CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCTI20221019


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20221019
Commercial - Tenant Improvement/Remodel
Closed
AMB INSTITUTIONAL ALLIANCE FUND III LP
Alteration/Remodel
Tenant Improvement to build an a new office within an existing warehouse suite and revise an existing toilet partition to meet ADA standards in the existing men's restroom. Area of work: 2,755 SF No change to existing. - PROLOGIS SUITE 103
06/28/2022
07/20/2023
08/27/2024
02/28/2024

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Fire Review Approved 07/12/2023 06/27/2023
Fire Review Failed 05/17/2023 05/17/2023
Building Review Approved 05/17/2023 05/16/2023
Engineering Review Approved 05/17/2023 05/11/2023
Planning Review Approved 05/17/2023 05/09/2023
Engineering Traffic Review Approved 05/17/2023 05/03/2023
Building Review Failed 04/26/2023 04/26/2023
Planning Review Approved 04/26/2023 04/21/2023
Engineering Review Approved 04/26/2023 04/17/2023
Fire Review Failed 04/26/2023 04/17/2023
Engineering Traffic Review Approved 04/26/2023 04/14/2023
Building Review Failed 03/10/2023 03/13/2023
Planning Review Approved 03/10/2023 03/10/2023
Engineering Traffic Review Approved 03/10/2023 03/06/2023
Fire Review Failed 03/10/2023 02/27/2023
Engineering Review Approved 03/10/2023 02/24/2023
Planning Review Failed 08/02/2022 08/03/2022
Building Review Failed 08/02/2022 08/02/2022
Fire Review Approved 08/02/2022 07/29/2022
Engineering Review Approved 08/02/2022 07/18/2022
Engineering Traffic Review VOID 08/02/2022 07/13/2022

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 07/20/2023
Building Permit Fee $2,040.95 $2,040.95 Paid 07/20/2023
Building Plan Review Fee $1,326.62 $1,326.62 Paid 06/28/2022
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 07/20/2023
Sewer System Development ChargeFee - Tenant Improvment/Addition $10,201.20 $10,201.20 Paid 07/20/2023
Water System Development ChargeFee - Tenant Improvment/Addition $6,292.98 $6,292.98 Paid 07/20/2023
Resubmittal Fee $180.00 $180.00 Paid 04/12/2023
Resubmittal Fee $180.00 $180.00 Paid 05/02/2023
Furnace (up to 100,000 BTU) Fee $19.55 $19.55 Paid 07/20/2023
Gas Piping (Mechanical) Fee $6.30 $6.30 Paid 07/20/2023
AC Unit Fee $19.55 $19.55 Paid 07/20/2023
Mechanical Duct Work Fee $24.00 $24.00 Paid 07/20/2023
Unclassified Appliance or Equipment Fee $14.10 $14.10 Paid 07/20/2023
Mechanical Permit Fee $40.00 $40.00 Paid 07/20/2023
Drinking Fountain, Water Cooler, Ice Machine Fee $40.25 $40.25 Paid 07/20/2023
Plumbing Permit Fee $40.00 $40.00 Paid 07/20/2023
Plumbing Fixtures Fee $234.00 $234.00 Paid 07/20/2023
Water Heater Fee $13.00 $13.00 Paid 07/20/2023
Mechanical Plan Review Fee $80.28 $80.28 Paid 07/20/2023
Plumbing Plan Review Fee $212.71 $212.71 Paid 07/20/2023
Building Inspection Fee $180.00 $180.00 Paid 02/28/2024
Building Re-Inspection Fee $180.00 $180.00 Paid 02/28/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Plumbing Rough In Inspection Partial Pass 8/8/2023 8/8/2023 08/08/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/08/2023
1. provide as-built from engineer of record for changes made on city approved plans for pipe sizes 2. plumbing test approved pending as-built approval (below slab)

Foundation/Rebar Inspection Passed w/ Conditions 8/14/2023 8/14/2023 08/14/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
08/14/2023
1. provide engineers as-built approval for all under slab plumbing

Energy (Insulation) Inspection Failed 9/1/2023 9/1/2023 09/01/2023
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
09/01/2023
arrived on site 9:22 am talked to framer, he said no super on site and to check other building, unable to locate super .

