Summary

PRCTI20220498
Commercial - Tenant Improvement/Remodel
Closed
COSTCO WHOLESALE CORP
Alteration/Remodel
801 SF Mezzanine Locker Room Addition, Ground Floor Remodel
03/14/2022
08/01/2022
05/20/2023
11/18/2022

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 05/20/2022 05/18/2022
Engineering Review Approved 05/20/2022 05/17/2022
Fire Review Approved 05/20/2022 05/16/2022
Planning Review VOID 05/20/2022 05/16/2022
Planning Review VOID 04/19/2022 04/29/2022
Engineering Review Approved 04/19/2022 04/20/2022
Building Review Failed 04/19/2022 04/15/2022
Fire Review Approved 04/19/2022 04/07/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 08/01/2022
Air Handling Unit (Up to 10,000 cfm) Fee $84.60 $84.60 Paid 08/01/2022
Boilers & Compressors/Heat Pump (up to 100,000 BTU or up to 3 HP) Fee $38.80 $38.80 Paid 08/01/2022
Building Permit Fee $3,523.50 $3,523.50 Paid 08/01/2022
Mechanical Permit Fee $40.00 $40.00 Paid 08/01/2022
Plumbing Fixtures Fee $26.00 $26.00 Paid 08/01/2022
Plumbing Permit Fee $40.00 $40.00 Paid 08/01/2022
Building Plan Review Fee $2,290.28 $2,290.28 Paid 03/22/2022
Mechanical Plan Review Fee $106.21 $106.21 Paid 08/01/2022
Plumbing Plan Review Fee $42.90 $42.90 Paid 08/01/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 08/01/2022
Sewer System Development ChargeFee - Tenant Improvment/Addition $789.26 $789.26 Paid 08/01/2022
Resubmittal Fee $130.00 $130.00 Paid 05/09/2022
Building Re-Inspection Fee $130.00 $130.00 Paid 10/12/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Frame Inspection Failed 9/28/2022 9/28/2022 09/28/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
09/28/2022
1:complete rough ins and electrical approval

Combination Frame And Rough In Inspection Failed 10/3/2022 10/3/2022 10/03/2022
Shannon King ((253) 840-6684)
Other/Miscellaneous
Carried Forward
10/03/2022
1. complete all R/I prior to next inspection 2. provide electrical cover inspection prior to next inspection 3. have all plumbing on test at time of next inspection 4. NOT READY

Combination Frame And Rough In Inspection Failed with Fee 10/5/2022 10/5/2022 10/05/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
10/05/2022
1. complete all R/I prior to next inspection 2. provide electrical cover inspection prior to next inspection 3. have all plumbing on test at time of next inspection 4. NOT READY

Other/Miscellaneous
Carried Forward
10/05/2022
1:complete joist blocking under walls above as per plan 2:complete wall x bracing as per plan 3:frame stairs as per plan (4x16 stringers with bearing walls below)

Shear Wall Inspection Partial Pass 10/13/2022 10/13/2022 10/13/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
10/13/2022
progressing with special inspections

Combination Frame And Rough In Inspection Partial Pass 10/13/2022 10/13/2022 10/13/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
10/13/2022
1. complete all R/I prior to next inspection 2. provide electrical cover inspection prior to next inspection 3. have all plumbing on test at time of next inspection 4. NOT READY

Other/Miscellaneous
Carried Forward
10/13/2022
provide rfi for stair stringers provide clarification on blocking joist above strap. provide detail/rfi for top of wall bracing where not at 45deg and where unable to alternate.

Wallboard / Drywall Inspection Failed 10/19/2022 10/19/2022 10/19/2022
Kevin Spruell ((253) 841-5590)
Other/Miscellaneous
Carried Forward
10/19/2022
1. complete drywall nailing as discussed with contractor 2. complete corrections from previous inspection as discussed with contractor 3. provide documentation on site as discussed with contractor for RFI

Ceiling Grid/T-Bar Inspection Failed 11/8/2022 11/8/2022 11/08/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
11/08/2022
complete rivets and perimeter wires upstairs, not ready

Other/Miscellaneous
Carried Forward
11/08/2022
complete rivets and perimeter wires upstairs, not ready

Mechanical Rough In Inspection Partial Pass 11/8/2022 11/8/2022 11/08/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
11/08/2022
provide install instructions at final for condensing units showing auto shut off switch and condensate line or install drain pans.

Ceiling Grid/T-Bar Inspection Failed 11/9/2022 11/9/2022 11/09/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
11/09/2022
1:see inspection dated 11/8/22

Plumbing Final Inspection Failed 11/15/2022 11/15/2022 11/15/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
11/15/2022
1:provide boots under sink on level 1

Building Final Inspection Failed 11/15/2022 11/15/2022 11/15/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Carried Forward
11/15/2022
1:provide fire final 2:provide accessibility survey from architect as per page G101 3:complete stair cladding 4:complete exit signs on level 1

Fire Or Smoke Damper Inspection VOID 11/15/2022
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs VOID 11/15/2022
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection VOID 11/15/2022
David Drake ((253) 864-4171)
Comment Building Div Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Comment Engineering Div Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Foundation/Rebar Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Roof Sheathing Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Firewall/Firestop Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Plumbing Below Slab Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Hydronic Piping Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Gas Test Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Exhaust Hood Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Light Test For Grease Duct Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Exhaust/Vent Fans Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Medical Gas Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Cover Inspection/Thrust Blocks Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Engineering Final Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Frame Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Shear Wall Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Combination Frame And Rough In Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)
Other/Miscellaneous
Outstanding
10/13/2022
1. complete all R/I prior to next inspection 2. provide electrical cover inspection prior to next inspection 3. have all plumbing on test at time of next inspection 4. NOT READY

Mechanical Rough In Inspection VOID 11/21/2022
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2018 IFC and 2018 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required contractor to provide light meter • Separate permits required for Fire Alarm and Fire Sprinkler • Fire extinguishers required per code • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake 253-864-4171 ddrake@puyallupwa.gov
Engineering Commercial Standard Conditions Open Development & Permitting Services Standard Conditions
: * Any addition/expansion to the foot print of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. * Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.

Related Permit & Planning Applications

Reference Number Status Type
PRFS20221197 Closed Fire Sprinklers
PRFA20221350 Closed Fire Alarms

Documents & Images