CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20220498
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 08/01/2022 |
Air Handling Unit (Up to 10,000 cfm) Fee | $84.60 | $84.60 | Paid | 08/01/2022 |
Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee | $38.80 | $38.80 | Paid | 08/01/2022 |
Building Permit Fee | $3,523.50 | $3,523.50 | Paid | 08/01/2022 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 08/01/2022 |
Plumbing Fixtures Fee | $26.00 | $26.00 | Paid | 08/01/2022 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 08/01/2022 |
Building Plan Review Fee | $2,290.28 | $2,290.28 | Paid | 03/22/2022 |
Mechanical Plan Review Fee | $106.21 | $106.21 | Paid | 08/01/2022 |
Plumbing Plan Review Fee | $42.90 | $42.90 | Paid | 08/01/2022 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 08/01/2022 |
Sewer System Development ChargeFee - Tenant Improvment/Addition | $789.26 | $789.26 | Paid | 08/01/2022 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 05/09/2022 |
Building Re-Inspection Fee | $130.00 | $130.00 | Paid | 10/12/2022 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $7,531.55 | $7,531.55 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Frame Inspection | Failed | 9/28/2022 | 9/28/2022 | 09/28/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
09/28/2022
1:complete rough ins and electrical approval
|
||||
Combination Frame And Rough In Inspection | Failed | 10/3/2022 | 10/3/2022 | 10/03/2022 |
Shannon King ((253) 840-6684) | ||||
Other/Miscellaneous
Carried Forward
10/03/2022
1. complete all R/I prior to next inspection
2. provide electrical cover inspection prior to next inspection
3. have all plumbing on test at time of next inspection
4. NOT READY
|
||||
Combination Frame And Rough In Inspection | Failed with Fee | 10/5/2022 | 10/5/2022 | 10/05/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
10/05/2022
1. complete all R/I prior to next inspection
2. provide electrical cover inspection prior to next inspection
3. have all plumbing on test at time of next inspection
4. NOT READY
|
||||
Other/Miscellaneous
Carried Forward
10/05/2022
1:complete joist blocking under walls above as per plan
2:complete wall x bracing as per plan
3:frame stairs as per plan (4x16 stringers with bearing walls below)
|
||||
Shear Wall Inspection | Partial Pass | 10/13/2022 | 10/13/2022 | 10/13/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
10/13/2022
progressing with special inspections
|
||||
Combination Frame And Rough In Inspection | Partial Pass | 10/13/2022 | 10/13/2022 | 10/13/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
10/13/2022
1. complete all R/I prior to next inspection
2. provide electrical cover inspection prior to next inspection
3. have all plumbing on test at time of next inspection
4. NOT READY
|
||||
Other/Miscellaneous
Carried Forward
10/13/2022
provide rfi for stair stringers
provide clarification on blocking joist above strap.
provide detail/rfi for top of wall bracing where not at 45deg and where unable to alternate.
|
||||
Wallboard / Drywall Inspection | Failed | 10/19/2022 | 10/19/2022 | 10/19/2022 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Carried Forward
10/19/2022
1. complete drywall nailing as discussed with contractor
2. complete corrections from previous inspection as discussed with contractor
3. provide documentation on site as discussed with contractor for RFI
|
||||
Ceiling Grid/T-Bar Inspection | Failed | 11/8/2022 | 11/8/2022 | 11/08/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
11/08/2022
complete rivets and perimeter wires upstairs, not ready
|
||||
Other/Miscellaneous
Carried Forward
11/08/2022
complete rivets and perimeter wires upstairs, not ready
|
||||
Mechanical Rough In Inspection | Partial Pass | 11/8/2022 | 11/8/2022 | 11/08/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
11/08/2022
provide install instructions at final for condensing units showing auto shut off switch and condensate line or install drain pans.
|
||||
Ceiling Grid/T-Bar Inspection | Failed | 11/9/2022 | 11/9/2022 | 11/09/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
11/09/2022
1:see inspection dated 11/8/22
|
||||
Plumbing Final Inspection | Failed | 11/15/2022 | 11/15/2022 | 11/15/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
11/15/2022
1:provide boots under sink on level 1
|
||||
Building Final Inspection | Failed | 11/15/2022 | 11/15/2022 | 11/15/2022 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
11/15/2022
1:provide fire final
2:provide accessibility survey from architect as per page G101
3:complete stair cladding
4:complete exit signs on level 1
|
||||
Fire Or Smoke Damper Inspection | VOID | 11/15/2022 | ||
David Drake ((253) 864-4171) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 11/15/2022 | ||
David Drake ((253) 864-4171) | ||||
Emergency Radio Test Review Inspection | VOID | 11/15/2022 | ||
David Drake ((253) 864-4171) | ||||
Comment Building Div Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Comment Engineering Div Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Footing/Setback Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Foundation/Rebar Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Slab/Insulation Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Roof Sheathing Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Firewall/Firestop Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Plumbing Below Slab Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Plumbing Rough In Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Energy (Insulation) Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Hydronic Piping Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Gas Test Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Exhaust Hood Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Light Test For Grease Duct Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Exhaust/Vent Fans Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Medical Gas Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Cover Inspection/Thrust Blocks Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Engineering Final Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Frame Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Shear Wall Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Combination Frame And Rough In Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Outstanding
10/13/2022
1. complete all R/I prior to next inspection
2. provide electrical cover inspection prior to next inspection
3. have all plumbing on test at time of next inspection
4. NOT READY
|
||||
Mechanical Rough In Inspection | VOID | 11/21/2022 | ||
Monty Johnson ((253) 770-3326) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions | |||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Standard Conditions | |||
:
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• Fire extinguishers required per code
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
|||||
Engineering Commercial Standard Conditions | Open | Development & Permitting Services | Standard Conditions | ||
:
* Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
* Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
Reference Number | Status | Type |
---|---|---|
PRFS20221197 | Closed | Fire Sprinklers |
PRFA20221350 | Closed | Fire Alarms |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView