CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCTI20230310
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 06/08/2023 |
Building Permit Fee | $1,553.75 | $1,553.75 | Paid | 06/08/2023 |
Building Plan Review Fee | $1,009.94 | $1,009.94 | Paid | 03/14/2023 |
WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 06/08/2023 |
Air Handling Unit (Up to 10,000 cfm) Fee | $14.10 | $14.10 | Paid | 06/08/2023 |
Mechanical Duct Work Fee | $24.00 | $24.00 | Paid | 06/08/2023 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 06/08/2023 |
Mechanical Plan Review Fee | $50.77 | $50.77 | Paid | 06/08/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 05/23/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $3,162.56 | $3,162.56 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Frame Inspection | Not Ready | 7/5/2023 | 7/5/2023 | 07/05/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/05/2023
1. provide full size color city approved plan on site at time of next inspection
|
||||
Frame Inspection | Not Ready | 7/7/2023 | 7/7/2023 | 07/07/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/07/2023
1. provide full size color city approved plan on site at time of next inspection
|
||||
Other/Miscellaneous
Carried Forward
07/07/2023
1. no access building was locked 11:06 am at time of inspection
|
||||
Frame Inspection | Partial Pass | 7/10/2023 | 7/10/2023 | 07/10/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
07/10/2023
1. provide full size color city approved plan on site at time of next inspection
|
||||
Other/Miscellaneous
Resolved
07/10/2023
1. no access building was locked 11:06 am at time of inspection
|
||||
Wallboard / Drywall Inspection | Passed | 7/14/2023 | 7/14/2023 | 07/14/2023 |
Ray Cockerham ((253) 841-5585) | ||||
Energy (Insulation) Inspection | Passed | 7/14/2023 | 7/14/2023 | 07/14/2023 |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Resolved
07/14/2023
R 13 insulation demising wall completed per plan
|
||||
Mechanical Rough In Inspection | Partial Pass | 7/14/2023 | 7/14/2023 | 07/14/2023 |
Ray Cockerham ((253) 841-5585) | ||||
Shear Wall Inspection | Partial Pass | 7/19/2023 | 7/19/2023 | 07/19/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/19/2023
1. partial approval as marked up on plans sheet AI101
|
||||
Mechanical Rough In Inspection | Partial Pass | 8/3/2023 | 8/3/2023 | 08/03/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/03/2023
1. ok to insulate duct as discussed
2.no seismic was in place at time of inspection
3.smoke damper was not in place at time of inspection
4. cold air return drops where not installed at time of inspection
|
||||
Shear Wall Inspection | Partial Pass | 8/14/2023 | 8/14/2023 | 08/14/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/14/2023
1. partial approval as marked up on plans sheet AI101
|
||||
Other/Miscellaneous
Carried Forward
08/14/2023
1. treated plywood completed and approved
|
||||
Shear Wall Inspection | Partial Pass | 8/16/2023 | 8/16/2023 | 08/16/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/16/2023
1. partial approval as marked up on plans sheet AI101
|
||||
Other/Miscellaneous
Carried Forward
08/16/2023
1. treated plywood completed and approved
|
||||
Other/Miscellaneous
Carried Forward
08/16/2023
1. vapor barrier approved
|
||||
Shear Wall Inspection | Partial Pass | 8/21/2023 | 8/21/2023 | 08/21/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/21/2023
1. partial approval as marked up on plans sheet AI101
|
||||
Other/Miscellaneous
Carried Forward
08/21/2023
1. treated plywood completed and approved
|
||||
Other/Miscellaneous
Carried Forward
08/21/2023
1. vapor barrier approved
|
||||
Other/Miscellaneous
Carried Forward
08/21/2023
1. rigid foam approved
|
||||
Shear Wall Inspection | Not Ready | 8/28/2023 | 8/28/2023 | 08/28/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/28/2023