Energy (Insulation) Inspection Not Ready 9/5/2023 9/5/2023 09/05/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/05/2023
1. complete insulation as discussed with contractor

Plumbing Rough In Inspection Partial Pass 9/15/2023 9/15/2023 09/15/2023
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
09/15/2023
1. provide as-built from engineer of record for changes made on city approved plans for pipe sizes 2. plumbing test approved pending as-built approval (below slab)

Frame Inspection Not Ready 9/18/2023 9/18/2023 09/19/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/19/2023
1.provide electrical cover approval at time of next inspection 2.not ready

Frame Inspection Not Ready 9/26/2023 9/26/2023 09/26/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/26/2023
1.provide electrical cover approval at time of next inspection 2.not ready

Other/Miscellaneous
Carried Forward
09/26/2023
1. cancelled by contractor

Frame Inspection Partial Pass 9/27/2023 9/27/2023 09/27/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/27/2023
1. no framing, MECH, plumbing, electrical was installed at I/T room and janitors closet at time of inspection 2. provide clarification of bracing at 32" on center on demising wall on detail 16 A2.1 on city approved plans 3. ok to insulate

Energy (Insulation) Inspection Partial Pass 10/5/2023 10/5/2023 10/05/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
10/05/2023
1. complete insulation as discussed with contractor

Other/Miscellaneous
Carried Forward
10/05/2023
1. no hard lids in bathrooms 2.clarify insulation over bathrooms 3.no demising wall need clarification on blocking in wall as discussed with contractor 4.all other interior and exterior walls ok to cover

Combination Frame And Rough In Inspection Partial Pass 10/5/2023 10/5/2023 10/05/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/05/2023
1.framing at roof modification for MECH approved 2.fasteners at curb to roof on roof for RTU approved 3. ok to roof 3.ok to insulate

Energy (Insulation) Inspection Partial Pass 10/12/2023 10/12/2023 10/12/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/12/2023
1. no hard lids in bathrooms 2.clarify insulation over bathrooms 3.no demising wall need clarification on blocking in wall as discussed with contractor 4.all other interior and exterior walls ok to cover

Other/Miscellaneous
Carried Forward
10/12/2023
1. rigid insulation at demising wall approved 2.insulation at roof where new mech comes thru roof approved

Wallboard / Drywall Inspection Partial Pass 10/12/2023 10/12/2023 10/12/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/12/2023
1. all dry wall ok to tape except hard lids in bathrooms where covered without inspections 2. there was no drywall installed at demising wall at time of inspection

Plumbing Rough In Inspection Partial Pass 10/20/2023 10/20/2023 10/20/2023
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
10/20/2023
1. provide as-built from engineer of record for changes made on city approved plans for pipe sizes 2. plumbing test approved pending as-built approval (below slab)

Other/Miscellaneous
Carried Forward
10/20/2023
drinking fountain dwv and supply ok

Mechanical Rough In Inspection Partial Pass 10/23/2023 10/23/2023 10/23/2023
Kevin Spruell ((253) 841-5590)
Frame Inspection Not Ready 10/23/2023 10/23/2023 10/24/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/24/2023
1. no framing, MECH, plumbing, electrical was installed at I/T room and janitors closet at time of inspection 2. provide clarification of bracing at 32" on center on demising wall on detail 16 A2.1 on city approved plans 3. ok to insulate

Other/Miscellaneous
Carried Forward
10/24/2023
1.THIS WAS A FRAMING INSPECTION OF I/T AND JANITOR CLOSET 2.provide fasteners at hard lid in to demising wall as discussed with contractor 3.provide electrical cover approval specific to this area 4. provide fire cover approval for this area prior to next inspection 5. provide access to drywall screws on demising wall as discussed with contractor

Frame Inspection Partial Pass 11/2/2023 11/2/2023 11/02/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Outstanding
09/26/2023
1.provide electrical cover approval at time of next inspection 2.not ready

