATION/REBAR 6205 SIDESEWER 2120 UNDERFLOOR 6405 STORM 2125 SLAB/INSULATION 6605 WATER 2210 ROOF SHEATHING 6670 FRONTAGE/DRIVEWAY 2215 SHEARWALL 9100 ENGINEERING FINAL BUILDING PERMIT 2230 ENERGY INSPECTION 9900 FINAL RESIDENTIAL 2235 FRAME 2240 COMBINATION FRAME & ROUGH IN 2925 COMMENT This is a general list, other inspections may be requried.