1. partial approval as marked up on plans sheet AI101
|
||||
Other/Miscellaneous
Carried Forward
08/28/2023
1. treated plywood completed and approved
|
||||
Other/Miscellaneous
Carried Forward
08/28/2023
1. vapor barrier approved
|
||||
Other/Miscellaneous
Carried Forward
08/28/2023
1. rigid foam approved
|
||||
Other/Miscellaneous
Carried Forward
08/28/2023
1.cancelled by contractor
|
||||
Shear Wall Inspection | Partial Pass | 8/30/2023 | 8/30/2023 | 08/30/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
08/30/2023
1. partial approval as marked up on plans sheet AI101
|
||||
Other/Miscellaneous
Carried Forward
08/30/2023
1. treated plywood completed and approved
|
||||
Other/Miscellaneous
Carried Forward
08/30/2023
1. vapor barrier approved
|
||||
Other/Miscellaneous
Carried Forward
08/30/2023
1. rigid foam approved
|
||||
Other/Miscellaneous
Carried Forward
08/30/2023
1.cancelled by contractor
|
||||
Other/Miscellaneous
Carried Forward
08/30/2023
1. furring strip attachment approved 8/30/2023
|
||||
Shear Wall Inspection | Failed | 9/11/2023 | 9/11/2023 | 09/11/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/11/2023
1. partial approval as marked up on plans sheet AI101
|
||||
Other/Miscellaneous
Carried Forward
09/11/2023
1. treated plywood completed and approved
|
||||
Other/Miscellaneous
Carried Forward
09/11/2023
1. vapor barrier approved
|
||||
Other/Miscellaneous
Carried Forward
09/11/2023
1. rigid foam approved
|
||||
Other/Miscellaneous
Carried Forward
09/11/2023
1.cancelled by contractor
|
||||
Other/Miscellaneous
Carried Forward
09/11/2023
1. furring strip attachment approved 8/30/2023
|
||||
Other/Miscellaneous
Carried Forward
09/11/2023
1. removed 5 sheets of drywall to verify seams breaking on furring strips per city approved plans 3 locations did not. provide clarification from architect that what is on site is acceptable to his design
2. there was no drywall nailing looked at at time of inspection
date 09/11/2023
|
||||
Shear Wall Inspection | Partial Pass | 9/13/2023 | 9/13/2023 | 09/14/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/14/2023
1. partial approval as marked up on plans sheet AI101
|
||||
Other/Miscellaneous
Carried Forward
09/14/2023
1. treated plywood completed and approved
|
||||
Other/Miscellaneous
Carried Forward
09/14/2023
1. vapor barrier approved
|
||||
Other/Miscellaneous
Carried Forward
09/14/2023
1. rigid foam approved
|
||||
Other/Miscellaneous
Carried Forward
09/14/2023
1.cancelled by contractor
|
||||
Other/Miscellaneous
Carried Forward
09/14/2023
1. furring strip attachment approved 8/30/2023
|
||||
Other/Miscellaneous
Resolved
09/14/2023
1. removed 5 sheets of drywall to verify seams breaking on furring strips per city approved plans 3 locations did not. provide clarification from architect that what is on site is acceptable to his design
2. there was no drywall nailing looked at at time of inspection
date 09/11/2023
|
||||
Other/Miscellaneous
Carried Forward
09/14/2023
1. letter from architect regarding furring strips approved
2.drywall approved for tapping
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 10/10/2023 | 10/10/2023 | 10/10/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/10/2023
1. complete all ceiling requirements as discussed with contractor
|
||||
Mechanical Final Inspection | Not Ready | 10/11/2023 | 10/11/2023 | 10/11/2023 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/11/2023
1:complete screws in diffusers
2:provide electrical final
3:provide balance report to include osa
|
||||
Mechanical Rough In Inspection | Partial Pass | 10/23/2023 | 10/23/2023 | 10/23/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
10/23/2023
1. ok to insulate duct as discussed
2.no seismic was in place at time of inspection