Other/Miscellaneous
Outstanding
09/26/2023
1. cancelled by contractor

Other/Miscellaneous
Outstanding
11/02/2023
1. framing at I/T closet and janitor closet approved ok to insulate 2. framing at hard lids over bathrooms approved

Mechanical Rough In Inspection Partial Pass 11/3/2023 11/3/2023 11/03/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
11/03/2023
1. THIS WAS A INSULATION INSPECTION ONLY 2. insulation at I/T room and janitors closet approved 3. OK TO COVER

Frame Inspection Not Ready 11/6/2023 11/6/2023 11/06/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
11/06/2023
1. no framing, MECH, plumbing, electrical was installed at I/T room and janitors closet at time of inspection 2. provide clarification of bracing at 32" on center on demising wall on detail 16 A2.1 on city approved plans 3. ok to insulate

Other/Miscellaneous
Carried Forward
11/06/2023
1.THIS WAS A FRAMING INSPECTION OF I/T AND JANITOR CLOSET 2.provide fasteners at hard lid in to demising wall as discussed with contractor 3.provide electrical cover approval specific to this area 4. provide fire cover approval for this area prior to next inspection 5. provide access to drywall screws on demising wall as discussed with contractor

Other/Miscellaneous
Carried Forward
11/06/2023
1.cancelled on site by contractor

Ceiling Grid/T-Bar Inspection Not Ready 11/7/2023 11/7/2023 11/07/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
11/07/2023
1. complete all ceiling requirements as discussed with contractor

Frame Inspection Not Ready 11/8/2023 11/8/2023 11/08/2023
Kevin Spruell ((253) 841-5590)
Wallboard / Drywall Inspection Partial Pass 11/8/2023 11/8/2023 11/08/2023
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Resolved
11/08/2023
1. all dry wall ok to tape except hard lids in bathrooms where covered without inspections 2. there was no drywall installed at demising wall at time of inspection

Mechanical Rough In Inspection Passed 11/9/2023 11/9/2023 11/09/2023
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
11/03/2023
1. THIS WAS A INSULATION INSPECTION ONLY 2. insulation at I/T room and janitors closet approved 3. OK TO COVER

Fire Final Inspection Not Ready 12/21/2023 12/21/2023 12/21/2023
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Carried Forward
12/21/2023
Items discussed. 1. Fire Alarm, devices above ceiling, missing detection warehouse bathroom hallway, and all documentation. 2. Fire Sprinkler final requirements. 3. Emergency Lighting, tested the circuit, missing lighting throughout office space, warehouse half the lights works, half the bug eyes work. 4. All fire extinguishers have been removed, reinstall all through warehouse and office space.

Building Final Inspection Failed 2/21/2024 2/21/2024 02/21/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
02/21/2024
1. provide fire, engineering,and planning final approval prior to next inspection 2.provide balance report 3. provide plumbing boot at drain at break room sink 4. insulate recirc lines at hot water tank in janitors closet 5.complete birc clips 6. complete perimeter wires 7.provide occupancy signage at front door 8.complete plumbing boots at sinks in mens and womens bathrooms 9. complete partitions at existing mens bathrooms per city approved plans

Engineering Final Inspection Passed 2/23/2024 2/23/2024 02/23/2024
Jeff Hill ((253) 204-5633)
Erosion And Sediment Inspection Passed 02/23/2024
Jeff Hill ((253) 204-5633)
Comment Engineering Div Inspection Passed 02/23/2024
Jeff Hill ((253) 204-5633)
Cover Inspection/Thrust Blocks Inspection Passed 02/23/2024
Jeff Hill ((253) 204-5633)
Floodproof Certification Inspection Passed 02/23/2024
Jeff Hill ((253) 204-5633)
Elevation Verification Inspection Passed 02/23/2024
Jeff Hill ((253) 204-5633)
Fire Final Inspection Failed with Fee 2/27/2024 2/27/2024 02/27/2024
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Carried Forward
02/27/2024
Items discussed. 1. Fire Alarm, devices above ceiling, missing detection warehouse bathroom hallway, and all documentation. 2. Fire Sprinkler final requirements. 3. Emergency Lighting, tested the circuit, missing lighting throughout office space, warehouse half the lights works, half the bug eyes work. 4. All fire extinguishers have been removed, reinstall all through warehouse and office space.

Fire Sprinkler
Carried Forward
02/27/2024
Install fire sprinkler on both heads in warehouse rooms. Pay reinspection fee prior to calling for fire final again.

Planning Final Inspection VOID 2/23/2024 02/28/2024
Chris Beale ((253) 841-5418)
Fire Final Inspection Passed 2/28/2024 02/28/2024
David Drake ((253) 864-4171)
Corrections:


Other/Miscellaneous
Resolved
02/28/2024
Items discussed. 1. Fire Alarm, devices above ceiling, missing detection warehouse bathroom hallway, and all documentation. 2. Fire Sprinkler final requirements. 3. Emergency Lighting, tested the circuit, missing lighting throughout office space, warehouse half the lights works, half the bug eyes work. 4. All fire extinguishers have been removed, reinstall all through warehouse and office space.

Fire Sprinkler
Resolved
02/28/2024
Install fire sprinkler on both heads in warehouse rooms. Pay reinspection fee prior to calling for fire final again.

Mechanical Final Inspection Passed 2/29/2024 2/29/2024 02/29/2024
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Underfloor Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Slab/Insulation Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Block Wall Rebar Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Roof Sheathing Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Shear Wall Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Firewall/Firestop Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Exit Lighting Test Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Re-Roof Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Hydronic Piping Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Gas Test Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Carbon Monoxide Detectors Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Refrigeration Line Test Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Exhaust Hood Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Light Test For Grease Duct Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Exhaust/Vent Fans Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Medical Gas Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Fire Or Smoke Damper Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Hydrostatic Test 200Lbs 2Hrs VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Emergency Radio Test Review Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Plumbing Final Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Combination Frame And Rough In Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
10/05/2023
1.framing at roof modification for MECH approved 2.fasteners at curb to roof on roof for RTU approved 3. ok to roof 3.ok to insulate

Energy (Insulation) Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
10/12/2023
1. no hard lids in bathrooms 2.clarify insulation over bathrooms 3.no demising wall need clarification on blocking in wall as discussed with contractor 4.all other interior and exterior walls ok to cover

Other/Miscellaneous
Outstanding
10/12/2023
1. rigid insulation at demising wall approved 2.insulation at roof where new mech comes thru roof approved

Plumbing Rough In Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
10/20/2023
1. provide as-built from engineer of record for changes made on city approved plans for pipe sizes 2. plumbing test approved pending as-built approval (below slab)

Frame Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
11/06/2023
1. no framing, MECH, plumbing, electrical was installed at I/T room and janitors closet at time of inspection 2. provide clarification of bracing at 32" on center on demising wall on detail 16 A2.1 on city approved plans 3. ok to insulate

Other/Miscellaneous
Outstanding
11/06/2023
1.THIS WAS A FRAMING INSPECTION OF I/T AND JANITOR CLOSET 2.provide fasteners at hard lid in to demising wall as discussed with contractor 3.provide electrical cover approval specific to this area 4. provide fire cover approval for this area prior to next inspection 5. provide access to drywall screws on demising wall as discussed with contractor

Other/Miscellaneous
Outstanding
11/06/2023
1.cancelled on site by contractor

Ceiling Grid/T-Bar Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
11/07/2023
1. complete all ceiling requirements as discussed with contractor

Frame Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection VOID 02/29/2024
Monty Johnson ((253) 770-3326)
Building Final Inspection VOID 2/29/2024 2/29/2024 02/29/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
02/21/2024
1. provide fire, engineering,and planning final approval prior to next inspection 2.provide balance report 3. provide plumbing boot at drain at break room sink 4. insulate recirc lines at hot water tank in janitors closet 5.complete birc clips 6. complete perimeter wires 7.provide occupancy signage at front door 8.complete plumbing boots at sinks in mens and womens bathrooms 9. complete partitions at existing mens bathrooms per city approved plans