3.smoke damper was not in place at time of inspection
4. cold air return drops where not installed at time of inspection
|
||||
Other/Miscellaneous
Carried Forward
10/23/2023
1. diffusers at ceiling grid approved
|
||||
Mechanical Final Inspection | Not Ready | 10/23/2023 | 10/23/2023 | 10/23/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/23/2023
1.not ready
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 10/23/2023 | 10/23/2023 | 10/24/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/24/2023
1. complete all ceiling requirements as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
10/24/2023
1.complete perimeter wires as discussed with contractor
2. complete positive attachment to light fixtures as discussed with contractor
3.provide BIRC clips as discussed with contractor
4.provide electrical cover approval at time of next inspection
|
||||
Ceiling Grid/T-Bar Inspection | Failed | 10/30/2023 | 10/30/2023 | 10/30/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
10/30/2023
1. complete all ceiling requirements as discussed with contractor
|
||||
Other/Miscellaneous
Carried Forward
10/30/2023
1.complete perimeter wires as discussed with contractor
2. complete positive attachment to light fixtures as discussed with contractor
3.provide BIRC clips as discussed with contractor
4.provide electrical cover approval at time of next inspection
|
||||
Other/Miscellaneous
Carried Forward
10/30/2023
1. provide electrical cover approval from previous inspection
|
||||
Frame Inspection | Partial Pass | 10/31/2023 | 10/31/2023 | 10/31/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Fire Final Inspection | Not Ready | 12/21/2023 | 12/21/2023 | 12/21/2023 |
David Drake ((253) 864-4171) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
12/21/2023
Items discussed.
1. Fire Alarm, devices above ceiling, missing detection warehouse bathroom hallway, and all documentation.
2. Fire Sprinkler final requirements.
3. Emergency Lighting, tested the circuit, missing lighting throughout office space, warehouse half the lights works, half the bug eyes work.
4. All fire extinguishers have been removed, reinstall all through warehouse and office space.
|
||||
Fire Final Inspection | Not Ready | 3/8/2024 | 3/8/2024 | 03/08/2024 |
David Drake ((253) 864-4171) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
03/08/2024
Items discussed.
1. Fire Alarm, devices above ceiling, missing detection warehouse bathroom hallway, and all documentation.
2. Fire Sprinkler final requirements.
3. Emergency Lighting, tested the circuit, missing lighting throughout office space, warehouse half the lights works, half the bug eyes work.
4. All fire extinguishers have been removed, reinstall all through warehouse and office space.
|
||||
Other/Miscellaneous
Carried Forward
03/08/2024
1. All of the original work has been removed. Project was taken to ceiling cover prior to second demo.
2. Fire Sprinkler permit is expired, apply for a new permit once new scope of work has been designed.
3. L&i permit will be required prior to inspections since everything was demoed for a second time.
4. Fire Alarm Devices will need to be reinstalled above ceiling. Install devices at roof deck for code compliance immediately.
5. Apply for a new Building T.I. permit under the 2021 codes unless a complete submittal can be excepted prior to March 15th.
6. Architect required to address energy code requirements along with a mechanical engineer. I would suggest onsite visits for all subs starting over.
7. All mechanical and lighting that is not installed per the manufactures install methods needs to be secured or removed for safety.
8. Below ceiling sprinkler system can be capped while work is completed above. The below ceiling fire sprinkler system is only required once the drop tiles are in place.
9. Permit Center has been notified of the changes.
|
||||
Ceiling Grid/T-Bar Inspection | Not Ready | 3/8/2024 | 3/8/2024 | 03/08/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Resolved
03/08/2024
1. complete all ceiling requirements as discussed with contractor
|
||||
Other/Miscellaneous
Resolved
03/08/2024
1.complete perimeter wires as discussed with contractor
2. complete positive attachment to light fixtures as discussed with contractor
3.provide BIRC clips as discussed with contractor
4.provide electrical cover approval at time of next inspection
|
||||
Other/Miscellaneous
Resolved
03/08/2024
1. provide electrical cover approval from previous inspection
|
||||
Other/Miscellaneous
Carried Forward
03/08/2024
1. this was a comment inspection
2.provide new plans for new scope of work submit to city and obtain new permits as discussed with contractor
|
||||
Comment Building Div Inspection | Not Ready | 4/25/2024 | 4/25/2024 | 04/25/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
04/25/2024
1. discussed new permit old permit and current scope of work
|
||||
Mechanical Rough In Inspection | Partial Pass | 7/23/2024 | 7/23/2024 | 07/23/2024 |
Monty Johnson ((253) 770-3326) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
07/23/2024
1. diffusers at ceiling grid approved
|
||||
Other/Miscellaneous
Carried Forward
07/23/2024
insulated duct work ok
|
||||
Engineering Final Inspection | Passed | 09/06/2024 | ||
Michael Rosenau ((253) 344-6753) | ||||
Comment Engineering Div Inspection | Passed | 09/06/2024 | ||
Michael Rosenau ((253) 344-6753) | ||||
Erosion And Sediment Inspection | Passed | 09/06/2024 | ||
Michael Rosenau ((253) 344-6753) | ||||
Elevation Verification Inspection | VOID | 09/06/2024 | ||
Michael Rosenau ((253) 344-6753) | ||||
Floodproof Certification Inspection | VOID | 09/06/2024 | ||
Michael Rosenau ((253) 344-6753) | ||||
Building Final Inspection | Failed | 9/9/2024 | 9/9/2024 | 09/09/2024 |
Kevin Spruell ((253) 841-5590) | ||||
Corrections:
Other/Miscellaneous
Carried Forward
09/09/2024
date of inspection 9/9/2024
1.complete roof repairs as discussed with contractor
|
||||
Building Final Inspection | Passed | 9/12/2024 | 9/12/2024 | 10/03/2024 |
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Resolved
10/03/2024
date of inspection 9/9/2024
1.complete roof repairs as discussed with contractor
|
||||
Footing/Setback Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Foundation/Rebar Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Underfloor Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Slab/Insulation Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Block Wall Rebar Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Firewall/Firestop Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Re-Roof Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Refrigeration Line Test Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Exhaust/Vent Fans Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Fire Or Smoke Damper Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Cover Inspection/Thrust Blocks Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Hydrostatic Test 200Lbs 2Hrs | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Emergency Radio Test Review Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Planning Final Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Shear Wall Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Outstanding
09/14/2023
1. partial approval as marked up on plans sheet AI101
|
||||
Other/Miscellaneous
Outstanding
09/14/2023
1. treated plywood completed and approved
|
||||
Other/Miscellaneous
Outstanding
09/14/2023
1. vapor barrier approved
|
||||
Other/Miscellaneous
Outstanding
09/14/2023
1. rigid foam approved
|
||||
Other/Miscellaneous
Outstanding
09/14/2023
1.cancelled by contractor
|
||||
Other/Miscellaneous
Outstanding
09/14/2023
1. furring strip attachment approved 8/30/2023
|
||||
Other/Miscellaneous
Outstanding
09/14/2023
1. letter from architect regarding furring strips approved
2.drywall approved for tapping
|
||||
Mechanical Final Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Outstanding
10/23/2023
1.not ready
|
||||
Frame Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Fire Final Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/08/2024
Items discussed.
1. Fire Alarm, devices above ceiling, missing detection warehouse bathroom hallway, and all documentation.
2. Fire Sprinkler final requirements.
3. Emergency Lighting, tested the circuit, missing lighting throughout office space, warehouse half the lights works, half the bug eyes work.
4. All fire extinguishers have been removed, reinstall all through warehouse and office space.
|
||||
Other/Miscellaneous
Outstanding
03/08/2024
1. All of the original work has been removed. Project was taken to ceiling cover prior to second demo.
2. Fire Sprinkler permit is expired, apply for a new permit once new scope of work has been designed.
3. L&i permit will be required prior to inspections since everything was demoed for a second time.
4. Fire Alarm Devices will need to be reinstalled above ceiling. Install devices at roof deck for code compliance immediately.
5. Apply for a new Building T.I. permit under the 2021 codes unless a complete submittal can be excepted prior to March 15th.