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS. 2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE. 3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE. 4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY" 5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION. 6. Fire alarm and Fire sprinkler require separate permits.
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
A Utility Connection/Repair permit must be issued to install the required sewer sampling tee. Another TI application, PRCTI2023 310, is under review for this building with this same condition. Once the the utility permit is issued both can be released. LL
Miscellaneous Condition Resolved Prior to Occupancy
Engineering Division
Occupancy will not be granted until the sewer sampling tee has been installed and a final inspection has been approved on the installation, see permit PRUSR20230614. LL 05/11/2023 Another TI application, PRCTI2023 310, is under review for this building with this same condition. Once the the sewer sampling tee has been installed and approved both can ask for a final engineering inspection. LL
Engineering Commercial Standard Conditions Open Standard Conditions
Development & Permitting Services
Development Engineering standard commercial conditions: - Occupancy will not be granted until all work associated with the required utility connection/repair permit to install the sewer sampling tee has been completed and approval has been provided. -- A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The record civil drawings indicate that a reduced pressure backflow assembly has been installed. However if one does not exist on the water service connections an approved backflow prevention assembly must be installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, - Due to the proximity of this property to a secondary water source (i.e. clarks creek, meeker ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.

Related Permit & Planning Applications

Reference Number Status Type
PRFA20221409 Closed Fire Alarms
PRCTI20230908 Closed Commercial - Tenant Improvement/Remodel

Documents & Images

Date Uploaded File Type Name
06/28/2022 Receipt Receipt for transaction:2022-001210
04/12/2023 Receipt Receipt for transaction:2023-000617
05/02/2023 Receipt Receipt for transaction:2023-000752
06/27/2023 Report 230502_Prologis Puyallup 1_TI_Structural RTU Calculations (Stamped)
06/27/2023 Form WSEC_Envelope Requirements List (Stamped)
06/27/2023 Form 220623_Prologis Puyallup 1 T_I__WSEC_Lighting Compliance Summary (Stamped)
06/27/2023 Form 220711_Prologis Puyallup 1 T_I__Plumbing Fixture Worksheet (Stamped)
06/28/2023 Plans 230502_Prologis Puyallup 1_TI_Combined Drawing Set_Resubmittal 3 (Stamped)
07/20/2023 Receipt Receipt for transaction: 2023-001373
07/20/2023 Receipt Receipt for transaction: 2023-001373
07/20/2023 Permit Permit - Detailed
07/20/2023 Letter Permit Job Card
08/08/2023 Report Inspection Report (Plumbing Rough In Inspection)
08/14/2023 Report Inspection Report (Foundation/Rebar Inspection)
09/05/2023 Report Inspection Report (Energy (Insulation) Inspection)
09/19/2023 Report Inspection Report (Frame Inspection)
09/26/2023 Report Inspection Report (Frame Inspection)
09/27/2023 Report Inspection Report (Frame Inspection)
10/05/2023 Report Inspection Report (Energy (Insulation) Inspection)
10/05/2023 Report Inspection Report (Combination Frame And Rough In Inspection)
10/12/2023 Report Inspection Report (Energy (Insulation) Inspection)
10/12/2023 Report Inspection Report (Wallboard / Drywall Inspection)
10/23/2023 Report Inspection Report (Mechanical Rough In Inspection)
10/24/2023 Report Inspection Report (Frame Inspection)
11/02/2023 Report Inspection Report (Frame Inspection)
11/03/2023 Report Inspection Report (Mechanical Rough In Inspection)
11/06/2023 Report Inspection Report (Frame Inspection)
11/07/2023 Report Inspection Report (Ceiling Grid/T-Bar Inspection)
11/08/2023 Report Inspection Report (Frame Inspection)
11/08/2023 Report Inspection Report (Wallboard / Drywall Inspection)
02/21/2024 Report Inspection Report (Building Final Inspection)
02/23/2024 Report Inspection Report (Engineering Final Inspection)
02/28/2024 Receipt Receipt for transaction:2024-000363
02/29/2024 Report Inspection Report (Building Final Inspection)
02/29/2024 Report Inspection Report (Building Final Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.