6. Architect required to address energy code requirements along with a mechanical engineer. I would suggest onsite visits for all subs starting over.
7. All mechanical and lighting that is not installed per the manufactures install methods needs to be secured or removed for safety.
8. Below ceiling sprinkler system can be capped while work is completed above. The below ceiling fire sprinkler system is only required once the drop tiles are in place.
9. Permit Center has been notified of the changes.
|
||||
Ceiling Grid/T-Bar Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Outstanding
03/08/2024
1. this was a comment inspection
2.provide new plans for new scope of work submit to city and obtain new permits as discussed with contractor
|
||||
Comment Building Div Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Outstanding
04/25/2024
1. discussed new permit old permit and current scope of work
|
||||
Mechanical Rough In Inspection | VOID | 10/03/2024 | ||
Ray Cockerham ((253) 841-5585) | ||||
Corrections:
Other/Miscellaneous
Outstanding
07/23/2024
1. diffusers at ceiling grid approved
|
Condition | Status | Category |
---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions |
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
Fire Review Conditions | Open | Standard Conditions |
• Comply with 2018 IFC and 2018 IBC
• Total coverage required in the city of puyallup
• L&I Final required prior to Fire Final
• Exit lighting test required, contractor to provide light meter
• Separate permits required for Fire Alarm and Fire Sprinkler
• RTU’S will be required to be tested for shut down
• Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection.
• Fire extinguishers required per code
• A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System.
• PIV must have a Knox lock or approved lock with an extra key provided in Knox box
• Existing buildings will need to contact central pierce fire & rescue and update the key in the Knox box
• All above items to be completed prior to fire final. Fire final required before building final
Schedule your inspection online through the City of Puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email prior to inspection for date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
Miscellaneous Condition | Resolved | Prior to Issuance |
Engineering Division
A Utility Connection/Repair permit must be issued to install the required sewer sampling tee. Another TI application, PRCTI20221019, is under review for this building with this same condition. Once the the utility permit is issued both can be released. LL
|
||
Miscellaneous Condition | Resolved | Prior to Occupancy |
Engineering Division
Occupancy will not be granted until the sewer sampling tee has been installed and a final inspection has been approved on the installation. Another TI application, PRCTI20221019, is under review for this building with this same condition. Once the the sewer sampling tee has been installed and approved both can ask for a final engineering inspection. LL
Sewer sampling tee has been installed and approved by Jeff Hill under permit # PRUSR20230614. MR
|
||
Engineering Commercial Standard Conditions | Open | Standard Conditions |
Engineering Division
Development Engineering standard commercial conditions:
- Occupancy will not be granted until all work associated with the required utility connection/repair permit PRUSR20230614 to install the sewer sampling tee has been completed and approval has been provided.
-- A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer.
- The record civil drawings indicate that a reduced pressure backflow assembly has been installed. However if one does not exist on the water service connections an approved backflow prevention assembly must be installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup,
- Due to the proximity of this property to a secondary water source (i.e. clarks creek, meeker ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
Reference Number | Status | Type |
---|---|---|
PRUSR20230614 | Closed | Utility Service Repair/PRIVATE PROPERTY ONLY |
PRFS20230864 | Expired | Fire Sprinklers |
PRFA20230883 | Closed | Fire Alarms |
PRFA20231139 | Closed | Fire Alarms |
PRFA20231193 | Closed | Fire Alarms |
PRCTI20240469 | Closed | Commercial - Tenant Improvement/Remodel |
PRFS20240702 | Permit(s) Issued | Fire Sprinklers |
PRCTI20250557 | Closed | Commercial - Tenant Improvement/Remodel |
PRSG20250891 | Closed | Sign/Awning |
PRCTI20251104 | Ready for Issuance | Commercial - Tenant Improvement/Remodel |
PRCTI20251201 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRSG20251300 | Permit(s) Issued | Sign/Awning |
PRFA20251359 | In Plan Check | Fire Alarms |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.